• No se han encontrado resultados

The use of UML activity diagrams and the i* language in the modeling of the balanced scorecard implantation process

N/A
N/A
Protected

Academic year: 2017

Share "The use of UML activity diagrams and the i* language in the modeling of the balanced scorecard implantation process"

Copied!
7
0
0

Texto completo

Loading

Figure

Figure 2. Strategic Map
Table 1.  Strategic impact and generalization of activities
Figure 3.  Activity Diagram of the Balanced Scorecard Implantation Process
Figure 5. Abstract actors relationships

Referencias

Documento similar

 The expansionary monetary policy measures have had a negative impact on net interest margins both via the reduction in interest rates and –less powerfully- the flattening of the

In this present work, inspired of the over and under projection with a fixed ratio methods, proposed by Agmon, we consider a class of extended relaxation methods depending on

The Dwellers in the Garden of Allah 109... The Dwellers in the Garden of Allah

The RT system includes the following components: the steady state detector used for model updating, the steady state process model and its associated performance model, the solver

We extend the ‘black box’ picture of public management and the ‘balanced view’ of HRM literature to explore, in the public context, the impact of structural

In the previous sections we have shown how astronomical alignments and solar hierophanies – with a common interest in the solstices − were substantiated in the

The objective of this paper is to present the development process followed to obtain a control system architecture for teleoperated robots, using the Unified Modeling Lan- guage–

This paper presents the engineering process we have followed to obtain the safety requirements in one of the robots of the EFTCoR 1 project and the way this requirements have