• No se han encontrado resultados

Temporal validation of extended workflow processes by means Petri Nets with Clocks

N/A
N/A
Protected

Academic year: 2017

Share "Temporal validation of extended workflow processes by means Petri Nets with Clocks"

Copied!
11
0
0

Texto completo

Loading

Figure

Fig. 1: Activity kinds
Fig. 3 – Atributes JOIN and SPLIT
Fig. 4: Activity Structure
Fig. 5: Structures Correspondence
+2

Referencias

Documento similar

The validation of the temperature drop and cooling efficiency of the cooling pad numerical model is the main objective of this paper, and, in order to get this

The validation of the temperature drop and cooling efficiency of the cooling pad numerical model is the main objective of this paper, and, in order to get this

Therefore, the aim of this Chapter is to carry out a study to compare side by side partial nitrification in a SBR reactor and in a chemostat SHARON process to achieve a

The objective of this study is to carry out a descriptive analysis in order to define and understand the concept of corporate social impact and analyze different methodologies

In order to design the digit-serial accumulator, several modifications of the adder cell (Fig.1.b) are necessary. Each accumulator cell must propagate its carry-out to the next cell,

In the “big picture” perspective of the recent years that we have described in Brazil, Spain, Portugal and Puerto Rico there are some similarities and important differences,

In order to design the accumulator several modifications of the digit-serial adder cell are necessary. The digit- serial accumulator cell allows the carry-out to propagate to the

In addition to the different successions and conceptions of computational thinking, in order to be able to work effectively in the classroom and carry out an adequate