scheduling problem

Top PDF scheduling problem:

An Improved Hybrid Model for the Generic Hoist Scheduling Problem

An Improved Hybrid Model for the Generic Hoist Scheduling Problem

... Hoist scheduling is distinguished from classical scheduling problems, such as flowshop or jobshop, in that, first, no waiting of jobs during an operation is permissible, second, travel times of an operation ...

22

Evolutionary approaches for the parallel task scheduling problem : the representation issue

Evolutionary approaches for the parallel task scheduling problem : the representation issue

... The task allocation problem has been investigated by many researchers [3], [4], [8], [9], [10], [13], [14]. Various heuristic methods have been proposed, such as mincut-based heuristics, orthogonal recursive ...

10

Solving the flow shop scheduling problem under evolutionary approaches

Solving the flow shop scheduling problem under evolutionary approaches

... Shop Scheduling Problem preliminary results are promising and showed its potential by providing new near-optimal solution for the whole set of instances selected for ...

3

An algorithm to deal with due date violation in a multi-objective scheduling problem

An algorithm to deal with due date violation in a multi-objective scheduling problem

... a scheduling problem developed for a company that produces flexible packaging, presented in quite a general form ...this problem it is necessary to schedule several jobs that involve four process and ...

12

An improved ant colony algorithm for the job shop scheduling problem

An improved ant colony algorithm for the job shop scheduling problem

... So far, there exist a few applications of the ACO approach to scheduling problems. Dorigo et al. [10, 11] and Zwaan et al. [18] reported some promising results for the Job Shop Scheduling prob- lem. ...

11

A simple genetic algorithm for a minimal overlapping scheduling problem

A simple genetic algorithm for a minimal overlapping scheduling problem

... Machine Scheduling Problem: the Scheduling Problem with Time Windows and Minimal Overlap ...the problem consists on finding a starting time for each job which satisfies time window ...

11

A genetic approach using direct representation of solution for the parallel task scheduling problem

A genetic approach using direct representation of solution for the parallel task scheduling problem

... the problem of allocating a number of non-identical tasks in a multiprocessor or multicomputer ...list scheduling algorithm (LSA) is contrasted with an evolutionary approach using a direct representation of ...

9

An ACO approach for the Parallel Machines Scheduling Problem

An ACO approach for the Parallel Machines Scheduling Problem

... Seeing the different shades in tables 2, 3, and 4, we can notice that the EDD heuristic is the darkest in all the problems and instances, followed by SLACK heuristic in the second place, and SPT in the third place. The ...

12

Solving the single machine scheduling problem with sequence-dependent set-up times as a TSP via evolutionary algorithms

Solving the single machine scheduling problem with sequence-dependent set-up times as a TSP via evolutionary algorithms

... intelligence. Scheduling problems typically comprise several concurrent (and often conflicting) goals, and several resources which may be allocated in order to satisfy these ...to scheduling have been ...

3

A GRASP algorithm to solve the problem of dependent tasks scheduling in different machines

A GRASP algorithm to solve the problem of dependent tasks scheduling in different machines

... Approximate methods [3, 4 and 5] on the other hand, do try to solve the most complex variants in which task and machine behavior intervenes as we previously mentioned. These methods do not analyze exhaustively every ...

10

Algorithm creation and optimization for the crew pairing problem

Algorithm creation and optimization for the crew pairing problem

... Pairing Problem) para que produzca un coste mínimo por tripulante y en el que considera de igual forma a tripulantes técnicos y tripulantes de cabina por influir de igual manera en el problema, aunque se centra en ...

44

A survey on financial applications of metaheuristics

A survey on financial applications of metaheuristics

... Project Scheduling Problem (FPSP), also known as the Capital Constrained Problem, is an optimization problem considered of crucial importance to support financial decisions under the ...

24

Show all 1508 documents...