4.4 MARCO LEGAL
4.4.6 Derrames De Hidrocarburos
SITE SELECTION PROCESS:
The following questions regarding BMP site selection are meant to serve as reminders of some of the most fundamental factors that should be considered during the site selection process. Should the site in question fail to receive preference within this questionnaire, that site should not necessarily be dismissed, however; additional caution should be used during consideration of that site. Upon completion of the site selection process, proceed to the BMP selection portion of this questionnaire.
SITE SELECTION CONSIDERATIONS:
1. Is the BMP site in question located such that any treated stormwater can be subject to re-contamination on its path to the outfall from the subject property?
Preference should be given to sites that will allow the treated stormwater to either discharge directly to the receiving stream, or to follow a path that will not subject the treated stormwater to any polluted or unstable surface prior to outfall from the property.
2. What type of existing ground cover will be removed or disturbed for placement of a BMP at the site in question?
Preference should be given to sites that will not require the removal or disturbance of existing healthy vegetation including dense turf grass, trees or other native vegetation. Preference should also be given to BMP sites that will not require the disturbance or removal of an existing stable and healthy natural stormwater conveyance system, such as a stream.
3. Does the BMP site display any topographical or geological characteristics that might cause excessive difficulty in BMP construction and maintenance, or that will substantially decrease the efficacy of a BMP, such as extreme slopes or exposed or shallow bedrock?
Preference should be given to sites that will not require the excavation and
removal of large bedrock structures, due to excessive cost. Preference should also be given to sites that are not located on or immediately adjacent to extreme slopes due to the difficulty in stabilizing the adjacent slopes as well as the likelihood of slope failure due to the concentration of stormwater in the adjacent BMP.
4. Is the BMP site located in close proximity to a direct conduit to groundwater, such as a sinkhole, losing stream, or cave system?
Preference should be given to sites that are not in close proximity to a direct conduit to ground water. BMP sites, during the course of treating stormwater, often concentrate pollutants until those pollutants can be assimilated. Excessive storm events can cause these pollutants to be removed from the BMP site and enter into these environmentally sensitive features.
5. Does the BMP site in question offer reasonable access for routine maintenance?
Preference should be given to sites that are easily accessible during most weather conditions. Access to the site during varying weather conditions should be
feasible to allow for inspection and maintenance. Any site that is likely to receive a BMP that promotes deposition of sediment should be accessible to equipment suitable for removal of sediment on an annual or biennial basis with minimum disturbance to the surrounding.
6. Is the BMP site in question located such that construction, maintenance, or the existence of the BMP will place construction and maintenance personnel or the general public at excessive risk or subject the property owner to excessive liability?
Preference should be given to sites that are not located such that construction or maintenance personnel or the general public will be continuously subjected to excessive risk of injury during construction or maintenance on the BMP site. BMPs that will incorporate either permanent or long lasting pools of water should not be located in close proximity to areas of heavy pedestrian traffic, unless those sites can be fenced or offer some other deterrent.
7. Is the BMP site in question within immediate proximity to a foundation, retaining wall, roadway or other structure that could be adversely affected by the frequent inundation of stormwater at the BMP site or repeated or constant elevated soil moisture levels?
Preference should be given to sites that will not pose a threat to the physical integrity of adjacent structures. Sites that lie adjacent to and upslope from these structures should be considered with a great deal of caution.
BMP SELECTION PROCESS:
The following portion of this questionnaire is meant to serve as guidance during the BMP selection process for a given site. The majority of BMPs can be altered or redesigned to work with sites outside of their normal or recommended scenarios, as such; dismissal of a BMP as a result of this questionnaire does not mean that the BMP can not be modified for use in the specific application. In addition, supplemental thought should be given to the BMP selected as a result of this questionnaire. The criteria for this BMP
questionnaire and the associated BMP Scoring Matrix are based on common recommended practices.
The BMP scoring matrix should be present during completion of the following portion of this questionnaire.
1. Approximate the area available for placement of the BMP within the selected site.
Area Available: _______________
2. Approximate the size of the area draining to the proposed BMP site.
Drainage Area: _______________
3. Determine the size of the area available for BMP placement as a percent of the total drainage area.
Percent of Drainage Area = (Area Available / Drainage Area) x 100 Percent of Drainage Area: _______________
4. Does the BMP site in question reside in close proximity to a structure as defined in item #7 of the BMP Site Selection Process? Consider close proximity as 10- feet or less from the downhill side or 100-feet or less from the uphill side. Distance to Structure (if applicable):_______________ 5. Will the proposed BMP site receive stormwater in the form of sheet flow or
concentrated flow?
Sheet Flow or Concentrated Flow: _______________
6. Will a permanent or long term pool of water be acceptable at this BMP site? Pool Acceptable / Unacceptable: _______________
7. Are the underlying soils of the proposed BMP site well drained soils or poorly drained soils? (high or low saturated hydraulic conductivity)
Well Drained / Poorly Drained Soils: _______________ 8. Is the ENTIRE area draining to the BMP site comprised of pervious surface,
impervious surface, or both?
Pervious / Impervious / Both: _______________
9. The BMP Scoring Matrix has rows labeled 1-8 that correspond to the answers from questions 1-8 of the BMP Selection Process, above. Proceeding with row #1, review each cell within that row and strike through any cell that does not concur with your answer from question #1.
Complete this same task for rows 2-8, corresponding to answers 2-8, above. 10. Strike through any column (1-19) that contains a cell that is struck through as a
result of non-concurrence with answers 1-8, above.
11. The columns that remain are BMP options available for this particular site. Each column lists the type of BMP as well as a ranking for various
environmental, cost, and infrastructure criteria. The numeric rankings contain a number, one through five (1-5), five being the most desirable, and one being the least.
Example:
A BMP with a ranking of 5 in the row labeled “Detention” offers greater capability for stormwater detention than does a BMP with a ranking of 1 in the row labeled “Detention”