3. MATERIAL Y MÉTODO
3.5 Consideraciones éticas
Sector
Total project
cost
(€ million)
IFI loan finance
(€ million) Donor TA committed (€ million) Donor co-financing committed (€ million) Project status
Georgia
Tbilisi Water Supply Improvement Project Water supply / sanitation 30.0 EBRD (15.0) Canada (0.05) EU (0.25) Sweden (0.9) – Under development
Renovation of the Tbilisi municipal water supply system.
Tbilisi Metro Energy Efficiency Project
Energy / heating Transport
16.25 EBRD (13.0) – – Under development
Capital investments to improve energy efficiency, improve the reliability of the power system and rehabilitate passenger cars.
Batumi Public Transport Project Transport 3.72 EBRD (2.5) Canada (0.04) – Under development
Improvement of municipal public transport services.
Kyrgyz Republic
Institutional Capacity Building – Biodiversity Conservation Nature conservation / biodiversity 0.25 – IFC (0.1) UK (0.1) – TA approved
TA project to promote private sector involvement in biodiversity conservation and support for local livelihoods in communities adjacent to the Kumtor Gold Mine, an EBRD investment project.
Romania
Sustainable Energy Finance Facility
Energy / heating
85.0-105.0 EBRD (75.0) Canada (0.05) – Cancelled
Credit line for industrial energy efficiency and renewable energy projects.
Russia
Kaliningrad Solid Waste Management Waste management 70.1 EBRD (8.5) NIB (11.8) – NDEP (10.1) On hold
Improvements in solid waste management through the construction of EU-compliant sanitary landfills, transfer stations and purchase of trucks.
Kazan Water and Waste-water Project Water supply / sanitation 26.36 EBRD (20.41) EU (0.1) Finland (0.19) – Under development
Improvements in municipal water and waste-water infrastructure and services to contribute to reduced levels of pollution in the Volga River and the Caspian Sea basin.
St. Petersburg District Heat Metering Project
Energy / heating
87.4 EBRD (29.37) EU (0.2) UK (0.01)
– Cancelled
Installation and operation of meters in 17,000 buildings serviced by local district heating companies, as part of a reform programme for district heating and municipal housing.
Kaliningrad Water and Environment Services Rehabilitation: District Heating
Energy / heating
21.8 EBRD (12.0) EU (0.3) Sweden (1.7)
NDEP (7.3) Under development
Rehabilitation of the district heating system, the promotion of sound pricing policies and practices and the institutional development of the district heating utility.
4 4 P P C R E P O R T E N V I R O N M E N T F O R E U R O P E B E L G R A D E 2 0 0 7 Sector Total project cost (€ million)
IFI loan finance
(€ million) Donor TA committed (€ million) Donor co-financing committed (€ million) Project status
Serbia
Duboko Solid Waste Management Project
Waste management
11.6 EBRD (5.0) – EAR (3.0) Under development
Construction of a regional sanitary landfill in compliance with EU rules for nine municipalities of eastern Serbia.
Panˇcevo Waste-water System Project Water supply / sanitation 15.8 EBRD (9.85) – EAR (2.5) Italy (1.79) Under development
Construction of a waste-water treatment plant and extension of the sanitary network to reduce the discharge of chemical waste into the River Danube.
Development of an
Environmental Management System for Elektro Privreda Srbije
Energy / heating
0.5 – EAR (0.5) – TA approved
TA to help Elektro Privreda Srbije improve its existing environmental management system and integrate it into its overall day-to-day management.
Slovak Republic
Sustainable Energy Finance Facility Energy / heating75.0 EBRD (60.0) – – Under development
Development of a financing facility for sustainable energy projects in the Slovak Republic.
Tajikistan
Southern Tajikistan Water Rehabilitation Project
Water supply / sanitation
4.6 EBRD (1.52) Sweden (0.5) – Under development
Rehabilitation of the water supply systems of the cities of Dangara and Kulyob through improvements to the water intake system, and rehabilitation of the water supply distribution system.
Regional
Pro-biodiversity Business in the Steppe Zones of the Eurasia Region
Nature conservation / biodiversity
0.6 – EU (0.6) – TA approved
A pilot TA project to encourage improved biodiversity management in the steppe ecosystems of Kazakhstan, Moldova, Russia and Ukraine. The project will support micro, small and medium-sized enterprises that use biodiversity resources and help create pro-biodiversity businesses.
© Project Preparation Committee Secretariat, 2007
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, including photocopying and recording, without the written permission of the copyright holder. Such written permission must also be obtained before any part of this publication is stored in a retrieval system of any nature.
Cover and interior printed on Core Silk. The paper used in this report is manufactured to the strictest environmental standards from Elemental Chlorine Free pulps in a mill which holds ISO 14001 and EMAS environmental accreditations.
Design and print production by Kate Hardy.
Printed in the United Kingdom by Stabur Graphics using vegetable-based printing inks.
Project Preparation Committee Secretariat
European Bank for Reconstruction and Development One Exchange Square
London EC2A 2 JN United Kingdom