• No se han encontrado resultados

B C B C A A

N/A
N/A
Protected

Academic year: 2024

Share "B C B C A A"

Copied!
6
0
0

Texto completo

(1)

DESPENSA

ATENCION

COMERCIO 07

ATENCION

DESPENSA

F R A N J A D E C I R C U L A C I O N

NPT. + 8.00

48

49

50

51 52

53

54 55

56

57

58

58

57

56

55 54 53

50 49

48

52

7.25 7.20 7.20

7.25 7.55

7.35

59.64

7.30

7.50

51

0.10

6.90

0.30

7.10 0.40

7.45 0.30 0.30 6.85 0.45 6.80 6.85

0.40 7.25

0.30 7.00

0.40

0.30 0.30 19.80

0.15 1.30

0.40

4.60

0.40 2.00

0.15 2.00

0.30 2.20

0.30 2.20

0.30 2.00

3.00

5.00

4.50

2.50

2.50

A

B

C

D

E

F

3.00

4.95

4.55

2.50

2.50

A

19.80 0.30

1.15

0.40

4.55

0.40

2.00

0.15

2.00

2.20

0.30

2.40

0.10

2.00

B

C

D

E

F

1.42

1.35 0.40

2.45

0.40

1.45

1.05

0.40 1.05

3.30

0.15

3.50

0.40

3.25

0.15 0.40

3.30

0.30

0.15

1.00

1.45

0.40 1.10

2.20

1.20

0.15

31.55 3.70

4.10

3.70

0.45

3.65

3.60

0.45

3.50

4.05

3.70

1.70 0.30

2.50

0.50 2.15

2.35

0.50

4.00

0.50

0.15

Piso: De Porcelanato 0.60x0.60 Cm. Antideslizante

P A T I O D E C O M I D A S

NPT. + 8.00

Piso: De Porcelanato 0.60x0.60 Cm. Antideslizante

P A T I O D E C O M I D A S

NPT. + 8.00

Piso: De Porcelanato 0.60x0.60 Cm. Antideslizante

C O M E R C I O 0 7

NPT. + 8.00

Piso: De Cerámico 0.30x0.30 Cm. Antideslizante

B

C B

C

A

A

ESTRUCTURA METÁLICA COBERTURA POLICARBONATO

ESTRUCTURA METÁLICA COBERTURA POLICARBONATO

ESTRUCTURA METÁLICA COBERTURA POLICARBONATO P-3

P-3 V-7

V-8 V-7

V-8

PROYECCION DE VIGA

PROYECCION DE VIGA

PROYECCION DE VIGA

PROYECCION DE VIGA PROYECCION DE VIGA

PROYECCION DE VIGA

PROYECCION DE VIGA PROYECCION DE VIGA

PROYECCION DE VIGA

PROYECCION DE VIGA PROYECCION DE VIGA

PROYECCION DE VIGA

PROYECCION DE VIGA

PROYECCION DE VIGA PROYECCION DE VIGA PROYECCION DE VIGA PROYECCION DE VIGA

PROYECCION DE VIGA

PROYECCION DE VIGA

PROYECCION DE VIGA PROYECCION DE VIGA

PROYECCION DE VIGA

MURO CORTINA VER DETALLE MURO CORTINA VER DETALLE

SISTEMA BARANDA, ACERO INOX

P A T I O D E C O M I D A S

NPT. + 8.00

Piso: De Porcelanato 0.60x0.60 Cm. Antideslizante

NPT. + 8.00

Piso: De Cerámico 0.30x0.30 Cm. Antideslizante

SISTEMA BARANDA, ACERO INOX

SISTEMA BARANDA, ACERO INOX

SISTEMA BARANDA, ACERO INOX

JUNTA SISMICA 0.05 M.

JUNTA SISMICA 0.05 M.

CUADRO DE VANOS

P-1

P-3 P-2 TIPO

---

--- ---

3.00 0.70

2.00

ALFEIZER

ANCHO ALTO OBSERVACIONES

PUERTAS

V-2

V-6 V-7

6.18 CUADRO DE VANOS TIPO

V-1

ALFEIZER ALTO

ANCHO 3.09

OBSERVACIONES VENTANAS

Sistema Moduglas,Vidrio de 6mm.

Sistema Moduglas,Vidrio de 6mm.

Sistema Moduglas,Vidrio de 6mm.

Sistema Moduglas,Vidrio de 6mm.

V-3 3.05 Sistema Moduglas,Vidrio de 6mm.

V-4 5.82 Sistema Moduglas,Vidrio de 6mm.

V-5 3.00 Sistema Moduglas,Vidrio de 6mm.

V-8 Sistema Moduglas,Vidrio de 6mm.

2.00 Puerta de melamine para módulo boletería

1.50 0.50

1.50 0.50

1.50 0.50

0.50 1.50

0.50 1.50

Puerta de sistema spider - muro cortina

2.75 1.20 0.90

1.00 2.50 Puerta de tablero rebajado

2.45 1.50

1.45 1.50

0.90 0.90 MUROS INTERIORES LATEX MUROS EXTERIORES LATEX SATINADA CIELOS RASOS (CEMENTO) LATEX TIPO 1 PORCELANATO

LATEX TIPO 1

VIGAS Y COLUMNAS LATEX TIPO 1

BRUÑAS ENTRE LIMITE DE PARED,COLUMNA,VIGA REVOQUE Y ENLUCIDO CON SELLADORA BRUÑAS ENTRE LIMITE DE PARED,COLUMNA,VIGA REVOQUE Y ENLUCIDO CON PASTA MURAL

PINTURAS MUROS VESTIDURA DE

CONTRAZOCALO PISOS

INTERIOR

EXTERIOR ACABADOS

h=0.10 (INTERIOR)

Y EXTERIORES

CUADRO DE ACABADOS SEGUNDO NIVEL

AMBIENTES

AMBIENTES

MADERA h=0.10 (INTERIOR)

PORCELANATO ANTIDESLIZANTE 0.60 X 0.60

FRANJA DE CIRCULACIÓN

CERAMICO 20 X 30CM ZOCALOS

CERÁMICO ANTIDESLIZANTE 0.30 X 0.30

CERAMICO h=0.10 (INTERIOR)

VIDRIOS SISTEMA MODUGLASS 8 MM

CEMENTO PULIDO h=0.10 (INTERIOR)

PIEDRA LAVADA CEMENTO PULIDO

ENCHAPADO EN PIEDRA AZUL

PARAPETOS X PISO

PATIO DE COMIDAS COMERCIO 07 MIRADOR

CARPINTERIA METALICA MUROS EXTERIORES ESMALTE

0.15 1.35

3.30 3.10 3.30

1.00

0.30

0.85

3.30

3.30

3.30

1.00 1.70

0.30 2.62

0.40

4.58

0.40

4.18

0.30

4.70

0.30 2.00

4.58

0.50

3.88

0.50

1.70 0.30

2.61

0.40

4.59

0.40

4.18

0.30

4.70

0.30 2.00 4.50

0.50 4.50

0.50 2.00

0.30 2.51 0.50 4.49 0.50 3.98 0.50 4.50 0.50

1.70 0.30

2.60

0.40

4.60

0.40

4.20

0.30

4.70

0.30 2.00

4.57

0.50

3.88

0.50

4.50

0.50

2.00 43.80

6.00 8.70 5.70

2.00 2.00

ENCONMIENDAS OFICINA DEP OFICINA

DEP

T

I

E N D

A 1 0

T

I

E N D

A 2 0

T

I

E N D

A 3 0

T

I

E N D

A 4 0

T

I

E N D

A 5 0

T

I

E N D A

0

6

T

I

E N D

A 7 0

C A S E T A D

E 0 O I B M A C

1

PUERTA INGRESO PUERTA SALIDA

PERGOLA

INGRESO PRINCIPAL

CONTROL DE EMBARQUE CONTROL DE EMBARQUE

CONTROL DE EMBARQUE

CONTROL DE EMBARQUE PERGOLA

GARITA DE CONTROL

PATIO DE MANIOBRAS

GARITA DE CONTROL

INFORMES

OFICINA SUTRAN

TELEFONO

RAMPA DE SALIDA DE ANDEN DESEMBARQUE Pendiente de 10%

S.H

C A S E T A D

E 0 O I B M A C

2

C A S E T A D

E 0 O I B M A C

3

C A S E T A D E

C A M B

I

O

0

4

C A S E T A D

E 0 O I B M A C

5

C A S E T A D E

C A M B

I

O

0

6

C A S E T A D

E 0 O I B M A C

7

PATIO DE RETEN

01 0203

SALIDA BUSES INGRESO BUSES

RAMPA A ESTACIONAMIENTO RAMPA A MIRADOR

RAMPA A ESTACIONAMIENTO RAMPA A MIRADOR

010203 010203

010203 01 0203

NPT. +- 0.00 CAMINERIA

NPT. + 0.50 CAMINERIA

NPT. + 1.00 CAMINERIA NPT. + 1.00 CAMINERIA

NPT. + 1.50 CAMINERIA

NPT. + 1.50 CAMINERIA

NPT. + 2.00 CAMINERIA

NPT. + 2.00 CAMINERIA

NPT. + 2.50 CAMINERIA

NPT. + 10.00 NPT. + 2.50

JARDIN NPT. + 1.50 JARDIN

NPT. + 0.50

RECEPCIÓNNPT. + 1.50 PROYECCIÓN DUCTO DE VENTILACION

LOBBY NPT. + 1.50 TURISMO NPT. + 1.50

PASILLO NPT. + 1.50 PASILLO NPT. + 1.00 PASILLO NPT. + 1.00

PASILLO NPT. + 2.00

PASILLO NPT. + 2.00

GUARDERIA

ADMINISTRACIÓNNPT. + 1.50

HABITACION 200 S.H S.H S.H S.H S.H S.H S.H S.H S.H S.H

S.H

S.H

S.H S.H

S.H S.H S.H

S.H S.H

S.HS.H

S.H S.H

S.H S.H

S.H S.H

S.H

S.H S.H S.H

HABITACION 201 HABITACION 202 HABITACION 203 HABITACION 204 HABITACION 205 HABITACION 206 HABITACION 207 HABITACION 208 HABITACION 209

HABITACION 211 HABITACION 212

HABITACION 213 HABITACION 214HABITACION 215HABITACION 216HABITACION 217HABITACION 218

HABITACION 219 CUARTO DE SERV.

HABITACION 300 HABITACION 301

HABITACION 302 HABITACION 303

HABITACION 304 HABITACION 305

HABITACION 306 HABITACION 307

HABITACION 308HABITACION 309 HABITACION 310 HABITACION 311 HABITACION 312 HABITACION 313 HABITACION 314

HABITACION 315 HABITACION 316

HABITACION 317

HABITACION 318

HABITACION 319

COMEDOR ATENCIÓN

COCINA DESPENSA DEP.

S.H D S.H V

S.H S.H S.H S.H S.H

S.H S.H

S.H

S.H

NPT. + 2.00 CAMINERIA

NPT. + 2.50 CAMINERIA

NPT. + 2.50 CAMINERIA

NPT. + 2.50 CAMINERIA

NPT. + 2.50 CAMINERIA

CL

CL

CL CL

CL

CL CL CL CL CL

CL CL

CL CL

CL CL

CL

CL CL CL

CL CL

CL CL

CL CL

CL

CL CL CL

CL

CL

CL CL CL CL CL CL CL CL

010203

NPT. + 3.00 CAMINERIA ESCENARIO

NPT. + 2.00

S.HDEPÓSITO

NPT. + 2.00 CAMERINO

010203 01

NPT. + 2.00 BACK STAGE

FOLLER NPT. + 2.50 DEPÓSITO

NPT. + 2.00 CAMERINO 0203 S.H

NPT. + 2.50 S.H V.

S.H D.

NPT. + 2.50 CAMINERIA

010203040506

010203040506

010203040506

010203040506

COMEDOR NPT. + 2.50

ATENCIÓN NPT. + 2.50

NPT. + 3.00 CAMINERIA

030201 NPT. + 3.00 CAMINERIA

NPT. + 3.00 CAMINERIA NPT. + 3.00

CAMINERIA

NPT. + 3.00 SALA DE ESPERA

S.H V.

S.H D.

0102 03040506 0708091011121314

NPT. + 3.00 ÁREA ADMINISTRATIVA

SALA DE REUNIONES SECRETARIA

ADMINISTRACIÓN INFORMES Y ATENCION ALUSUARIO

COCINA S.H

HALL

NPT. + 3.50 CAMINERIA

NPT. + 3.50 CAMINERIA VENTATIKET VENTA TIKET VENTA TIKET ESTAR TERRAMOZA AGENCIA DE TURISMO

F R A N J A D E C

I

R C U L A C

I

O

N NPT. + 3.50

F R A N J A D E C

I

R C U L A C

I

O N

NPT. + 3.50 COUNTER 14

OFICINA

S.H

F R A N J A D E C

I

R C U L A C

I

O

N NPT. + 3.50

F R A N J A D E C

I

R C U L A C

I

O

N NPT. + 3.50

DEP

OFICINA COUNTER 13

DEPDEP

OFICINA OFICINA COUNTER 15

COUNTER 16

ATENCION AL CLIENTE OFICINA TOPICO

ESTAR CHOFERESNPT. + 3.50 S.H

HABITACIÓN

DEP OFICINA

DEP

DEP

DEP OFICINA OFICINA

OFICINA COUNTER 17

COUNTER 18 COUNTER 19 COUNTER 20

NPT. + 3.50 NPT. + 3.50 NPT. + 3.50 NPT. + 3.50

CONTROL

S.HMUJERES S.HVARONES

S.HDISC.

NPT. + 3.50 ANDEN DE ASCENSO Y DESCENSO

ANDEN DE ASCENSO Y DESCENSO NPT. + 3.50 ANDEN DE ASCENSO Y DESCENSO

NPT. + 4.00

CONTROLNPT. + 3.50 S.HDISC.

S.HVARONES S.H MUJERES 01020304 0506

07080910

01020304 0506

07080910

NPT. + 3.50 NPT. + 3.00

CAMINERIA NPT. + 3.00 CAMINERIA

NPT. + 7.00 DESCANSO

COUNTER 06 OFICINA DEP.

COUNTER 05 OFICINA

DEP.

OFICINA DEP.

COUNTER 04 OFICINA

DEP.

OFICINA DEP.

COUNTER 03 COUNTER 01

OFICINADEP.

OFICINADEP.

OFICINADEP.

OFICINA DEP.

OFICINA DEP.

OFICINA

DEP.

COUNTER 07

COUNTER 08

COUNTER 09

COUNTER 10

COUNTER 11 COUNTER 12

ESTACIONAMIENTO PUBLICONPT. + 15.50

NPT. + 10.00 ANDEN DE ASCENSO Y DESCENSONPT. + 3.50

NPT. + 15.50 ESTACIONAMIENTO

PUBLICONPT. + 10.00

NPT. + 8.00 NPT. + 6.50

NPT. + 6.50 NPT. + 8.00

NPT. + 6.50

NPT. + 2.50 CAMINERIA 010203

010203

NPT. + 1.50 NPT. + 1.00

NPT. + 1.00 NPT. + 1.00

NPT. + 1.00

NPT. + 1.00

NPT. + 1.00 NPT. + 1.00NPT. + 1.00NPT. + 1.50

NPT. + 1.50 NPT. + 1.50

NPT. + 1.50

NPT. + 2.00

NPT. + 2.00

NPT. + 2.00

NPT. + 2.50 NPT. + 2.50

NPT. + 2.50 NPT. + 2.00

CAMINERIA

NPT. + 1.50 CAMINERIA

NPT. + 2.00 CAMINERIA

NPT. + 1.50 NPT. + 1.50

030201

NPT. + 2.50 CAMINERIA

NPT. + 3.00 CAMINERIA

NPT. + 3.50

NPT. + 3.50 NPT. + 3.50 NPT. + 3.50 NPT. + 3.50 NPT. + 3.50

NPT. + 3.50 NPT. + 3.50NPT. + 3.50

NPT. + 3.50 NPT. + 3.50

NPT. + 3.50 NPT. + 3.50 CAMINERIA

NPT. + 3.50 NPT. + 3.50

NPT. + 3.00 NPT. + 3.00 NPT. + 3.00

NPT. + 3.00

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00

030201 030201

030201 PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

BARRA NPT. + 2.50

R. AGUEROCa. JOSE DE LA

PIMENTELCa. RICARDO

Av. H A I T I

Ca. YAPEYU

Ca. LUIS SANCHEZ CERRO Ca. LUIS SANCHEZ CERRO

Ca. LOS LIBERTADORES Ca. LOS PROCERES Ca. JOSE L

ESPINOZA

MENDOZA Ca. JACINTO

Ca. VELIZARDO BARRIGA

BUSTIOSCa. FEDERICO

ALCAZAR Ca. SAMUEL

Av. H A I T I

PISO DE

PISO DE PIEDRA LAVADA BASURERO BARANDA SARDINEL

PISO DEPIEDRA LAVADA PISO DEPIEDRA LAVADA

POSTE EXISTENTE

RAMPA

COUNTER 02

TALLER ZONA DEMANTENIMIENTO YLAVADO

CTO. DE HERRAMIENTAS CTO. DE BOMBAS FILTRO PRINCIPALTRAMPA DE GRASA

GARITA DE CONTROL

GARITA DE CONTROL GARITA DE

CONTROL

Pendiente de 8%

NPT. + 9.50

PENDIENTE DE 6%

EVACUACIÓN DE AGUA DE LLUVIA

PENDIENTE DE 10%

EVACUACIÓN DE AGUA DE LLUVIA

0101

NPT. + 10.00 RAMPA DE ACCESO

RAMPA DE ACCESO

Pendiente de 15%

Pendiente de 15%

ÁREA ESTACIONAMIENTO TAXIS CASETA DE

CONTROL NPT. + 9.00 NPT. + 8.00 NPT. + 6.00 NPT. + 5.00 NPT. + 4.00

010203040506

070809101112

131415161718192021232422

252627282930

313233353634373839404142

AV. EMANCIPACION AV. GREGORIO ALBARRACIN

Ca. TORRES TAGLE

AV. GREGORIO ALBARRACIN

S.H S.H

NPT. + 10.00 ATRIO DE INGRESO

01 02

03 04 05 06 07 08 09 10 11 12 13

01 02

03 04

05 06

07

08 09

10

11

12 13 14 15 16 17 18 19

01 02 03 04 05 06 07

08 09

10

11 12 13

14

15

16

17

18

19

20

21

22

23

24 NPT. + 15.50

NPT. + 15.50

NPT. + 15.50 NPT. + 15.50

01 02 03 04 05

06 07

08 09

10 11

12 13

14 15 16

17 18

19 20

21

22

23

24

25

26

27

28

29

30 31

32 33

34 35

36 37 38

39

40

41

42

43

44

NPT. + 15.50 NPT. + 15.00

NPT. + 14.00 NPT. + 10.50

NPT. + 9.00 NPT. + 7.00

NPT. + 6.00

PENDIENTE DE 2%

EVACUACIÓN DE AGUA DE LLUVIA

NPT. + 9.50 NPT. + 8.50 NPT. + 8.00 NPT. + 7.50

NPT. + 6.50 NPT. + 11.00 NPT. + 11.50 NPT. + 12.00 NPT. + 12.50 NPT. + 13.00 NPT. + 13.50 NPT. + 14.50

NPT. + 4.50

NPT. + 5.00

NPT. + 4.50

NPT. + 4.00

NPT. + 3.50

NPT. + 3.00

NPT. + 2.50

NPT. + 0.00

NPT. + 0.50

NPT. + 1.00 NPT. + 1.50

NPT. + 2.00

NPT. + 3.00

NPT. + 3.00

NPT. + 5.50 NPT. + 5.00 NPT. + 4.50 NPT. + 4.00 NPT. + 3.50 NPT. + 3.00 NPT. + 2.50 NPT. + 2.00 NPT. + 1.50 NPT. + 1.00

NPT. + 5.50 NPT. + 6.00

NPT. + 6.50

NPT. + 7.00

NPT. + 11.00

NPT. + 15.50 PENDIENTE DE 1%

EVACUACIÓN DE AGUA DE LLUVIA

PENDIENTE DE 6%

EVACUACIÓN DE AGUA DE LLUVIA

PENDIENTE DE 15%

EVACUACIÓN DE AGUA DE LLUVIA

NPT. + 3.50

NPT. + 3.50 NPT. + 3.50

NPT. + 3.50 NPT. + 3.50 010203

0102 03

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00 NPT. + 2.00 NPT. + 2.00 NPT. + 2.00 NPT. + 2.00

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00

NPT. + 2.00

NPT. + 2.00

01

NPT. + 1.00 CAMINERIA

02 03 NPT. + 2.00

PROYECCIÓN DUCTO DE VENTILACION

S.H 01 02 03

NPT. + 1.00 NPT. + 1.00

NPT. + 1.00 NPT. + 1.00

NPT. + 1.00

NPT. + 1.00 NPT. + 1.50

NPT. + 1.50 NPT. + 1.00 01 02 03 01 02 03

010203

010203

010203

010203

NPT. + 2.50 NPT. + 2.50

010203

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00

NPT. + 3.50

1.40

030201

NPT. + 2.00 AREA DE TENDALNPT. + 1.00

LAVANDERIANPT. + 1.00 CUARTO DE NPT. + 1.00 PLANCHADO

DEPOSITONPT. + 1.00

PROYECCIÓN DUCTO DE VENTILACION S.H

NPT. + 3.00

2 d o n i v e l p a t i o d e c o m i d a s

E S C A L A : 1 / 7 5

P L A N I M T E R I A G N E R L E A L

O C A L I Z A C I O N D E L B L O Q U E S E Ñ L A A D O

PROYECTO:

TESISTA:

ESCALA: FECHA:

PLANO:

ASESOR:

1/75 SETIEMBRE 2020

ARQ. ARMANDO DAVID RAMOS RAMOS

VIII TALLER TUTORIAL DE TESIS

UNIVERSIDAD PRIVADA DE TACNA

FACULTAD DE ARQUITECTURA Y URBANISMO

"PROYECTO ARQUITECTÓNICO DE UN TERMINAL TERRESTRE AL ALTIPLANO PARA EL ORDENAMIENTO DEL TRANSPORTE INTERPROVINCIAL DE LA REGIÓN TACNA, 2020"

No DE LAMINA:

PROYECTO - PATIO DE COMIDAS

AR-15

BACH. ARQ.

CRISTIAN ABEL SALVADOR SANCHEZ

N

M

(2)

58

57

56 55 54 53 52

51 50

49 48 5.30

5.60

5.30

0.35

5.25

5.25

5.30

5.60

5.30

B

C B

C

A

A

m i r a d o r

NPT. + 11.50

Piso: De Porcelanato 0.60x0.60 Cm. Antideslizante

m i r a d o r

NPT. + 11.50

Piso: De Porcelanato 0.60x0.60 Cm. Antideslizante

m i r a d o r

NPT. + 11.50

Piso: De Porcelanato 0.60x0.60 Cm. Antideslizante

58

57

56

55 54 53

50 49

48

52

7.30 7.20 7.20

7.20 7.50

7.40

59.70

7.30

7.50

51

0.10

6.90

7.15 0.40

7.45 0.30 0.30 6.85 0.45 6.80 6.90

7.20 0.30

7.00 0.40

0.30 TIJERAL - VIGA METÁLICA 0.30

TIJERAL - VIGA METÁLICA TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

0.40

5.00

0.30

5.20

0.30

5.00

0.30

4.90

0.30

4.90

0.30 0.30

4.95

0.30

5.30

0.30

5.00 14.00

4.20

2.20

2.20 0.30

2.00

4.50

2.50

2.50

D

2.10 0.40

SISTEMA BARANDA, ACERO INOX SISTEMA BARANDA,

ACERO INOX

SISTEMA BARANDA, ACERO INOX

C

E

F

4.50

2.50

2.50 14.00

2.10

0.40

4.20

2.20

2.00

2.00

C

D

E

F

TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

0.45

SISTEMA BARANDA, BALCON DE VIDRIO SISTEMA BARANDA,

BALCON DE VIDRIO

SISTEMA BARANDA, BALCON DE VIDRIO

0.30

JUNTA SISMICA 0.05 M.

JUNTA SISMICA 0.05 M.

CUADRO DE VANOS

P-1

P-3 P-2 TIPO

---

--- ---

3.00 0.70

2.00

ALFEIZER ALTO

ANCHO OBSERVACIONES

PUERTAS

V-2

V-6 V-7

6.18 CUADRO DE VANOS TIPO

V-1

ALFEIZER ALTO

ANCHO 3.09

OBSERVACIONES VENTANAS

Sistema Moduglas,Vidrio de 6mm.

Sistema Moduglas,Vidrio de 6mm.

Sistema Moduglas,Vidrio de 6mm.

Sistema Moduglas,Vidrio de 6mm.

V-3 3.05 Sistema Moduglas,Vidrio de 6mm.

V-4 5.82 Sistema Moduglas,Vidrio de 6mm.

V-5 3.00 Sistema Moduglas,Vidrio de 6mm.

V-8 Sistema Moduglas,Vidrio de 6mm.

2.00 Puerta de melamine para módulo boletería

1.50 0.50

1.50 0.50

1.50 0.50

0.50 1.50

0.50 1.50

Puerta de sistema spider - muro cortina

2.75 1.20 0.90

1.00 2.50 Puerta de tablero rebajado

2.45 1.50

1.45 1.50

0.90 0.90 COLUMNAS ESMALTE SINTÉTICO

ESTRUCTURAS METÁLICAS - VIGAS ESMALTE ANTICO CIELOS RASOS (CEMENTO) LATEX TIPO 1

PORCELANATO

LATEX TIPO 1

VIGAS Y COLUMNAS LATEX TIPO 1

BRUÑAS ENTRE LIMITE DE PARED,COLUMNA,VIGA REVOQUE Y ENLUCIDO CON SELLADORA BRUÑAS ENTRE LIMITE DE PARED,COLUMNA,VIGA REVOQUE Y ENLUCIDO CON PASTA MURAL

PINTURAS MUROS VESTIDURA DE

CONTRAZOCALO PISOS

INTERIOR

EXTERIOR ACABADOS

h=0.10 (INTERIOR)

Y EXTERIORES

CUADRO DE ACABADOS TERCER NIVEL

AMBIENTES

MADERA h=0.10 (INTERIOR)

PORCELANATO ANTIDESLIZANTE 0.60 X 0.60

FRANJA DE CIRCULACIÓN

CERAMICO 20 X 30CM ZOCALOS

CERÁMICO ANTIDESLIZANTE 0.30 X 0.30

CERAMICO h=0.10 (INTERIOR)

VIDRIOS SISTEMA MODUGLASS 8 MM

CEMENTO PULIDO h=0.10 (INTERIOR)

PIEDRA LAVADA CEMENTO PULIDO

ENCHAPADO EN PIEDRA AZUL

PARAPETOS X PISO

CARPINTERIA METALICA MUROS EXTERIORES ESMALTE

TIJERAL - VIGA METÁLICA TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA

TIJERAL - VIGA METÁLICA 0.30

0.30

0.40

0.30

0.30

0.50 40.90

0.50

3.90

0.50

4.40

0.50

2.00 0.30 4.60

0.30 4.20

0.40

0.50 3.90 0.50 4.50 0.50

0.30

4.70

0.30

4.20

0.40 0.50

3.90

0.50

4.60

0.50 0.30

4.80

0.30

4.20

0.40 0.50

3.90

0.50

4.50

0.50 2.00

2.00

2.00

2.00

2.00

2.00

19.00 12.00 19.00

ENCONMIENDAS OFICINA DEP OFICINA

DEP

T

I

E N D

A 1 0

T

I

E N D

A 2 0

T

I

E N D

A 3 0

T

I

E N D

A 4 0

T

I

E N D

A 5 0

T

I

E N D

A 6 0

T

I

E N D

A 7 0

C A S E T A D

E 0 O I B M A C

1

PUERTA INGRESO PUERTA SALIDA

PERGOLA

INGRESO PRINCIPAL

CONTROL DE EMBARQUE CONTROL DE EMBARQUE

CONTROL DE EMBARQUE

CONTROL DE EMBARQUE PERGOLA

GARITA DE CONTROL

PATIO DE MANIOBRAS

GARITA DE CONTROL

INFORMES

OFICINA SUTRAN

TELEFONO

RAMPA DE SALIDA DE ANDEN DESEMBARQUE Pendiente de 10%

S.H

C A S E T A D E

C A M B

I

O

0

2

C A S E T A D

E 0 O I B M A C

3

C A S E T A D

E 0 O I B M A C

4

C A S E T A D

E 0 O I B M A C

5

C A S E T A D E

C A M B

I

O

0

6

C A S E T A D

E 0 O I B M A C

7

PATIO DE RETEN

01 0203

SALIDA BUSES INGRESO BUSES

RAMPA A ESTACIONAMIENTO RAMPA A MIRADOR

RAMPA A ESTACIONAMIENTO RAMPA A MIRADOR 0102 03

010203

010203 0102 03

NPT. +- 0.00 CAMINERIA

NPT. + 0.50 CAMINERIA

NPT. + 1.00 CAMINERIA NPT. + 1.00 CAMINERIA

NPT. + 1.50 CAMINERIA

NPT. + 1.50 CAMINERIA

NPT. + 2.00 CAMINERIA

NPT. + 2.00 CAMINERIA

NPT. + 2.50 CAMINERIA

NPT. + 10.00 NPT. + 2.50

JARDINNPT. + 1.50 JARDIN

NPT. + 0.50

RECEPCIÓNNPT. + 1.50 PROYECCIÓN DUCTO DE VENTILACION

LOBBY NPT. + 1.50 TURISMONPT. + 1.50

PASILLO NPT. + 1.50 PASILLO NPT. + 1.00 PASILLO NPT. + 1.00

PASILLO NPT. + 2.00

PASILLO NPT. + 2.00

GUARDERIA

ADMINISTRACIÓNNPT. + 1.50

HABITACION 200 S.H S.H S.H S.H S.H S.H S.H S.H S.H S.H

S.H

S.H S.H

S.H

S.H S.H S.H

S.H S.H

S.HS.H

S.H S.H

S.H S.H

S.H S.H

S.H

S.H S.H S.H

HABITACION 201 HABITACION 202 HABITACION 203 HABITACION 204 HABITACION 205 HABITACION 206 HABITACION 207 HABITACION 208 HABITACION 209

HABITACION 211

HABITACION 212 HABITACION 213

HABITACION 214 HABITACION 215HABITACION 216HABITACION 217HABITACION 218

HABITACION 219 CUARTO DE SERV.

HABITACION 300 HABITACION 301

HABITACION 302 HABITACION 303

HABITACION 304 HABITACION 305

HABITACION 306HABITACION 307 HABITACION 308HABITACION 309

HABITACION 310 HABITACION 311 HABITACION 312 HABITACION 313 HABITACION 314

HABITACION 315 HABITACION 316

HABITACION 317

HABITACION 318

HABITACION 319

COMEDOR ATENCIÓN

COCINA DESPENSA DEP.

S.H D S.H V

S.H S.H S.H S.H S.H

S.H S.H

S.H

S.H

NPT. + 2.00 CAMINERIA

NPT. + 2.50 CAMINERIA

NPT. + 2.50 CAMINERIA

NPT. + 2.50 CAMINERIA

NPT. + 2.50 CAMINERIA

CL

CL

CL CL

CL

CL CL CL CL CL

CL CL

CL CL

CL CL

CL

CL CL CL

CL CL

CL CL

CL CL

CL

CL CL CL

CL

CL

CL CL CL CL CL CL CL CL

010203

NPT. + 3.00 CAMINERIA ESCENARIONPT. + 2.00

S.HDEPÓSITO

NPT. + 2.00 CAMERINO

010203 01

NPT. + 2.00 BACK STAGE

FOLLER NPT. + 2.50 DEPÓSITO

NPT. + 2.00 CAMERINO 0203 S.H

NPT. + 2.50 S.H V.

S.H D.

NPT. + 2.50 CAMINERIA

010203040506

010203040506

010203040506

010203040506

COMEDORNPT. + 2.50

ATENCIÓNNPT. + 2.50 NPT. + 3.00 CAMINERIA

030201 NPT. + 3.00 CAMINERIA

NPT. + 3.00 CAMINERIA NPT. + 3.00

CAMINERIA

NPT. + 3.00 SALA DE ESPERA

S.H V.

S.H D.

0102 0304 0506 07080910111213 14

NPT. + 3.00 ÁREA ADMINISTRATIVA

SALA DE REUNIONES SECRETARIA

ADMINISTRACIÓN INFORMES Y ATENCION ALUSUARIO

COCINA S.H

HALL

NPT. + 3.50 CAMINERIA

NPT. + 3.50 CAMINERIA VENTA TIKET VENTA TIKET VENTA TIKET ESTAR TERRAMOZA AGENCIA DE TURISMO

F R A N J A D E C

I

R C U L A C

I

O

N NPT. + 3.50

F R A N J A D E C

I

R C U L A C

I

O

N NPT. + 3.50

COUNTER 14 OFICINA

S.H

F R A N J A D E C

I

R C U L A C

I

O

N NPT. + 3.50

F R A N J A D E C

I

R C U L A C

I

O

N NPT. + 3.50

DEP

OFICINA COUNTER 13

DEP DEP

OFICINA OFICINA COUNTER 15

COUNTER 16

ATENCION AL CLIENTE OFICINA TOPICO

ESTAR CHOFERESNPT. + 3.50 S.H

HABITACIÓN

DEP OFICINA

DEP

DEP

DEP OFICINA OFICINA

OFICINA COUNTER 17

COUNTER 18 COUNTER 19 COUNTER 20

NPT. + 3.50 NPT. + 3.50 NPT. + 3.50 NPT. + 3.50

CONTROL

S.HMUJERES S.HVARONES

S.HDISC.

NPT. + 3.50 ANDEN DE ASCENSO Y DESCENSO

ANDEN DE ASCENSO Y DESCENSO NPT. + 3.50 ANDEN DE ASCENSO Y DESCENSO

NPT. + 4.00

CONTROLNPT. + 3.50 S.H DISC.

S.HVARONES S.HMUJERES

01

0203040506

07080910

010203040506

07080910

NPT. + 3.50 NPT. + 3.00

CAMINERIA NPT. + 3.00 CAMINERIA

NPT. + 7.00 DESCANSO

COUNTER 06 OFICINA DEP.

COUNTER 05 OFICINA

DEP.

OFICINA DEP.

COUNTER 04 OFICINA

DEP.

OFICINA DEP.

COUNTER 03 COUNTER 01

OFICINADEP.

OFICINADEP.

OFICINADEP.

OFICINA DEP.

OFICINA DEP.

OFICINA

DEP.

COUNTER 07

COUNTER 08

COUNTER 09 COUNTER 10

COUNTER 11 COUNTER 12

ESTACIONAMIENTO PUBLICONPT. + 15.50

NPT. + 10.00 ANDEN DE ASCENSO Y DESCENSONPT. + 3.50

NPT. + 15.50 ESTACIONAMIENTO

PUBLICONPT. + 10.00

NPT. + 8.00 NPT. + 6.50

NPT. + 6.50 NPT. + 8.00

NPT. + 6.50

NPT. + 2.50 CAMINERIA 0102

03 010203

NPT. + 1.50 NPT. + 1.00

NPT. + 1.00 NPT. + 1.00

NPT. + 1.00 NPT. + 1.00

NPT. + 1.00 NPT. + 1.00NPT. + 1.00 NPT. + 1.50NPT. + 1.50

NPT. + 1.50 NPT. + 1.50

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00

NPT. + 2.50 NPT. + 2.50

NPT. + 2.50 NPT. + 2.00

CAMINERIA

NPT. + 1.50 CAMINERIA

NPT. + 2.00 CAMINERIA

NPT. + 1.50 NPT. + 1.50

030201

NPT. + 2.50 CAMINERIA

NPT. + 3.00 CAMINERIA

NPT. + 3.50

NPT. + 3.50 NPT. + 3.50 NPT. + 3.50 NPT. + 3.50 NPT. + 3.50

NPT. + 3.50 NPT. + 3.50NPT. + 3.50

NPT. + 3.50 NPT. + 3.50

NPT. + 3.50 NPT. + 3.50 CAMINERIA

NPT. + 3.50 NPT. + 3.50

NPT. + 3.00 NPT. + 3.00 NPT. + 3.00

NPT. + 3.00

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00 NPT. + 3.00 NPT. + 3.00

030201 030201

030201 PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACIONPROYECCIÓN DUCTO DE VENTILACION PROYECCIÓN DUCTO DE VENTILACION

PROYECCIÓN DUCTO DE VENTILACION

BARRA NPT. + 2.50

R. AGUEROCa. JOSE DE LA

PIMENTELCa. RICARDO

Av. H A I T I

Ca. YAPEYU

Ca. LUIS SANCHEZ CERRO Ca. LUIS SANCHEZ CERRO

Ca. LOS LIBERTADORES Ca. LOS PROCERES Ca. JOSE L

ESPINOZA

MENDOZA Ca. JACINTO

Ca. VELIZARDO BARRIGA

BUSTIOSCa. FEDERICO

ALCAZAR Ca. SAMUEL

Av. H A I T I

PISO DE PIEDRA LAVADA

PISO DE PIEDRA LAVADA BASURERO BARANDA

SARDINEL SARDINEL

PISO DE PIEDRA LAVADA PISO DE PIEDRA LAVADA

POSTE EXISTENTE

RAMPA

COUNTER 02

TALLER ZONA DEMANTENIMIENTO YLAVADO

CTO. DE HERRAMIENTAS CTO. DE BOMBAS FILTRO PRINCIPALTRAMPA DE GRASA

GARITA DE CONTROL

GARITA DE CONTROL GARITA DE

CONTROL

Pendiente de 8%

NPT. + 9.50

PENDIENTE DE 6%

EVACUACIÓN DE AGUA DE LLUVIA

PENDIENTE DE 10%

EVACUACIÓN DE AGUA DE LLUVIA

0101

NPT. + 10.00 RAMPA DE ACCESO

RAMPA DE ACCESO

Pendiente de 15%

Pendiente de 15%

ÁREA ESTACIONAMIENTO TAXIS CASETA DE

CONTROL NPT. + 9.00 NPT. + 8.00 NPT. + 6.00 NPT. + 5.00 NPT. + 4.00 010203040506

070809101112

131415161718

192021232422

252627282930313233353634

373839404142

AV. EMANCIPACION AV. GREGORIO ALBARRACIN

Ca. TORRES TAGLE

AV. GREGORIO ALBARRACIN

S.H S.H

NPT. + 10.00 ATRIO DE INGRESO

01 02

03 04 05 06 07 08 09 10 11 12 13

01 02

03 04

05 06

07

08 09

10

11

12 13 14 15 16 17 18 19

01 02 03 04 05 06 07 08

09 10

11 12 13

14

15

16

17

18

19

20

21

22

23

24 NPT. + 15.50

NPT. + 15.50

NPT. + 15.50 NPT. + 15.50

01 02 03 04 05

06 07

08 09

10 11

12 13

14 15 16 17

18

19 20

21

22

23

24

25

26

27

28

29

30 31

32 33

34 35

36 37

38 39

40

41

42

43

44

NPT. + 15.50 NPT. + 15.00

NPT. + 14.00 NPT. + 10.50

NPT. + 9.00 NPT. + 7.00

NPT. + 6.00

PENDIENTE DE 2%

EVACUACIÓN DE AGUA DE LLUVIA

NPT. + 9.50 NPT. + 8.50 NPT. + 8.00 NPT. + 7.50

NPT. + 6.50 NPT. + 11.00 NPT. + 11.50 NPT. + 12.00 NPT. + 12.50 NPT. + 13.00 NPT. + 13.50 NPT. + 14.50

NPT. + 4.50

NPT. + 5.00

NPT. + 4.50

NPT. + 4.00

NPT. + 3.50

NPT. + 3.00

NPT. + 2.50

NPT. + 0.00

NPT. + 0.50

NPT. + 1.00 NPT. + 1.50

NPT. + 2.00

NPT. + 3.00

NPT. + 3.00

NPT. + 5.50 NPT. + 5.00 NPT. + 4.50 NPT. + 4.00 NPT. + 3.50 NPT. + 3.00 NPT. + 2.50 NPT. + 2.00 NPT. + 1.50 NPT. + 1.00

NPT. + 5.50 NPT. + 6.00

NPT. + 6.50

NPT. + 7.00

NPT. + 11.00

NPT. + 15.50 PENDIENTE DE 1%

EVACUACIÓN DE AGUA DE LLUVIA

PENDIENTE DE 6%

EVACUACIÓN DE AGUA DE LLUVIA

PENDIENTE DE 15%

EVACUACIÓN DE AGUA DE LLUVIA

NPT. + 3.50

NPT. + 3.50 NPT. + 3.50

NPT. + 3.50 NPT. + 3.50 0102 03

010203

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00 NPT. + 2.00 NPT. + 2.00 NPT. + 2.00 NPT. + 2.00

NPT. + 2.00 NPT. + 2.00

NPT. + 2.00

NPT. + 2.00

NPT. + 2.00

01

NPT. + 1.00 CAMINERIA

0203

NPT. + 2.00

PROYECCIÓN DUCTO DE VENTILACION

S.H 01 02 03

NPT. + 1.00 NPT. + 1.00

NPT. + 1.00 NPT. + 1.00

NPT. + 1.00 NPT. + 1.00 NPT. + 1.50

NPT. + 1.50 NPT. + 1.00 01 02 03 01 0203

010203

01 02 03

010203 010203 NPT. + 2.50 NPT. + 2.50

010203

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00 NPT. + 3.00

NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00 NPT. + 3.00

NPT. + 3.50

1.40

030201

NPT. + 2.00 AREA DE TENDALNPT. + 1.00

LAVANDERIANPT. + 1.00 CUARTO DE

NPT. + 1.00 PLANCHADO

DEPOSITO NPT. + 1.00

PROYECCIÓN DUCTO DE VENTILACION S.H

NPT. + 3.00

3 n E i R v e l M I R A D O R

E S C A L A : 1 / 7 5

P L A N I M T E R I A G N E R L E A L

O C A L I Z A C I O N D E L B L O Q U E S E Ñ L A A D O

PROYECTO:

TESISTA:

ESCALA: FECHA:

PLANO:

ASESOR:

1/75 SETIEMBRE 2020

ARQ. ARMANDO DAVID RAMOS RAMOS

VIII TALLER TUTORIAL DE TESIS

UNIVERSIDAD PRIVADA DE TACNA

FACULTAD DE ARQUITECTURA Y URBANISMO

"PROYECTO ARQUITECTÓNICO DE UN TERMINAL TERRESTRE AL ALTIPLANO PARA EL ORDENAMIENTO DEL TRANSPORTE INTERPROVINCIAL DE LA REGIÓN TACNA, 2020"

No DE LAMINA:

PROYECTO - MIRADOR

AR-16

BACH. ARQ.

CRISTIAN ABEL SALVADOR SANCHEZ

N

M

(3)

MUROS INTERIORES LATEX MUROS EXTERIORES LATEX SATINADA CIELOS RASOS (CEMENTO) LATEX TIPO 1 PORCELANATO

LATEX TIPO 1

VIGAS Y COLUMNAS LATEX TIPO 1 BALDOSAS DE FIBRA MINERAL

BRUÑAS ENTRE LIMITE DE PARED,COLUMNA,VIGA REVOQUE Y ENLUCIDO CON SELLADORA BRUÑAS ENTRE LIMITE DE PARED,COLUMNA,VIGA REVOQUE Y ENLUCIDO CON PASTA MURAL

PINTURAS CIELO RASO MUROS VESTIDURA DE

CONTRAZOCALO PISOS

INTERIOR

EXTERIOR ACABADOS

h=0.10 (INTERIOR) Y EXTERIORES

CUADRO DE ACABADOS PRIMER NIVEL-HOSTAL

AMBIENTES

AMBIENTES

MADERA h=0.10 (INTERIOR)

HALL DE INGRESO HOSTAL

CERAMICO 20 X 30CM ZOCALOS

CERAMICO h=0.10 (INTERIOR)

VIDRIOS SISTEMA MODUGLASS 8 MM REVOQUE Y ENLUCIDO CON SELLADORA ADOCRETO ROJO

CEMENTO PULIDO h=0.10 (INTERIOR) ASLFALTO

PASILLO DE CIRCULACION

CEMENTO PULIDO

ENCHAPADO EN PIEDRA AZUL

PARAPETOS X PISO

ADMINISTRACION MODULOS DE TURISMO GUARDERIA CUARTO DE SERVICIO S.H SERVICIO HABITACIONES S.H HABITACIONES LAVANDERIA-HOSTAL CUARTO DE PLANCHADO AREA DE TENDAL COMEDOR COCINA ATENCION

CARPINTERIA METALICA MUROS EXTERIORES ESMALTE CERÁMICO ANTIDESLIZANTE 0.60 X 0.60 CERÁMICO ANTIDESLIZANTE 0.30 X 0.30 GRASS NATURAL

DESPENSA S.H DAMAS -COMEDOR S.H VARONES - COMEDOR DEPOSITO

DEPOSITO HOSTAL

"TERMINAL TERRESTRE AL ALTIPLANO"

PRO ECTO

PARA EL ORDENAMIENTO DEL TRANSPORTE INTERPROVINCIAL DE LA REGION TACNA-2020

PROYECTO:

TESISTA:

ESCALA: FECHA:

PLANO:

N° de LAMINA : ASESOR:

MENCIONADA SETIEMBRE 2020 ARQ. ARMANDO DAVID RAMOS RAMOS

VII TALLER TUTORIAL DE TESIS

BACH. ARQ.

CRISTIAN ABEL SALVADOR SANCHEZ FACULTAD DE ARQUITECTURA Y URBANISMO

"PROYECTO ARQUITECTÓNICO DE UN TERMINAL TERRESTRE AL ALTIPLANO PARA EL ORDENAMIENTO DEL TRANSPORTE INTERPROVINCIAL DE LA REGIÓN TACNA, 2020"

UNIVERSIDAD PRIVADA DE TACNA

PROYECTO: CUADRO DE ACABADOS POR ZONAS Y NIVELES

AR-17

(4)

PROYECCIÓN DUCTO DE VENTILACION

S.H

Piso: De Ceramico 0.30x0.30 Cm. Antideslizante

C

12

B B

A

A

C'

12'

PLANTA TIPICA S.H HABITACION

CORTE A - A

SS.HH.

CORTE B - B

1 1

PLANTA CLARABOYA

CORTE 1 - 1

EN OVALIN Y PEDESTAL DETALLE TÍPICO PARA LAVATORIOS

DETALLE DE BAÑO HABITACIONES

PROYECTO:

TESISTA:

ESCALA: FECHA:

PLANO:

N° de LAMINA : ASESOR:

INDICADA SETIEMBRE 2020 D-01

ARQ. ARMANDO DAVID RAMOS RAMOS

VIII TALLER TUTORIAL DE TESIS

BACH. ARQ.

CRISTIAN ABEL SALVADOR SANCHEZ FACULTAD DE ARQUITECTURA Y URBANISMO

"PROYECTO ARQUITECTÓNICO DE UN TERMINAL TERRESTRE AL ALTIPLANO PARA EL ORDENAMIENTO DEL TRANSPORTE INTERPROVINCIAL DE LA REGIÓN TACNA, 2020"

UNIVERSIDAD PRIVADA DE TACNA

PROYECTO: DETALLE DE BAÑOS EN HABITACIONES

(5)

B B

CORTE B - B

CORTE B - B

CORTE A - A A.1

A

A

31

PLANTA OVALIN

CORTE A-A

B B

A.1

A

A

31

REFUERZO DE MESADA

DETALLE 1

DETALLE DE MESON BAÑO

PROYECTO:

TESISTA:

ESCALA: FECHA:

PLANO:

N° de LAMINA : ASESOR:

INDICADA SETIEMBRE 2020 D-02

ARQ. ARMANDO DAVID RAMOS RAMOS

VIII TALLER TUTORIAL DE TESIS

BACH. ARQ.

CRISTIAN ABEL SALVADOR SANCHEZ FACULTAD DE ARQUITECTURA Y URBANISMO

"PROYECTO ARQUITECTÓNICO DE UN TERMINAL TERRESTRE AL ALTIPLANO PARA EL ORDENAMIENTO DEL TRANSPORTE INTERPROVINCIAL DE LA REGIÓN TACNA, 2020"

UNIVERSIDAD PRIVADA DE TACNA

PROYECTO: DETALLE DE BAÑOS EN HABITACIONES

(6)

DETALLE 1

COCINA

NPT= +2.50m.

Piso: De Ceramico 0.30x0.30 Cm. Antideslizante

33 34

A

A'

B B

A

A

C.1 C.1

CORTE A - A

CORTE B - B CORTE C - C

PLANTA TIPICA COCINA

CORTE C.1 - C.1

CORTE D.1 - D.1

COCINA

NPT= +2.50m.

Piso: De Ceramico 0.30x0.30 Cm. Antideslizante

33 34

A

A'

B B

A

A

C.1 C.1

REFUERZO DE MESADA

DETALLE DE COCINA-COMEDOR HOSTAL

PROYECTO:

TESISTA:

ESCALA: FECHA:

PLANO:

N° de LAMINA : ASESOR:

INDICADA SETIEMBRE 2020 D-03

ARQ. ARMANDO DAVID RAMOS RAMOS

VIII TALLER TUTORIAL DE TESIS

BACH. ARQ.

CRISTIAN ABEL SALVADOR SANCHEZ FACULTAD DE ARQUITECTURA Y URBANISMO

"PROYECTO ARQUITECTÓNICO DE UN TERMINAL TERRESTRE AL ALTIPLANO PARA EL ORDENAMIENTO DEL TRANSPORTE INTERPROVINCIAL DE LA REGIÓN TACNA, 2020"

UNIVERSIDAD PRIVADA DE TACNA

PROYECTO: DETALLE DE COCINA-COMEDOR HOSTAL

Referencias

Documento similar

"PROYECTO ARQUITECTÓNICO DE UN TERMINAL TERRESTRE AL ALTIPLANO PARA EL ORDENAMIENTO DEL TRANSPORTE INTERPROVINCIAL DE LA REGIÓN TACNA, 2020". UNIVERSIDAD PRIVADA

TERMINAL TERRESTRE INTERNACIONAL DE PASAJEROS EN LA CIUDAD DE TACNA 1 UNIVERSIDAD RICARDO PALMA FACULTAD DE ARQUITECTURA Y URBANISMO CARRERA DE ARQUTIECTURA TESIS PARA OPTAR EL

ANGGELA TP-01 SAMANTHA PILCO PILCO PROYECTO: PLANO: VIII TALLER TUTORIAL DE TESIS FACULTAD DE ARQUITECTURA Y URBANISMO "CENTRO COMERCIAL INTREGADOR DEL ESPACIO PÚBLICO PARA

NICOLAS EMILIO BOBADILLA JUAREZ EL RENDIMIENTO ACADEMICO DE LOS ESCOLARES EN LA REGION TACNA 2018" UNIVERSIDAD PRIVADA DE TACNA FACULTAD DE ARQUITECTURA Y URBANISMO ESQUEMA DE

UNIVERSIDAD PRIVADA DE TACNA FACULTAD DE ARQUITECTURA Y URBANISMO CARRERA PROFESIONAL DE ARQUITECTURA ANTEPROYECTO : DISTRITO DE TACNA - TACNA PLANO: ESCALA: 1/200 BACHILLER:

MIGUEL HINOJOZA VEGA UNIVERSIDAD PRIVADA DE TACNA FACULTAD DE ARQUITECTURA Y URBANISMO "PROYECTO DE RESTAURACION Y PUESTA EN VALOR DEL LOCAL INSTITUCIONAL DE LA PREFECTURA TACNA

UNIVERSIDAD PRIVADA DE TACNA FACULTAD DE ARQUITECTURA Y URBANISMO “DISEÑO ARQUITECTONICO DE SEDE ADMINISTRATIVA Y OPERATIVA PARA LAS ADECUADAS FUNCIÓNES Y ATRIBUCIONES DE LA REGION

ALUMINIO ESCALA 1/100 CAPANIQUE DEL DISTRITO DE POCOLLAY, TACNA - 2021" FACULTAD DE ARQUITECTURA Y URBANISMO TESISTA: UNIVERSIDAD PRIVADA DE TACNA ESCUELA DE ARQUITECTURA