Figure 2.2: Left: Original 2-dimensional input data. Right: The data is zero-centered by subtracting the mean in each dimension
Figure 3.1: Overview of the general system
Figure 3.2: Description of the Load Forecasting system
Table 3.1: Covariance table between the first 12 hours of a day using data from a real secondary substation
+7

Referencias

Documento similar

Firstly, it responds in some way to its historical and cultural moment: it is a work designed with a classical 19 th century construction methodology (through

When wages increase (the case of a fall in the wages is symmetrical and therefore it is not necessary to examine it separately) the national sales increase in a magnitude

Government policy varies between nations and this guidance sets out the need for balanced decision-making about ways of working, and the ongoing safety considerations

We know that this is the right way to look at it because firstly switching lensing on and off in the difference spectra for this case has only very little impact, and secondly

Modernism is one of the most predominant artistic styles in the Valencian Community, and due to its relevance and the link it has, in this case, with the orange trade in Burriana,

(3) There is an additional output node, in which the parsed string can be found: this is a version of the input, enriched with information that will make it possible to reconstruct

It is clear that more work is needed in order to understand the relative contributions of the ZA, LA and TA modes to the thermal conductivity of supported Gr. From the

Knowing this time difference is crucial project because it is a value to know the synchronisation The tool used to find this time difference was a lo computer and