• No se han encontrado resultados

ACTUACIÓN DEL CONTADOR PÚBLICO FRENTE A LOS REQUERIMIENTOS DE LA RESOLUCIÓN 019 DEL SAREN

N/A
N/A
Protected

Academic year: 2018

Share "ACTUACIÓN DEL CONTADOR PÚBLICO FRENTE A LOS REQUERIMIENTOS DE LA RESOLUCIÓN 019 DEL SAREN"

Copied!
65
0
0

Texto completo

Loading

Referencias

Documento similar

Edificio aislado de planta irregular y trapezoidal, dispone de semisótano, planta baja, tres plantas y tiene una torre circular coronada por una cúpula, cubierta

If certification of devices under the MDR has not been finalised before expiry of the Directive’s certificate, and where the device does not present an unacceptable risk to health

In addition to the requirements set out in Chapter VII MDR, also other MDR requirements should apply to ‘legacy devices’, provided that those requirements

The notified body that issued the AIMDD or MDD certificate may confirm in writing (after having reviewed manufacturer’s description of the (proposed) change) that the

que hasta que llegue el tiempo en que su regia planta ; | pise el hispano suelo... que hasta que el

Luis Miguel Utrera Navarrete ha presentado la relación de Bienes y Actividades siguientes para la legislatura de 2015-2019, según constan inscritos en el

(*) Conforme a lo establecido en el apartado 1.6 del Real Decreto 373/2020, de 18 de febrero de 2020, por el que se desarrolla la estructura orgánica básica del Ministerio de

2. Formarán parte de este Inventario los bienes inmuebles y los espacios vinculados a actividades de interés etnológico a los que en virtud de resolución de la Dirección General