Wiggins Road, El Paso, TX STEP ONE: STEP TWO: STEP THREE:

Texto completo

(1)

All of the materials presented here tonight will be available for review on the project website. Please visit: http://txdot.gov/project_information/projects/el_paso/spur_1966.htm

PUBLIC MEETING

Spur 1966 Project

Tuesday, May 1, 2012 | 6:00-8:00 pm University of Texas at El Paso (UTEP) El Paso Natural Gas Conference Center Wiggins Road, El Paso, TX 79968

Thank you for attending today's Public Meeting. The Texas Department of Transportation (TxDOT) welcomes you.

Today's Public Meeting is about the

Spur 1966 Project, a proposed new

connection between Schuster Avenue on the UTEP campus and Paisano Drive via a bridge over I-10. The proposed project is dedicated to improving connectivity and mobility.

The purpose of this meeting is to provide an opportunity for you to review and comment on the proposed project.

No formal presentation will be given.

STATION GUIDE

El Paso Natural Gas Conference Center STEP ONE: Learn about the project STEP TWO: See where we are today STEP THREE: What’s next for the project?

WELCOME!

• Review Handouts

• Set Your Own Pace

• Visit Each Station

• Ask Questions

• Share Your Thoughts

• Fill out a Comment Form

Written comments must be postmarked by Friday, May 11, 2012, to be included in the official Public Meeting record.

Mail to: HNTB

Attn: Spur 1966 Project Coordinator 7500 Viscount Boulevard, Suite 100 El Paso, TX 79925-5665

(2)

Todos los materiales presentados esta noche estarán disponibles en la página web del proyecto. Visite: http://txdot.gov/project_information/projects/el_paso/spur_1966.htm

REUNIÓN PÚBLICA

Proyecto Spur 1966

martes, 1o de mayo, 2012 | 6:00-8:00 pm

Universidad de Texas - El Paso (UTEP) Centro de Conferencias El Paso Gas Natural Calle Wiggins, El Paso, TX 79968

Gracias por asistir a esta Reunión Pública. El Departamento de Transporte de Texas (TxDOT, por sus siglas en inglés) les da la bienvenida.

Esta Reunión Pública trata el tema del Proyecto Spur 1966, una conexión nueva propuesta entre la Avenida Schuster en el campus de UTEP y la Calle Paisano a través de un puente sobre la carretera I-10. El proyecto propuesto mejoraría las conexiones y la movilidad.

El propósito de esta reunión es de dar al público una oportunidad para revisar y dar comentarios sobre el proyecto propuesto.

No habrá presentación formal.

GUIA DE ESTACIONES

Centro de Conferencias El Paso Natural Gas PRIMER PASO: Información sobre el proyecto SEGUNDO PASO: Vea en donde estamos hoy TERCER PASO: ¿Qué es lo que sigue?

¡BIENVENIDOS!

• Revise los Materiales • Avance a su Propio Ritmo • Visite Cada Estación • Haga Preguntas

• Comparta Sus Ideas/Opiniones • Llene un Formulario de Comentarios

Los comentarios escritos deben de tener sello postal a mas tardar el viernes, 11 de mayo de 2012, para ser incluidos en el registro oficial de esta reunión pública.

Envíe por correo a:

HNTB

Attn: Spur 1966 Project Coordinator 7500 Viscount Boulevard, Suite 100 El Paso, TX 79925-5665

(3)

MAY 2012 PUBLIC MEETING REUNIÓN PÚBLICAMAYO 2012

PROJECT INFORMATION

INFORMACIÓN SOBRE EL PROYECTO

PUBLIC MEETING Spur 1966 Project

Tuesday, May 1, 2012 6:00-8:00 pm

University of Texas at El Paso (UTEP) El Paso Natural Gas Conference Center Wiggins Road, El Paso, TX 79968

The proposed Spur 1966 project

is a new connection between

Schuster Avenue on the UTEP

campus and Paisano Drive via a

bridge over I-10.

The project

length is approximately 0.7 miles.

The proposed project would

improve connections and traffic

flow between the UTEP Campus,

surrounding medical facilities,

Sunset Heights and Kern Place

neighborhoods, and Mesa Street

with Paisano Drive. It also creates

an additional route to and from the

downtown area.

The proposed project will eliminate

the need for UTEP-bound traffic to

cut through the adjacent Sunset

Heights neighborhood to access

the UTEP facility.

Vehicular, pedestrian and bicycle

traffic will be accommodated by

the new Spur 1966 connection.

El proyecto propuesto Spur 1966

es una conexión nueva entre la

Avenida Schuster en el campus de

UTEP y la Calle Paisano a través de

un puente sobre la carretera I-10.

El proyecto tiene una longitud de

0.7 millas.

El proyecto propuesto mejoraría las

conexiones y la circulación entre el

campus de UTEP, centros médicos

cercanos, las zonas recidenciales

de Sunset Heights y Kern Place y la

Calle Mesa con la Calle Paisano. Al

mismo tiempo se creara una ruta

adicional al centro de la ciudad.

El proyecto propone eliminar el

tráfico con destino al campus de

UTEP que circula por las calles de

Sunset Heights.

La conexión nueva Spur 1966

proveera capacidad para el tráfico

vehicular, de bicicletas y peatonal.

(4)

UTEP

!

"

#

$

10 RIO GRANDE UTEP M E X I C OU S A

!

"

#

$

10

0

1

85

0

1

85 STUDY AREA STUDY AREA ---ÁREA DE ESTUDIO ÁREA DE ESTUDIO UTEP Sunset Heights KA NS AS UNIVERS ITY COFFIN PA ISA NO SAN ANTONIO SA NTA FE MISSISS IPPI SA N FRANCISCO CA NAL SCHU STER M ESA FRAN KLIN OVERLAND M ESA EL PA SO YANDEL L POR FIR IO D IAZ SCHUSTER H AW THO RN E MUND Y YANDELL BALTI MORE VIR GINI A LOS ANGE LES BALTIMORE KA NS AS FRANKLIN ST ANTO N MISSOU RI FL OR EN CE UPSON YAN DELL WYOM ING MAIN CAM PBEL L ROBIN SON RIO GRAN DE CALIF ORNIA FLOR EN CE RIVER PR OS PE CT EL PA SO UNIVE RSITY RIM M IS SO URI MAIN YAND ELL OC TA VIA HEISI G MUNDY FEW EL CAM PB ELL OC HOA KERBEY AN GE PA ISANO MONT ANA NEVADA AN TH ON Y NEVADA AL LE Y C CROSBY FEW EL OC HOA SA IN T VR AIN OR EG ON EL PA SO M ESA EL PA SO BALTI MORE BLACK ER KA NS AS MIR AMON ST AN TON NEVA DA CALIFO RNIA OR EG ON FL OR EN CE BOSTO N ARIZO NA ARIZO NA RIVER KERB EY ROBIN SON HAGU E VIR GINI A CAM PBEL L FEW EL CROSBY RIVER PAISAN O M ESA RIO GRA NDE RAM P M ESA SU N BO WL ANGE RUHLEN HAWTHORNE RAMP ST EWART RIM ROAD CORT O AL LE Y A H A W THO R NE AL LE Y B ELECTRIC TERR AC E UPSON BROW N UNIVE RSITY ELEC TR IC RAMP RAMP R AM P HAW TH OR NE RIM I-10 I-10 LAW TON BLANC HARD M ESA DU R ANG O LO S AN G EL ES ST AN TON R AN DO LPH RA ND OL PH SUN BOW L WIG G INS SUN BOW L SUN BOW L

DISCLAIMER: This map was generated by HNTB Corporation using GIS (Geographic Information Systems) software. No claims are made to the accuracy or completeness of the information shown herein nor to its suitability for a particular use. The scale and location of all mapped data are approximate.

Spur 1966 Project El Paso County, Texas

CSJ: 3628-01-001April, 2012

0 250 500

(5)

MAY 2012 PUBLIC MEETING Please include your contact information

Name: ____________________________________________ Address: __________________________________________ City, Zip: __________________________________________ Email: ____________________________________________ PUBLIC MEETING Spur 1966 Project Tuesday, May 1, 2012 6:00-8:00 pm

University of Texas at El Paso (UTEP) El Paso Natural Gas Conference Center Wiggins Road, El Paso, TX 79968

COMMENT FORM

The Texas Department of Transportation is interested in your concerns and suggestions regarding the Spur 1966 Project. Comments are welcome at any point during the study; however, comments must be postmarked by Friday, May 11, 2012 to be included in the public record for this public meeting. You may place your form in the comment box tonight or mail your comments to: HNTB, Attn: Spur 1966 Project Coordinator; 7500 Viscount Boulevard, Suite 100; El Paso, TX 79925-5665. You may also email your comments to info@Spur1966.com. Written responses to all comments received will be available fall 2012 at the TxDOT El Paso District Office and also on the following website: http://txdot.gov/project_information/projects/el_paso/spur_1966.htm. If you have any questions, please contact Mr. Jesus Heredia, P.E. at (915) 790-4200.

(6)

REUNIÓN PÚBLICAMAYO 2012 Por favor incluya sus datos de contacto:

Nombre: __________________________________________ Dirección: _________________________________________ Ciudad, Código Postal: ______________________________ Correo electrónico: __________________________________ REUNIÓN PÚBLICA

Proyecto Spur 1966

martes, 1o de mayo de 2012

De 6:00-8:00 pm

Universidad de Texas - El Paso (UTEP) Centro de Conferencias El Paso Natural Gas

Calle Wiggins, El Paso, TX 79968

FORMULARIO DE

COMENTARIOS

El Departamento de Transporte de Texas está interesado en sus preocupaciones y sugerencias con respecto al Proyecto Spur 1966. Se aceptaran comentarios en cualquier momento durante el estudio, sin embargo, los comentarios deben tener sello postal a más tardar el viernes, 11 de mayo 2012 para ser incluidos en el registro público de esta reunión pública. Puede entregar su formulario en la caja de comentarios esta noche o puede enviar sus comentarios por correo a: HNTB, Attn: Spur 1966 Project Coordinator; 7500 Viscount Boulevard, Suite 100; El Paso, TX 79925-5665. También puede mandar sus comentarios por correo electrónico a info@Spur1966.com. Las respuestas escritas a los comentarios recibidos estarán disponibles en el otoño de 2012 en la Oficina del Distrito de El Paso de TxDOT y también en la siguiente página web:

http://txdot.gov/project_information/projects/el_paso/spur_1966.htm. Para cualquier pregunta, favor de comunicarse con el Sr. Jesus Heredia, P.E. al (915) 790-4200.

Figure

Actualización...

Referencias

Actualización...

Related subjects :