• No se han encontrado resultados

ANALISIS Y PROPUESTA DE CONTROL DE RUIDO EN LA ESTACIÓN HIDALGO DE LA LÍNEA 2 Y 3 DEL SISTEMA COLECTIVO METRO

N/A
N/A
Protected

Academic year: 2017

Share "ANALISIS Y PROPUESTA DE CONTROL DE RUIDO EN LA ESTACIÓN HIDALGO DE LA LÍNEA 2 Y 3 DEL SISTEMA COLECTIVO METRO"

Copied!
121
0
0

Texto completo

Loading

Figure

Tabla 1.1: Metros del mundo
Figura 1.1: Red del metro de la Ciudad de México
Tabla 2.1: Octavas
Figura 3.2: Usuarios del STC Metro en la estación Hidalgo (línea 2)
+7

Referencias

Documento similar

If certification of devices under the MDR has not been finalised before expiry of the Directive’s certificate, and where the device does not present an unacceptable risk to health

In addition to the requirements set out in Chapter VII MDR, also other MDR requirements should apply to ‘legacy devices’, provided that those requirements

The notified body that issued the AIMDD or MDD certificate may confirm in writing (after having reviewed manufacturer’s description of the (proposed) change) that the

Cedulario se inicia a mediados del siglo XVIL, por sus propias cédulas puede advertirse que no estaba totalmente conquistada la Nueva Gali- cia, ya que a fines del siglo xvn y en

Products Management Services (PMS) - Implementation of International Organization for Standardization (ISO) standards for the identification of medicinal products (IDMP) in

Products Management Services (PMS) - Implementation of International Organization for Standardization (ISO) standards for the identification of medicinal products (IDMP) in

This section provides guidance with examples on encoding medicinal product packaging information, together with the relationship between Pack Size, Package Item (container)

Package Item (Container) Type : Vial (100000073563) Quantity Operator: equal to (100000000049) Package Item (Container) Quantity : 1 Material : Glass type I (200000003204)