REFLEXIONES CRÍTICAS A LA LEY 39/2015, DE 1 DE OCTUBRE, DEL PROCEDIMIENTO ADMINISTRATIVO COMÚN DE LAS ADMINISTRACIONES PÚBLICAS: LA NUEVA TRAMITACIÓN SIMPLIFICADA DEL PROCEDIMIENTO
Texto completo
Documento similar
If certification of devices under the MDR has not been finalised before expiry of the Directive’s certificate, and where the device does not present an unacceptable risk to health
In addition to the requirements set out in Chapter VII MDR, also other MDR requirements should apply to ‘legacy devices’, provided that those requirements
The notified body that issued the AIMDD or MDD certificate may confirm in writing (after having reviewed manufacturer’s description of the (proposed) change) that the
En el apartado 4.6 de la Ficha Técnica y 6 del Prospecto se añade la frase “En muy raras ocasiones se han notificado reacciones de hipersensibiliad, incluyendo anafilaxia (en
Entre nosotros anda un escritor de cosas de filología, paisano de Costa, que no deja de tener ingenio y garbo; pero cuyas obras tienen de todo menos de ciencia, y aun
E Clamades andaua sienpre sobre el caua- 11o de madera, y en poco tienpo fue tan lexos, que el no sabia en donde estaña; pero el tomo muy gran esfuergo en si, y pensó yendo assi
Definir el sistema de actuación en el INSTITUTO DE ASTROFÍSICA DE CANARIAS (IAC) para la tramitación de Acuerdos de Confidencialidad
La campaña ha consistido en la revisión del etiquetado e instrucciones de uso de todos los ter- mómetros digitales comunicados, así como de la documentación técnica adicional de