The various forms of action depicted in Table 4.1 illustrate the details of stimuli introduced to project activities in order to observe and record the results. The first stimulating action introduced was the signing of a Memorandum of Understanding with role-players.
During this phase, a MoU was signed with all the companies sub-contracted to provide various professional services to the project through their respective representatives such as the Architect, Quantity surveyor, Civil engineer, Structural engineer, Electrical engineer, Social facilitator and the Occupational health and safety (OHS) consultant who were a part of the professional team. A sample of the MoU is presented as Annexure J. This process was conducted in accordance with the phases within the action research cycle of diagnosing, action taking, evaluation and specifying learning based on Figure 3.6 in the previous chapter
94
3. The process conducted within the action research cycle was also conducted during Action 1 with the purpose of ensuring that the delays caused during orientation of new team members and differences in their approach for executing certain activities were managed. This was done in view of data analysed from focus group 1 workshop participants and according to conclusions reached by some scholars in the literature review (Thomas, 2013; Bilau, 2015).
4.3.2.1 Diagnosing
Diagnosis is described as a judgement about what a particular problem is (McIntosh, 2013). The underlying problem related to the lack of stability caused by a high staff turnover within the professional team members assigned to the project by the respective consulting firms sub-contracted to the project for various services. This was one of the identified potential risks reflected in the previous chapters as well as an inference made from the information provided by the focus group during the workshop. The risk was mainly based on the delays resulting from the newly assigned people to the project because so much time was spent on orientating the new team members to both the project and other related project role- players. This also affected the newly assigned person’s ability to move at the same pace on project activities as other existing members of the professional team as revealed in the literature review. Also identified as a potential problem was the difference in the level of experience and competence between the predecessor and the successor (Bilau, 2015). The above risk was emphasised in the fact that the person withdrawn from the project was more experienced and competent than the new person brought onto the team, which in certain situations resulted in the difference of approaches adopted to handle project activities (Thomas, 2013). The other risk diagnosed related to the constant changes in design which had an effect on both the quality and time constraints of the project. The results revealed that errors in designs and drawings also had an impact especially when the newly assigned team member to the project relied on the design which had an error as this caused further time delays to correct through the issuing of revised drawings (Goede et al., 2012).
4.3.2.2 Action Planning
During this phase, a plan to manage the risk of high staff turnover on the project was conceptualised with the aim of finding a way to ensure that the high staff turnover on professional team members was significantly reduced. This plan included obtaining of a
95
commitment from firms sub-contracted to the project to make sure that unnecessary replacement of professional team members on the project was minimised and where it was unavoidable, proper team induction of newly assigned team members was complied with in accordance with action number 5 in Figure 3.6.
4.3.2.3 Action Taking
A Memorandum of Understanding (MoU) is signed with each of the consulting firms, forming the professional team on the project where an undertaking was made by all firms to retain and maintain their staff who were part of the professional team of consultants assigned to the project for the entire duration of the project without being replaced unless the situation was unavoidable.
4.3.2.4 Evaluation
The action taken during this phase was evaluated and the foremost observation was that turnover on the professional team members decreased drastically from an average of three every month to zero. The consistency in the team members further contributed to the stability on the construction project site. This is done in accordance with what the literature review revealed relating to the success of the intervention which was said to be the most important in any critical research project (Goede et al., 2012). It was also noted that design related disputes and general strategic approach disputes among the professional team were no longer experienced on the project. This was because of consistency in the agreed upon project execution protocols which were planned during the initial technical meeting before the implementation of the conceptualised actions for the duration of the project. Time spent on orientation and induction of new team members which previously accounted for time wastage was also reduced and ceased to be a cause for concern.
4.3.2.5 Specified Learning
The outcome of the action introduced in paragraph 4.3.1.1 drew the researcher to conclude that high staff turnover in the members of the professional team members had an effect on the constraint of time and quality on a construction project. The reasoning is owed to the fact that improved quality and less time wasted were observed when Action 1 stimulus was introduced to the project activities. Stability in the professional team on the project also enhanced a good working relationship between team members as no member complained to the project manager against a fellow team member for either unnecessary delays, time
96
wastage or design and frequent task sequence changes. The specified learning resulting from the signing of an understanding was that a stable and consistent professional team resulted in good working relationships among team members and prevented unnecessary delays. This also led to the maintenance and compliance with set project quality standards.