Universidad Metropolitana Repaso PCMAS
Texto completo
Documento similar
If certification of devices under the MDR has not been finalised before expiry of the Directive’s certificate, and where the device does not present an unacceptable risk to health
In addition to the requirements set out in Chapter VII MDR, also other MDR requirements should apply to ‘legacy devices’, provided that those requirements
The notified body that issued the AIMDD or MDD certificate may confirm in writing (after having reviewed manufacturer’s description of the (proposed) change) that the
Dada la endogeneidad de la respuesta de la política monetaria a la evolución prevista para la economía, esta evolución de las cotizaciones bancarias ante sorpresas monetarias puede
Polígon industrial Torrent d'en Puig. Polígonindustrial de Can
CADA UNA DE LAS FASES EN LAS QUE SE DIVIDE EL PROCESO PENAL ESTÁ PRESIDIDA POR UN PRINCIPIO DISTINTO. HASTA EL PUNTO DE QUE EL JUEZ DE INSTRUCCIÓN NO ESTÁ VINCULADO POR LOS HECHOS
Para este estudio se partió de la concepción que plantea el Ministerio del Poder Popular para la Educación (MPPE, 2007, p.. 180 proporcionando datos para realimentar y
En cuarto lugar, se establecen unos medios para la actuación de re- fuerzo de la Cohesión (conducción y coordinación de las políticas eco- nómicas nacionales, políticas y acciones