• No se han encontrado resultados

Control charts for autocorrelated processes under parameter estimation

N/A
N/A
Protected

Academic year: 2020

Share "Control charts for autocorrelated processes under parameter estimation"

Copied!
87
0
0

Texto completo

Loading

Figure

Figure 1.2.1: Example of a Shewhart control chart applied to an in-control AR(1) process with φ = 0.9.
Figure 1.2.3: Example of a Shewhart control chart applied to an in-control AR(1) process with φ = 0.9
Table 1.2.1: Summary of solution approaches for the i.i.d. case under parameter estimation.
Figure 1.2.5: Number of publications about control charts for autocorrelated data under estimated param- param-eters.
+7

Referencias

Documento similar

Abstract: Transepidermal water-loss (TEWL), stratum-corneum hydration (SCH), erythema, elas- ticity, pH and melanin, are parameters of the epidermal barrier function and

Government policy varies between nations and this guidance sets out the need for balanced decision-making about ways of working, and the ongoing safety considerations

No obstante, como esta enfermedad afecta a cada persona de manera diferente, no todas las opciones de cuidado y tratamiento pueden ser apropiadas para cada individuo.. La forma

The program is based on the following pillars: (a) students become the main agents of their learning by constructing their own knowledge; (b) the teacher must be the guide to

Regardless of the negatives values estimated for r 25 , under limited condition the flux is twice the flux obtained under non limited, suggesting that the NH 3 limitation is causing

In summary, p-QMs have been successfully used for the first time in asymmetric catalysis in two different processes: the 1,6- addition of phenyl malonate under phase

Finally, experiments with solar [17–34], atmospheric [35–45], reactor [46–50], and long-baseline accelerator [51–59] neutrinos indicate that neutrino flavor change through

In  order  to  have  a  better  control  of  the  variables  under