All of the materials presented here tonight will be available for review on the project website. Please visit: http://www.txdot.gov/project_information/projects/el_paso/border_highway_west.htm
PUBLIC SCOPING MEETING # 2
Loop 375 Border Highway West Extension Project
Thursday, December 8, 2011 | 4:00-8:00 pm University of Texas at El Paso (UTEP) El Paso Natural Gas Conference Center
Wiggins Road, El Paso, TX 79968
Thank you for attending today's Public
Scoping Meeting. The Texas Department of
Transportation (TxDOT) welcomes you.
Today's Public Scoping Meeting is about the
Loop 375 Border Highway West Extension
Project. The proposed project is dedicated to
improving regional mobility and safety as well
as providing improved connectivity on Loop
375.
The purpose of this meeting is to provide an
opportunity for you to review & comment on the
proposed project and project documents,
including:
• Project Coordination Plan
• Need and Purpose Statement
• The proposed solutions, or “Alternatives”, to
address project needs
• The Alternatives Evaluation Process
No formal presentation will be given.
STATION GUIDE
El Paso Natural Gas Conference Center
STEP ONE: Learn about the project
STEP TWO: Review the project’s history
STEP THREE: See where we are today
STEP FOUR: What’s next for the project?
STEP FIVE: Participate in the Context Sensitive
Solutions (CSS) Process
WELCOME!
• Review Handouts
• Set Your Own Pace
• Visit Each Station
• Ask Questions
• Share Your Thoughts
• Fill out a Comment Form
Written comments must be postmarked by Monday, December 19, 2011, to be included in the official Public Scoping Meeting record.
Mail to: HNTB
Attn: Loop 375 Border Highway West Extension Project Coordinator 7500 Viscount Boulevard, Suite 100 El Paso, TX 79925-5665
REUNIÓN PÚBLICA DE SONDEO # 2
Proyecto de Extensión Loop 375 Border Highway West
jueves, 8 de diciembre de 2011 | 4:00-8:00 pm University of Texas at El Paso (UTEP) El Paso Natural Gas Conference Center
Wiggins Road, El Paso, TX 79968
Gracias por asistir a esta Reunión Pública de
Sondeo.
El Departamento de Transporte de
Texas (TxDOT, por sus siglas en inglés) les da la
bienvenida.
Esta Reunión Pública de Sondeo es acerca
del tema del Proyecto de Extensión Loop 375
Border Highway West. El proyecto propuesto
tiene el objetivo de mejorar la movilidad
regional y la seguridad asi como mejorar la
conectividad en Loop 375.
El propósito de esta reunión es de dar al
público una oportunidad para revisar y dar
comentarios sobre el proyecto propuesto y los
documentos del proyecto, incluyendo:
• El Plan de Coordinación del Proyecto
• La Declaración de Necesidad y Propósito
• Las soluciones propuestas, o “Alternativas”,
para implementar el proyecto
• El Proceso de Evaluación de Alternativas
No habrá presentación formal.
GUIA DE ESTACIONES
Centro de Conferencias El Paso Natural Gas PRIMER PASO: Información sobre el proyecto SEGUNDO PASO: Repasa la historia del proyectoTERCER PASO: Vea en donde estamos hoy
CUARTO PASO: ¿Qué es lo que sigue?
QUINTO PASO: Participe en el Proceso de
Soluciones Sensibles al Entorno (CSS, por sus siglas en inglés)
¡BIENVENIDOS!
• Revise los Materiales
• Avance a su Propio Ritmo
• Visite Cada Estación
• Haga Preguntas
• Comparta Sus Ideas/Opiniones
• Llene un Formulario
de Comentarios
Los comentarios escritos deben de tener sello postal anterior al lunes, 19 de diciembre del 2011 para ser incluidos en el registro oficial de esta reunión pública de sondeo.
Envía por correo a:
HNTB
Attn: Loop 375 Border Highway West Extension Project Coordinator 7500 Viscount Boulevard, Suite 100 El Paso, TX 79925-5665
DECEMBER 2011 PUBLIC SCOPING MEETING
Loop 375 Border Highway West Extension Project
ENVIRONMENTAL IMPACT STATEMENT (EIS) PROCESS AND SCHEDULE
PROCESO Y PROGRAMA DEL INFORME DE IMPACTO AMBIENTAL (EIS)
Preliminary Alternatives Alternativas Preliminares Preferred Alternatives Alternativas Preferidas Reasonable Alternatives Alternativas Razonables
EIS Document Preparation/Circulation
Preparación y Circulación del Documento EIS
State Record of Decision (ROD)
Récord de Decisión Estatal (ROD)
*Pending approval by the State, includes build OR no-build alternative
*Aprobación Pendiente del Estado, incluye alternativa de construcción O no construir 2007 2011 2012 2013 Universe of Alternatives
Previously Identified + Public and Team Generated
Universo de Alternativas
Previamente Identificadas + Generadas por el Público y el Equipo
1st Screening 1ª Revisión 2nd Screening 2ª Revisión 3rd Screening 3ª Revisión
Schedule subject to change
Programa sujeto a cambios Public Meeting Series #1:
Introduce Project Study Area, Need & Purpose
Public Meeting Series #2:
Universe, Preliminary, and Recommended Reasonable Alternatives; Need & Purpose and Coordination Plan
Public Hearing:
Present Recommended Preferred Alternative
Serie de Reuniones Públicas #2:
Universo de Alternativas, Alternativas Preliminares, Alternativas Razonables Recomendadas; Necesidad y Propósito y Plan de Coordinación
Serie de Reuniones Públicas #1:
Introducir el Area de Estudio del Proyecto y la Necesidad y Propósito
Audiencia Pública
Presentar Alternativa Preferida Recomendada
Public Involvement
Participación del Púb
lico
Context Sensitive Solutions Process Proceso d
e Soluciones Sensibles al E
SUNLAND PARK, NEW MEXICO Mesa St Sunland Park Dr Piedras St Dyer St Alabama St Montana Ave Montana Ave Yandell Dr Texas Ave E Paisano Dr
Van Buren Ave
Mesa St EL PASO, TEXAS Porfirio Diaz St Park St El Paso St EL PASO COUNTY FRANKLIN MOUNTAINS STATE PARK Rio Grande Rio Grande Univ. of Texas at El Paso Schuster Ave NEW MEXICO MÉXICO TEXAS MÉXICO W Paisano Dr Executive Center Blvd Racetrack Dr CIUDAD JUÁREZ, CHIHUAHUA, MÉXICO
Paso del Norte Port of Entry Yandell Bridge Bridge of the Americas Stanton St S a n ta F e S t Stanton Street Bridge Porfirio Diaz Bridge 10 10 110 85 62 478 273 10 375 375 20 20
LEGEND/LEYENDA
Study Area/ Área de Estudio River/Río Border/Frontera Estatal o Internacional Border A Segment/ Segmento de Frontera A NOT TO SCALE Border B Segment/ Segmento de Frontera B Rail Yard A Segment/ Segmento de Propiedad de Ferrocarril A Rail Yard B Segment/ Segmento de Propiedad de Ferrocarril B Segment Overlap/ Coincidencia de SegmentosBorder A
Frontera A
Border B
Frontera B
Rail Yard B
Propiedad de
Ferrocarril B
Rail Yard A
Propiedad de
Ferrocarril A
RECOMMENDED REASONABLE ALTERNATIVES – SEGMENTS
ALTERNATIVAS RAZONABLES RECOMENDADAS – SEGMENTOS
PROJECT BENEFITS
• Faster, reliable travel times• Better access to downtown, UTEP, and medical facilities • Provide alternate route to I-10 during incidents
• Improve safety on area roadways • Congestion relief for I-10
• Close downtown gap between US 85 and Loop 375
Loop 375 Border Highway West Extension Project
BENEFICIOS DEL PROYECTO
• Tiempo de desplazamiento más rápido y confiable • Mejor acceso al centro de la ciudad, a UTEP, y a los centros médicos
• Proveer una ruta alterna a la I-10 durante incidentes • Mejorar la seguridad en calles locales
• Desahogo a la congestión vehicular en la I-10 • Cerrar brecha en el centro de la ciudad entre US 85 y Loop 375
No-Build Alternative
Alternativa de No ConstruirLoop 375 Border Highway West Extension Project
DECEMBER 2011 PUBLIC SCOPING MEETING
ENVIRONMENTAL PROCESS
What is an Environmental Impact Statement
(EIS)?
• A full-disclosure, public document detailing the environmental review process through which a transportation project is developed
• Includes the consideration of a range of project alternatives
• Analyzes the potential impacts and addresses mitigation resulting from the alternatives
o A broad range of environmental issues will be studied and the findings reported, such as: water quality, air quality, cultural resources, biological resources, socioeconomic conditions, community cohesion, noise, and more.
• Assesses compliance with other applicable environmental laws and executive orders
• The EIS process is completed through the following milestones:
o Notice of Intent (NOI) o Draft EIS document (DEIS) o Final EIS document (FEIS) o Record of Decision (ROD)
• Public outreach is a crucial part of the EIS process • TxDOT has adopted a similar process to the
National Environmental Policy Act (NEPA) through the Texas Administrative Procedures Act, and will accordingly prepare a State-level EIS.
What is the Alternatives Analysis Process?
• An environmental review process that considers multiple alternatives as possible ways to complete a project
• Considers the “no build” alternative, which would be to do nothing
o The “no build” alternative provides a baseline to which we can compare the build alternatives. By doing so, the team can analyze what would occur if nothing was done to address the needs of the project area
• Alternatives are identified, analyzed, compared, and documented, with regard to the impact each would have on the natural, built, and social environment
EL PROCESO MEDIOAMBIENTAL
¿Qué es un Informe de Impacto Ambiental
(EIS, por sus siglas en inglés)?
• Es un documento público que detalla el proceso de estudio medioambiental por el cual se desarrolla un proyecto de transporte
• Considera múltiples alternativas del proyecto • Analiza los impactos potenciales y la mitigación
necesaria de cada alternativa
o Una gama amplia de asuntos
medioambientales (tales como la calidad de agua, la calidad de aire, recursos culturales, recursos biológicos,
condiciones socioeconómicas, cohesión de la comunidad, ruido y más) serán estudiados y las conclusiones serán reportadas.
• Asegura la consistencia con otras leyes medioambientales
• El proceso EIS se ejecuta de acuerdo a los siguientes acontecimientos:
o Notificación de Intención (NOI) o Documento EIS Preliminar (DEIS) o Documento EIS Final (FEIS) o Récord de Decisión (ROD)
• Consulta pública es crucial en el proceso EIS • A través de la Enmienda de Procedimientos
Administrativos de Texas, TxDOT ha adoptado un proceso similar a la Enmienda Nacional de Políticas Medioambientales (NEPA, por sus siglas en inglés) y en consecuencia preparará un EIS a nivel estatal.
¿Qué es el Proceso de Análisis de
Alternativas?
• Es un proceso de estudio medioambiental que considera alternativas múltiples de implementar un proyecto
• Considera la alternativa de “no construir”, que significaría no hacer nada
o La alternativa de “no construir” da un punto de partida para comparar las alternativas de construcción. De esta manera el equipo puede analizar lo que ocurriría si no se hiciera nada para abordar las necesidades del área del proyecto.
• Las alternativas son identificadas, analizadas, comparadas y documentadas con respecto al impacto que cada una tendría sobre el medioambiente
Please include your contact information if you would like to be added to the project mailing list:
Name: ____________________________________________ Address: __________________________________________ City, Zip: __________________________________________ Email: ____________________________________________
PUBLIC SCOPING MEETING # 2
Loop 375 Border Highway West Extension Project
Thursday, December 8, 2011 4:00-8:00 pm
University of Texas at El Paso (UTEP) El Paso Natural Gas Conference Center Wiggins Road, El Paso, TX 79968
COMMENT FORM
The Texas Department of Transportation is interested in your concerns and suggestions regarding the Loop 375 Border Highway West Extension Project. Please complete the questions below and provide any additional comments on the back. Comments are welcome at any point during the study; however, comments must be postmarked by Monday, Dec. 19, 2011 to be included in the public record for this public scoping meeting. You may deposit your form in the comment box tonight or mail your comments to: HNTB, Attn: Loop 375 Border Highway West Extension Project Coordinator; 7500 Viscount Boulevard, Suite 100; El Paso, TX 79925-5665. You may also email your comments to info@borderhighwaywest.com. Written responses to all comments received during this meeting series will be available in February 2012 at the TxDOT El Paso District Office and also on the following website: http://www.txdot.gov/project_information/projects/el_paso/border_highway_west.htm. If you have any questions, please contact Mr. Jesus Heredia, P.E. at (915) 790-4200.
1. For each of the recommended reasonable alternative segments listed below, please indicate your preference by checking a box and stating any specific comments:
Border A
: LIKE DISLIKE NEUTRAL/NO OPINIONPark Street to Yandell (closer to Border) COMMENTS:
Rail Yard A
: LIKE DISLIKE NEUTRAL/NO OPINIONPark Street to Yandell ELEVATED DEPRESSED NEUTRAL/NO OPINION
(closer to Paisano) COMMENTS:
Border B
: LIKE DISLIKE NEUTRAL/NO OPINIONYandell Area to Racetrack (closer to Border) COMMENTS:
Rail Yard B
: LIKE DISLIKE NEUTRAL/NO OPINIONYandell Area to Racetrack (closer to I-10) COMMENTS:
No-Build Alternative
: LIKE DISLIKE NEUTRAL/NO OPINIONCOMMENTS:
DECEMBER 2011 PUBLIC SCOPING MEETING
2. Do you own/lease property within the study area? No. I am interested in this project because:
Yes, I own/lease the following type of property: Residential Commercial Industrial 3. Are you aware of any areas that we should be avoid that are not shown on any of the exhibits?
(i.e. cemeteries, hazmat sites, historic structures, etc.)
4. Do you have any comments on the Need and Purpose for this project?
5. Do you have any comments on the Project Coordination Plan?
6. Use this space to provide any additional input or concerns. Be sure to identify if your comment is related to a specific alternative.
Por favor incluya su información si le gustaría ser agregado a la lista de distribución del proyecto:
Nombre: __________________________________________ Dirección: _________________________________________ Ciudad, Código Postal: ______________________________ Correo electrónico: _________________________________
REUNIÓN PÚBLICA DE SONDEO # 2
Proyecto de Extensión Loop 375 Border Highway West
jueves, 8 de diciembre de 2011 4:00-8:00 pm
Universidad de Texas en El Paso (UTEP) Centro de Conferencias El Paso Natural Gas Wiggins Road, El Paso, TX 79968
FORMULARIO DE COMENTARIOS
El Departamento de Transporte de Texas está interesado en sus inquietudes y sugerencias acerca del Proyecto de Loop 375 Border Highway West. Favor de llenar este formulario e incluya cualquier comentario adicional al dorso. Aceptaremos comentarios en cualquier momento mientras se realiza el estudio, pero los comentarios deben tener sello postal antes del lunes, 19 de diciembre 2011 para ser incluidos en el registro público de esta reunión pública de consulta. Puede depositar su formulario en la caja de comentarios esta noche o puede enviar sus comentarios por correo a: HNTB, Attn: Loop 375 Border Highway West Extension Project Coordinator; 7500 Viscount Boulevard, Suite 100; El Paso, TX 79925-5665. También puede mandar sus comentarios por correo electrónico a info@borderhighwaywest.com.
Respuestas a los comentarios recibidos durante esta serie de reuniones públicas estarán disponibles en febrero de 2012 en la oficina de TxDOT en el Distrito de El Paso y también en la siguiente página web: http://www.txdot.gov/project_information/projects/el_paso/border_highway_west.htm. Para cualquier pregunta, favor de comunicarse con el Sr. Jesus Heredia, P.E. al (915) 790-4200.
1. Para cada uno de los siguientes segmentos de alternativas razonables recomendadas mencionadas abajo, favor de indicar su preferencia al escribir sus comentarios:
Frontera A
: ME GUSTA NO ME GUSTA NEUTRAL/SIN OPINIÓNDe la Calle Park a Yandell (más cercano a la frontera) COMENTARIOS:
Propiedad de Ferrocarril A
: ME GUSTA NO ME GUSTA NEUTRAL/SIN OPINIÓNDe la Calle Park a Yandell ELEVADO ÁREA DEPRIMIDA NEUTRAL/SIN OPINIÓN
(más cercano a Paisano) COMENTARIOS:
Frontera B
: ME GUSTA NO ME GUSTA NEUTRAL/SIN OPINIÓNArea de Yandell a Racetrack (más cercana a la frontera) COMENTARIOS:
Propiedad de Ferrocarril B
: ME GUSTA NO ME GUSTA NEUTRAL/SIN OPINIÓNArea de Yandell a Racetrack (más cercano a la I-10) COMENTARIOS:
Alternativa “No Construir”
: ME GUSTA NO ME GUSTA NEUTRAL/SIN OPINIÓNREUNIÓN PÚBLICA DE SONDEO - DICIEMBRE 2011
2. Es propietario o renta alguna propiedad en el área de estudio?
No. Me interesa este proyecto porque:
Sí, soy propietario o rento propiedad: Residencial Comercial Industrial
3. ¿Sabe Ud. de alguna área que se debe de evitar que no hemos incluido en las representaciones gráficas? (i.e. cementerios, sitios de materiales peligrosos, estructuras históricas, etc.)
4. ¿Tiene algún comentario sobre la Necesidad y el Propósito de este proyecto?
5. ¿Tiene algún comentario sobre el Plan de Coordinación del Proyecto?
6. Use éste espacio para incluir cualquier comentario adicional o preocupación. Favor de indicar si su comentario se refiere a una alternativa específica.