• No se han encontrado resultados

PETC Estrategias para la implementación y operación del PETC

N/A
N/A
Protected

Academic year: 2020

Share "PETC Estrategias para la implementación y operación del PETC"

Copied!
7
0
0

Texto completo

Loading

Referencias

Documento similar

Si la inclinación supera la latitud del lugar de lanzamiento (gura 2c) hay dos posibilidades en las que será necesario determinar el Azimut, Az adecuado para insertar directamente

If certification of devices under the MDR has not been finalised before expiry of the Directive’s certificate, and where the device does not present an unacceptable risk to health

In addition to the requirements set out in Chapter VII MDR, also other MDR requirements should apply to ‘legacy devices’, provided that those requirements

The notified body that issued the AIMDD or MDD certificate may confirm in writing (after having reviewed manufacturer’s description of the (proposed) change) that the

En la contrastación de las hipótesis de investigación se usaron pruebas paramétricas y no paramétrica previo análisis de la normalidad de los datos pretest y postest,

construcción de nuevas posibilidades de desarrollo humano en la era de la globalización e internalización del conocimiento. Estudiar el impacto de una política social y educativa

Las páginas webs son lo que más suelen frecuentar, y a las redes sociales en general no suelen acceder nunca. El acceso lo motiva la búsqueda de información. Los hombres en este

Jordi Cano Ochando Centro Nacional de Microbiología. Isidoro Martínez