An earthen structure, although occasionally complex (see preceding chapters, particularly the chapter on special structures), is generally one of the simplest structures to build.

Thus its user quality depends, more so than in other areas, on precision of command, preparation, site organization and the techniques of the various agents involved.

Again, more so than in other areas, quality control depends on the involvement of all concerned.

The formalism of the procedure, described below – and which could perhaps be summarized as “write down what we intend to do, do what we wrote down, write down what we did, check that we did well what we wrote down, and keep what we wrote” – is absolutely necessary and must be strictly observed.

Quality is a whole which is not just the production of documents (ESDQ, SOPAQ, PAQ, SDQ, etc.), but covers all the phases of studies for preparation of the project and execution of the works.

A good geotechnical survey, good adaptation of execution times to the periods to be observed in relation to regulatory procedures (classified facilities, etc.), thorough study of the project file by the contractor, and thorough site preparation are all factors that will contribute to superior quality on the ground.

Producing paper is not an end in itself, and is definitely no guarantee of quality.

For example, a quality organization note, the main feature of the contractor’s Quality Assurance Plan, may often be set out on three or four typed sheets if they provide a good definition of site organization (organization chart, the role of each person and particularly subcontractors, the means used, frequency and nature of checks, sensitive points and stoppage points, management of anomalies, and the first procedures required to start work).

However, this must be a living document which evolves along with the site to make organization of the site increasingly efficiency.

Quality is above all a state of mind and it is everyone’s business, at all times.

Without this continuous collective involvement of all those involved, the objective has little chance of being met.

Nom de la tâche Task name

1 PERIODE PREPARATOIRE PREPARATION PERIOD

2 Présentation du DCE et du dossier

géotechnique par le MOE Presentation of the DCE and the geotechnical file by PM

3 Reconnaissances complémentaires Further investigations 4 Projet de mouvement de terres Earth movement project

P r e a m b l e

O p e r a t i o n s t o b e c a r r i e d o u t b y t h e c o n s t r u c t i o n m a n a g e r

Operations

Documents to be submitted and materialization

Production time Period for a response by the contractor

1 Plans for definition and longitudinal sections

Plans, longitudinal sections

On notification of the period of preparation

2

Data from computer calculations for definition of horizontal axes and longitudinal section

Listings of current section and restorations.

On notification of the period of preparation

3 Execution drawings (1) List of cross sections and

type cross sections On notification of the period of preparation

4 Plans of known networks Plans As above

5 Main precision traverse

line Situation plan

Posts Traversing

1 month after notification of the period of

preparation

6

Plan of land requirements Plans and listings of posts

Demarcation

On notification of the period of preparation

Possible remarks before the end of the period of

preparation

7 General pegging Plans, listings of singular

points and pegging 1 month after notification of the period of

preparation

Investigation report at the end of the period of preparation

8 Plans of safety equipment and provisional signing (1)

Operating report 1 month after notification of the period of

preparation

9

Provision of terrain, provision of land requirements.

Inventory drawn up jointly by all parties concerned.

Parcel plan, investigation report on demarcation with joint signature

1 month after notification of the period of

preparation

Drawing up the joint report by all parties concerned no later than at the end of the period of preparation

(1) Insofar as these execution documents, drawn up on the responsibility of the roads manager, are the responsibility of the construction manager

Operations to be carried out by the construction contractor

The period of preparation must be adapted in accordance with the size of the site and the specific studies to be carried out before any actual work begins. This period may commence:

• on notification of the contract (this solution is not recommended);

• with a specific service order (recommended solution, set out in the tables);

• with a service order for commencement of work when it is included in the period for execution.

The periods shown are for information purposes, and may be modulated in accordance with the size of the site and the nature and complexity of the work to be carried out.

Operations

Documents to be submitted and materialization

Production time

Maximum period for a response by the

contractor

1

Additional geotechnical

investigation Bores

Report, plans, test results 1 month 1.5 months after

notification of the period of preparation

7 days

(opinion of external check)

2

Earth movement project and topsoil movement plans

Plans, longitudinal sections, graph tables

End of the period of preparation and at least 15 days before the commencement of earthworks

15 days

(opinion of construction manager)

3 General work program Explanatory note

Schedule (1) 10 days before the end of

the period of preparation 10 days 4 Site facilities project Paper + Plans 10 days before the end of

the period of preparation

7 days

5

Proposal for origin and nature of materials for embankment, upper parts of earthworks, capping layer (3)

Papers, documentation,

samples, test results 1 month before the commencement of supplies for each of the parts of the structures concerned

15 days

(opinion of external check)

6

Studies of treatment of soils for

embankments/fills, upper parts of earthworks, capping layer (3)

Papers, formulation

studies, test results 1 month before commencement of treatment for each of the parts of the structures concerned

15 days

(opinion of external check)

7

Program for studies and submission of execution plans

Program 1 month after notification of the period of

preparation

Opinion of construction manager

In 15 days Note on general

organization 1 month after notification of the period of

preparation

15 days

(approval of construction manager)

Quality Assurance Plan for

Studies 15 days before the date

of the meeting for commencement of studies

7 days

(approval of construction manager)

8

Establishment of framework for Quality Assurance Plans and the Environmental Assurance Plan (PAE) (stoppage point)

P r e a m b l e

Operations to be carried out during the work stage

Operations

Documents to be submitted and materialization

Production time

Maximum period for a response by the

contractor

11

Breakdown of unit prices (with the exception of those submitted in the bid)

Breakdown End of the period of

preparation Not applicable, unless there is any inconsistency with the prices

specification

12

Declaration of intent to

commence work (DICT) Letters to services concerned (EDF

electricity supply agency, PTT postal service, drinking water supply agency, etc.)

15 days after notification of the period of

preparation

Not applicable

13

Operating reports for

traffic work (2) (3) Reports 2 months before commencement of work on the section considered

15 days (4) (acceptance by the construction manager following opinion by the roads manager)

14

Transport route Plans Diagrams

Notes, inventories drawn up jointly by all parties concerned

15 days before the end of the period of preparation

15 days (acceptance by the construction manager following opinion by the project owner of the routes used)

15

Provision of company

laboratory Certificate of calibration

of equipment 1 month after notification of the period of

preparation

15 days (acceptance by the construction manager)

16 Execution plans (2) 1 month before execution

of the part of the structure concerned

Approval 15 days after reception of the documents

(1) The “railway” diagram seems to be the most suitable for major earthworks.

(2) If left to the contractor (to be avoided in general). This document must be drawn up on the responsibility of the manager by the construction manager.

(3) Services to begin during the period of preparation, in due consideration of the periods required for their execution, and to be continued after the service order to start work.

(4) It should be noted that, for major routes, the CRIR requires a reply period of at least 6 weeks.

P r e a m b l e

Operations to be carried out during the work stage

Operations

Documents to be submitted and materialization

Production time

Maximum period for a response by the

contractor

1 Acceptance of

subcontractors 2.5 months before

commencement of work by subcontractors

21 days (acceptance is issued by the project owner)

2 Special subcontractor

document Special subcontractor

document 2 months before

commencement of work by subcontractors

2 months

3

Subcontractor Quality Assurance Plan

Report with special subcontractor document

In accordance with the work progress made, 30 days before their commencement

15 days for approval by the construction manager

4

Evolution of Quality Assurance Plan

New procedures, updating of procedures

In accordance with the work progress made, 30 days before execution

15 days for approval by the construction manager

5 Updating of the program

for execution Schedule Partial schedule every 15

days and every month for the general schedule

7 days for approval by the construction manager

6

Specific detailed programs, partial programs, site report graph

Schedules, plans, notes on specific stipulations

In general, every 15 days 7 days for approval by the construction manager

7

Updating of the financial program

Accounts schedule Every 3 months

Validation tests (stoppage point) including:

- acceptance of site shops Material description files 15 days before

commencement of each 3 days to lift stoppage point

8

- evaluation of the procedure for execution

Results of checks and report

The first day of execution 1 day to lift stoppage point

P r e a m b l e

Operations to be carried out during the work stage

Operations

Documents to be submitted and materialization

Production time

Maximum period for a response by the

contractor Check on work Daily monitoring reports,

report on tests, checks and daily updating of quality file

Every day

Identification of materials for embankments/fills or deposit, and materials for upper parts of earthworks

d i l

Results of tests and reports, adjustment of thicknesses of layers and (or) material

Every day

Q/S compaction Tachometer disks - report Every day

Bearing capacities in the main body of

b k /fill

Results of bearing

capacity tests See CCTP

Conformity of

subformation (stoppage point)

Results of measurement of bearing capacity Results of geometry check (topographical

di )

End of earthworks on section for reception, and at least 10 days before commencement of

i l

10 days to lift stoppage point

Conformity of capping

layer (stoppage point) Ditto subformation End of work on the

section considered 10 days to lift stoppage point

9

Conformity of geometry

of cuts (stoppage point) Cross sections 10 days before implementation of capping layer

10 days to lift stoppage point

10 Updating of earth

movement plans Plans, longitudinal

sections At least every 2 months

11

Implementation of axes before conformity report on capping layer

Listing

Pegging of axis

15 days before reception of capping layer

P r e a m b l e

Operations to be carried out on completion of work

Operations

Documents to be submitted and materialization

Production time

Maximum period for a response by the

contractor

1

Quality Assurance Plan

completed All items making up the

Quality Assurance Plan 2 months after report on pre-reception operations or after execution of structures

7 days for verification of the contents

2

Conformity of drawings with execution of the structure

All plans sent to the contractor by the construction manager in the contract file with updated site work, movement of earth carried out, and

execution plans drawn up by the contractor

Tracings, copies, digital supports, notes, reductions

2 months after report on pre-reception operations or after execution of structures

15 days for verification and any remarks

F - Pathologies