Ramsar COP11 DR10, Rev.1 Draft Resolution XI.10 , Rev. 1 Wetlands and energy issues
Texto completo
Documento similar
The assessment and management of environmental noise in Granada has been done, according to law, through the elaboration of Strategic Noise Maps (SNM) and Noise Action Plans
In order to estimate the systematic uncertainty on the total flux due to the angular resolution difference between data and MC simulation, a predicted energy spectrum is made
Each one of these constructs refers to the impact of IT on each one of the eight TQM dimensions shown in Figure 1: impact of IT on top management support, impact of IT on
The results show that: (1) creativity positively affects innovation in SMEs; (2) perceived environmental barriers impact on both managers' and employees' barriers;
Such a resolution is called an embedded Q-resolution, and it is this formula that we will use to compute the monodromy eigenvalues associated with a space monomial curve Y ⊂ C g+1
This work was divided into two main sections: the assessment of the strategic environmental sensitivity (SES) in the entire Peruvian marine- coastal zone, and a practical example of
The current study discusses initiatives to achieve environmental sustainability in manufacturing processes, and focuses in particular on the application of the environmental
The project exploited medium- resolution (Sentinel-1) and high-resolution (COSMO-SkyMed) satellite images to generate ground displacement maps at interregional scale and detect