(1)

SITE

SARA

TOG

A W

AY

HWY 50—

104,000 ADT*

EL DO

RADO

HILLS B

LVD—27

,909 ADT*

The Shops at

El Dorado Hills

NWC El Dorado Hills Boulevard & Saratoga Way • El Dorado Hills, CA

RETAIL SHOP SPACE FOR LEASE

UNDER CONSTRUCTION

*Last traffic counts on El Dorado Hills Blvd were taken in 2019 by the

County of El Dorado. Last traffic counts on Hwy-50 were taken in 2018

by Caltrans. 2020 projections are based on a 2% annual increase.

(2)

Ariel Fox

916.473.8805

www.retailwestinc.com

Developed by:

[email protected]

DRE 01496200

NWC El Dorado Hills Blvd &

Saratoga Way

El Dorado Hills, CA

Space Available: ±1,340

SF

Demographics

Adjacent to the

Highway 50

On/Off Ramp

Adjacent to

317 residential

units

under construction

Pads are Elevated with

Tremendous Visibility

to El

Dorado Hills Blvd & Highway

50 to Both the East and

Westbound Traffic

Reciprocal

Access and

Parking

with Adjacent

Walgreens

Regional Draw

from El

Dorado Hills, Folsom,

Shingle Springs, Rescue and

Cameron Park.

Saratoga Way to connect to Iron

Point Blvd in Folsom — 4 lane

expressway is now complete

& open to the public

0.07 mi from Blue Shield

of California, which has

1,339 Employees

Over 75% White Collar

Employment in the Trade Area

Population

1 mile

5,807

2 mile

21,527

3 mile

44,923

5 mile

110,091

Median Household Income

1 mile

$121,530

2 mile

$136,975

3 mile

$143,882

5 mile

$126,218

Average Household Income

1 mile

$151,810

2 mile

$168,468

3 mile

$169,108

5 mile

$149,801

Daytime Population

1 mile

4,528

2 mile

7,860

3 mile

17,800

5 mile

30,177

Traffic Counts

Highway 50

104,000 ADT*

El Dorado Hills Blvd 27,909 ADT*

*Last traffic counts on El Dorado Hills Blvd were taken in 2019 by the

County of El Dorado. Last traffic counts on Hwy-50 were taken in 2018

by Caltrans. 2020 projections are based on a 2% annual increase.

(3)

Site Plan

PRELIMINARY SITE PLAN - DESIGN REVIEW

SARATOGA RETAIL - PHASE 2

EL DORADO HILLS, EL DORADO COUNTY

PRELIMINARY SITE PLAN

APN: 120-690-08

BLDG 2A

±5,500 SF

APN: 120-690-07

APN: 120-690-09

WALGREENS

DFH EL DORADO A CA LLC

EL DORADO HILLS BLVD

SARATOGA WAY

HWY 50 WEST BOUND

ON-RAMP

BLDG 3

±4,658 SF

ARROWHEAD

DRIVE

MAMMOUTH

WAY

CONCEPTUAL SITE PLAN

SARATOGA RETAIL - PHASE 2

EL DORADO HILLS, EL DORADO COUNTY

PRELIMINARY SITE PLAN

MARCH 5, 2019

APN: 120-690-08

BLDG 2

±5,725 SF

EL DORADO HILLS BLVD

SARATOGA WAY

HWY 50 WEST BOUND

ON-RAMP

±1,200 SF OPEN PATIO PAVEMENT LEGEND APN: 120-690-07 ±2,200 SF ±1,500 SF

BLDG 3

±4,900 SF OPEN PATIO PARCEL SUMMARY PARKING SUMMARY

BIKE PARKING SUMMARY PROJECT SUMMARY

±1,340 SF

PLANNED

DEVELOPMENT

AREA

(4)

Ariel Fox

916.473.8805

www.retailwestinc.com

Developed by:

[email protected]

DRE 01496200

Demising Plan: Building 3

AVAILABLE

(5)

Elevations

38'-0" 12'-0" 28'-0" 14'-6" 2'-6" 31'-2" 0'-0" 25'-0" 14'-6" 20'-0" 28'-0" 25'-6" 4'-0" 38'-0" 12'-0" 28'-0" 3'-0" 0'-0" 4'-0" 25'-6" 31'-2" 14'-6" 25'-0" 2'-6" 14'-6" 20'-0" 28'-0" 38'-0" 25'-6" 12'-0" 14'-6" 4'-0" 2'-6" 31'-2" 2'-6" 25'-0" 14'-6" 4'-0" 2'-6" 28'-0" 25'-6" 20'-0" 38'-0" 4'-0" 12'-0" 31'-2"

BUILDING 3 - EAST ELEVATION

BUILDING 3 - WEST ELEVATION

BUILDING 3 - NORTH ELEVATION

BUILDING 3 - SOUTH ELEVATION

A METAL FLASHING / COPING

MATERIAL MANUFACTURER

BONE WHITE STYLE / COLOR B CEMENT PLASTER WALL / CORNICE

/ WAINSCOT / DOOR AND FRAME PITTSBURGH PAINTS ENDURING ICE 413-1 UNI-CLAD

F METAL FENCE AT SITE

RETAINING WALL PITTSBURGH PAINTS SILVER LEAF 406-4 E PATIO FENCE / RAIN GUTTER /

LEADER PITTSBURGH PAINTS MATT BLACK G STOREFRONT T.B.D. MATT BLACK

J BRAKE METAL TRIM

N C CEMENT PLASTER TRIM PITTSBURGH PAINTS WHEAT SHEAF 415-3

PONY TAIL 315-4 D CEMENT PLASTER ACCENT PITTSBURGH PAINTS

M MATCH EXISTING AT WALGREENS L ROOF TILE JUNIPERO 9000 SERIES

RIOJA #95111 66.7% CAFE ANTIGUA #9543 33.3% REDLAND CLAY TILE

K

T NOT USED -U WALL MOUNTED LIGHT - TYPE A

R HEAD - PRMD H3 (BLACK) POLE - DB10 5R (BLACK) ARM - TRA9 (BLACK) LAMP POST - TYPE B

(MATCH EXISTING ON SITE) ARCHITECTURALAREA LIGHTING

S DUAL HEADS - PRMD H5 (BLACK) POLE - DB6 4R (BLACK) DOUBLE ARMS - TRA9-2 (BLACK) LAMP POST - TYPE C

(MATCH EXISTING ON SITE) ARCHITECTURALAREA LIGHTING

X -NOT W -NOT USED-Q

SINGLE HEAD - PRMD H5 (BLACK) BRACKET - WMA 11 (BLACK) ARCHITECTURAL

AREA LIGHTING DIAGONALLY SCORED CEMENT

PLASTER NOT USED -NOT USED -NOT USED-T.B.D. MATT BLACK

O DRIVE-THRU SERVICE WINDOW SYSTEM T.B.D. MATT BLACK T.B.D.

(6)

Ariel Fox

916.473.8805

www.retailwestinc.com

Developed by:

[email protected]

DRE 01496200

Retail & Development

Aerial

SARATOGA ESTATES

317 RESIDENTIAL UNITS

Folsom Lake

College

(UNDER CONSTRUCTION)

SARATOGA WAY

CONNECTOR

4 LANE EXPRESSWAY COMPLETED

& NOW OPEN

LOT A OPEN SPACE

LOT J LOT K LOT L LOT I PARK1.9 Ac. LOT A OPEN SPACE LOT B OPEN SPACE LOT E OPEN SPACE LOT D OPEN SPACE LOT M PARK 5.3 Ac. LOT H LOT G LOT F PARK/ WATER QUALITY FACILITY C COURT J STREET J STREET SARATOGA WAY H STREET WILSON WAY N COURT G STREET F STREET C STREET B COURT M STREET A STREET E STREET D STREET B STREET A STREET K STREET L STREET SITE PLAN

COUNTY OF EL DORADO STATE OF CALIFORNIA JULY, 2015 PEDESTRIAN CIRCULATION LEGEND M:\13-030-001\PLANNING\EXHIBITS\13-030-001-SE-EIR-EXHIBIT.dwg, 7/14/2015 1:56:02 PM, slathrop, 1:1

2 mi

Referencias

Documento similar