• No se han encontrado resultados

Reference Model and Methodology to Configure/Reconfigure Integrated Product, Process and Facility Development Processes

N/A
N/A
Protected

Academic year: 2017

Share "Reference Model and Methodology to Configure/Reconfigure Integrated Product, Process and Facility Development Processes"

Copied!
113
0
0

Texto completo

Loading

Figure

Table 2­1 How the segmented view of commercialization corresponds with conventional stages intechnological innovation [Jolly 1997] 7
Figure 1­1 Figure 2­1 
Figure 2­2 The proposed integrated development model for the total view approach
Figure 2­3 A representation of the total view approach
+7

Referencias

Documento similar

We want to reaffirm the commitment of the entire USC Government team to knowledge transfer and entrepreneurship services, including AVTE that assumes the essential tasks

o The three groups are constantly involved in a two-way knowledge and technology transfer process. o Shared knowledge of these processes supports and enhances the performance of

The article ends with an examination of the transnational operations in Cuba of the French firm Derosne & Cail, one of the most innovative engineering firms of

A framework model was developed and tested to examine relationships amongst and between six TQM dimensions (Employee Relationships, Organisation, Product Design Process,

With respect to the product of area and the global heat transfer coefficient air cooler is shown how the product of area and the global heat transfer coefficient increases

In this context, “CYD Report 2014” on Spanish universities performance, places the University of Santiago de Compostela in the 4th position in number of priority patent

Xiao and co-workers have developed a photocatalyst 16 containing a thioxanthone component, acting as the energy transfer sensitizer attached to a chiral

In this case using Design for manufacturing, the material and the manufacturing process used to make the product will be identified to simplify the design of