• No se han encontrado resultados

Probabilistic seismic risk assessment

Fully probabilistic seismic risk assessment considering local site effects for the portfolio of buildings in Medellin, Colombia

Fully probabilistic seismic risk assessment considering local site effects for the portfolio of buildings in Medellin, Colombia

... Since the occurrence of earthquakes over the time cannot be predicted and a complete time window is an unknown quantity, a set of stochastic events is generated. Each scenario is characterized with an annual frequency of ...

25

Probabilistic seismic risk assessment for comprehensive risk management: modeling for innovative risk transfer and loss financing mechanisms

Probabilistic seismic risk assessment for comprehensive risk management: modeling for innovative risk transfer and loss financing mechanisms

... premium; a value usually reported in risk analyses. It is interesting to note that, according to Eq. 7.2, the expected present value of the losses is the expected loss in one year divided by the discount rate. In ...

8

Implications on seismic hazard and risk assessment of two cities of Colombia as a result of a lithospheric tear proposal in the NW South America

Implications on seismic hazard and risk assessment of two cities of Colombia as a result of a lithospheric tear proposal in the NW South America

... new assessment of the seismic hazard model for Colombia using the same methodology and information of the seismic hazard study updated for the national earthquake resistant building code ...a ...

13

Urban seismic risk index for Medellin, Colombia, based on a probabilistic loss and casualties estimation

Urban seismic risk index for Medellin, Colombia, based on a probabilistic loss and casualties estimation

... intermediate seismic hazard area according to the seismic zonation of Colombia although no destructive earthquakes have occurred having as a consequence low seismic risk awareness among its ...

29

Earthquake loss assessment for integrated disaster risk management

Earthquake loss assessment for integrated disaster risk management

... catastrophic seismic events is particularly low; this is one of the reasons why very limited historical data are ...events, risk estimation has to focus on probabilistic models which can use the ...

14

Holistic seismic risk estimation of a metropolitan center

Holistic seismic risk estimation of a metropolitan center

... a probabilistic framework, due to the uncertainties and randomness inherent to the energy and frequency contents of the ground motion, the duration of the strong phase, the nonstationary evolution of the signals, ...

8

Selection of local case studies with fully probabilistic hazard and risk assessments

Selection of local case studies with fully probabilistic hazard and risk assessments

... fully probabilistic risk assessment was to be performed for Medellín, the representation of the seismic physical vulnerability was done through vulnerability functions that besides allowing a ...

148

Total adult cardiovascular risk in Central America

Total adult cardiovascular risk in Central America

... 10% risk for cardiovas- cular events during the following ten ...this risk group decreased with age in both males and ...20% risk. More than 75% of those with a 30–40% risk had previously been ...

8

Cyber Risk Assessment for Insurability Verification

Cyber Risk Assessment for Insurability Verification

... Abstract: Nowadays, cyber-risks are an important aspect on the business agenda in every company, but they are difficult to analyse. Cyber-insurance is considered as appropriate means to absorb financial losses caused by ...

5

CONSRAT  Construction sites risk assessment tool

CONSRAT Construction sites risk assessment tool

... affect risk generation and its evolution. However, available risk assessment tools do not capture the specificities of construction sites that may affect risk, because they only focus on ...

17

Prioritizing interventions to reduce seismic vulnerability in school facilities in Colombia

Prioritizing interventions to reduce seismic vulnerability in school facilities in Colombia

... Colombian seismic code NSR-98 establishes the requirement for the seismic vulnerability analysis and, if necessary, the strengthening of public facilities ...by risk reduction programs, it is ...

24

Analysis and relations between organizational factors, company performance and risk level on site at construction sector

Analysis and relations between organizational factors, company performance and risk level on site at construction sector

... probable risk conditions on sites involving accident event reports (Camino López et ...through risk assessment based mainly on site conditions (Memarian & Mitropoulos, 2013; Cambraia et ...

130

new contributions to non linear process monitoring through kernel partial least squares

new contributions to non linear process monitoring through kernel partial least squares

... and its application to nonlinear process monitoring. Initially, the classic KPLS modeling is here extended by adding the projections of the outputs onto the latent space. The underlying structure of the KPLS modeling is ...

27

The Colombian Financial Sector From an Investor Perspective

The Colombian Financial Sector From an Investor Perspective

... üModel-based systems of risk management need to be considered and practical methods of risk assessment, risk mitigation and risk control need to be broadly implemented to avoid future[r] ...

34

Seismic structural assessment of a 40 years old melt shop facility

Seismic structural assessment of a 40 years old melt shop facility

... Dynamic Modal Spectral Analysis was performed for seismic analysis. The importance coefficient for essential infrastructure was used, since the design philosophy applied to the present evaluation is that the ...

9

Simplified probabilistic evaluation of the seismic performance of three pile supported bridges affected by liquefaction

Simplified probabilistic evaluation of the seismic performance of three pile supported bridges affected by liquefaction

... Most of the bridge structures along Route 5 performed well during the earthquake. The earthquake strong shaking triggered liquefaction and lateral spreading, particularly near rivers, streams, and along the coastline. ...

62

RPAS conflict-risk assessment in non-segregated airspace

RPAS conflict-risk assessment in non-segregated airspace

... conflict risk diminishes; if the number of RPAS is similar to conventional aircraft, the conflict risk barely varies; and if the number of RPAS is minor than conventional aircraft, the con fl ict risk ...

10

An approach for identifyation of areas with higher expected damage and definition of priority levels for prevention plans in Murcia Province (SE Spain)

An approach for identifyation of areas with higher expected damage and definition of priority levels for prevention plans in Murcia Province (SE Spain)

... A seismic risk study covering the Murcia Province (SP. Spain) in the frame of the R1SMUR project is presented. The risk has been represented in terms of expected damage for the ground [r] ...

14

Evolución del Método de Análisis de Resonancia Funcional (FRAM) mediante la combinación con otros métodos

Evolución del Método de Análisis de Resonancia Funcional (FRAM) mediante la combinación con otros métodos

... Patriarca et al. (2017c) proposes evolve the FRAM by combining it with Monte Carlos simulation. This method allows to use a probabilistic approach to define critical func- tions. Thus, Patriarca et al. (2017c) ...

10

Finite Gaussian mixtures and market risk assessment

Finite Gaussian mixtures and market risk assessment

... We propose a multi-asset-type portfolio and estimate sensibilities to risk factors, fit multivariate Normal, stationary and autocorrelated Gaussian Mixtures distributions and estimate ma[r] ...

133

Show all 3114 documents...

Related subjects