• No se han encontrado resultados

[PDF] Top 20 Guidelines for addressing Ramsar sites which no longer meet the Criteria for designation (Resolution VIII.22)

Has 10000 "Guidelines for addressing Ramsar sites which no longer meet the Criteria for designation (Resolution VIII.22)" found on our website. Below are the top 20 most common "Guidelines for addressing Ramsar sites which no longer meet the Criteria for designation (Resolution VIII.22)".

Guidelines for addressing Ramsar sites which no longer meet the Criteria for designation (Resolution VIII.22)

Guidelines for addressing Ramsar sites which no longer meet the Criteria for designation (Resolution VIII.22)

... between the terms of paragraphs 6 and 7 of Resolution ...loses the values, functions and attributes for which it was included and that part is proposed for removal from the ... See full document

21

Resolution IX.6 Guidance for addressing Ramsar sites or parts of sites which no longer meet the Criteria for designation

Resolution IX.6 Guidance for addressing Ramsar sites or parts of sites which no longer meet the Criteria for designation

... by the Convention to assist Contracting Parties where a Ramsar site ceases to fulfill the Criteria for designation as a Wetland of International Importance, with the ... See full document

9

Guidelines for international cooperation under the Ramsar Convention

Guidelines for international cooperation under the Ramsar Convention

... 19. For migratory waterbirds the Ramsar Convention has a responsibility as a part of international cooperation to see the important wetland habitats which form flyways recognized and ... See full document

25

Ramsar COP9 DOC. 15 Information paper Issues and scenarios concerning Ramsar sites or parts of sites which cease to meet or never met the Ramsar Criteria

Ramsar COP9 DOC. 15 Information paper Issues and scenarios concerning Ramsar sites or parts of sites which cease to meet or never met the Ramsar Criteria

... to the drying up of the wetlands and the disappearance of the internationally important waterbird populations for which the sites were originally ...designated. ... See full document

11

Issues and options concerning the further elaboration of the Ramsar criteria and guidelines for the future development of the List of Wetlands of International Importance

Issues and options concerning the further elaboration of the Ramsar criteria and guidelines for the future development of the List of Wetlands of International Importance

... about the consequences of developing a separate Criterion or Criteria for Ramsar site designation on socio-economic ...to designation of sites in the network ... See full document

12

The Ramsar Sites Information Service (RSIS): progress, developments and tools for Contracting Parties supporting Ramsar site designation

The Ramsar Sites Information Service (RSIS): progress, developments and tools for Contracting Parties supporting Ramsar site designation

... Guidelines for the future development of the List of Wetlands of International ...Therefore the RSIS will increasingly develop towards an important support service for ... See full document

12

Guidelines based on validity criteria for the development of multiple choice items

Guidelines based on validity criteria for the development of multiple choice items

... construction for university lecturers and the other on the writing of questionnaires in psychology for PhD ...advantages. The main fl aw with the current and previous ... See full document

7

Ramsar National Report to COP13 Section 1: Institutional Information - COP13NR PNG e

Ramsar National Report to COP13 Section 1: Institutional Information - COP13NR PNG e

... assessment for the effectiveness of the management of both Ramsar Sites (T onda and Lake Kutubu) were conducted using METT in mid ...through the financial and technical ... See full document

20

NATIONAL REPORT ON THE IMPLEMENTATION OF THE RAMSAR CONVENTION ON WETLANDS

NATIONAL REPORT ON THE IMPLEMENTATION OF THE RAMSAR CONVENTION ON WETLANDS

... Plan for wetland CEPA ...of the Environmental Board.The main services of the Nature Education Department of the Environmental Board are: 1) shaping and implementing educational programs in ... See full document

26

Data and information needs

Data and information needs

... i) The Centre’s Ecosystem Assessment Programme was established in 2006 to address the growing demand for integrated information on the state of and trends in the world’s ecosystems and ... See full document

36

WETLANDS OF INTERNATIONAL IMPORTANCE (RAMSAR SITES) IN C A N A DA

WETLANDS OF INTERNATIONAL IMPORTANCE (RAMSAR SITES) IN C A N A DA

... of the sites in Canada feature signs or displays (at or near the site) that note the wetland's designation as a Ramsar site or Wetland of International Importance (Figure ... See full document

57

About this series of handbooks

About this series of handbooks

... The Ramsar Convention Secretariat wishes to acknowledge the very many people who have, over several years and numerous meetings of the Conferences of the Contracting Parties, ... See full document

100

Guidelines for Global Action on Peatlands (GAP)

Guidelines for Global Action on Peatlands (GAP)

... 11. Ramsar Contracting Parties have recognized the global significance of peatlands through Recommendation ...6.1 which called for further cooperation on the conservation of global ... See full document

10

Regional overview of the implementation of the Convention and its Strategic Plan 1997-2002: Africa

Regional overview of the implementation of the Convention and its Strategic Plan 1997-2002: Africa

... The Ramsar Bureau has been cooperating with the Lake Chad Basin ...Commission. The Presidents of Chad, Niger, and Nigeria, and high-level representatives of the Presidents of Cameroon ... See full document

39

An evaluation of entrepreneurship orientation within the LEADER+ program in the European Union

An evaluation of entrepreneurship orientation within the LEADER+ program in the European Union

... to the entrepreneurial orientation within the three LAG’s ...in the specialized literature is called ...to the actions focused on bringing together social and economic actors for ... See full document

12

Towards the convergence of accounting treatment for intangible assets

Towards the convergence of accounting treatment for intangible assets

... them for their fair value at the time of ...as the amount at which an asset could be bought or sold in a current transaction between willing parties, that is, other than in a forced or ... See full document

17

Peatlands and climate change – crucial facts

Peatlands and climate change – crucial facts

... improving the questionnaire format (tick boxes, limited free text, ...of the Ramsar Global Action on Peatlands (CCGAP), national peatland assessment, reporting to other Conventions, and national ... See full document

6

Ramsar Information Sheet – 2012 Next steps

Ramsar Information Sheet – 2012 Next steps

... 7. The motivation of those Contracting Parties (CPs) requesting these additions was a foreseen benefit in being able to use the new RIS format for multiple functions – especially with potentially as ... See full document

14

Vol. 89, Núm. 1 (2018)

Vol. 89, Núm. 1 (2018)

... since the hydrocephalies were fre- quent, with the fortification of folic acid and the opti- mization of perinatal care of the preterm child, hydro- cephalies due to neural tube defects or ... See full document

6

CONVENTION ON WETLANDS (Ramsar, Iran, 1971)

CONVENTION ON WETLANDS (Ramsar, Iran, 1971)

... used for agriculture because of their natural suitability and the demands of agriculture for flat, fertile land and a ready supply of fresh water, and that therefore there is a high priority to ... See full document

6

Show all 10000 documents...