• No se han encontrado resultados

TítuloAnteproyecto petrolero de 80 000 T P M

N/A
N/A
Protected

Academic year: 2020

Share "TítuloAnteproyecto petrolero de 80 000 T P M"

Copied!
101
0
0

Texto completo

Loading

Figure

Tabla 3-1 – Resumen potencias elementos y equipos  Fuente: Propia a partir del resto del proyecto y cuadernos
Figura 3.2 - Factor Kb para el cabrestante  Fuente: Lloyd's Register
Figura 3-3 - Molinete
Figura 3.4 – Servomotor Modelo RV/IRV
+7

Referencias

Documento similar

 International Journal of Electrical Power and Energy Systems Engineering.  International Journal of Electrical, Computer, and

The position of a food source represents a possible solution of the issue of optimization, and the quantity of nectar or the productivity of a food source corresponds to the

In the article, the different aspects that influence the use of the forest wastes like power source are analyzed, specially in the electrical energy transformation, focusing

This LTP evoked by sensory or electrical stimulation was prevented in the presence of antagonists of either muscarinic receptors (mAChRs; 5 mg/Kg atropine) or metabotropic

The motor-compressor electrical power consumption, cooling capacity, discharge temperature, and refrigerant mass flow rate objective functions are achieved with the help of

In the previous sections we have shown how astronomical alignments and solar hierophanies – with a common interest in the solstices − were substantiated in the

The electrical hardware and control equipment shall be proposed by the Contractor and approved by the EPT.. This phase will start with the Authorization to

re tied voltage of the Devi e under test (DUT) shall be measured. The signal