1051 North Miami Beach Boulevard North Miami Beach, Florida (P&Z Item No. 10-482 of March 14, 2011)

RESOLUTION R2011-19

2 WHEREAS, the property described herein is zoned CF, Community Facility District; and WHEREAS, the applicant requests site plan approval and variances in order to construct a 19,680 square foot, two-story classroom addition to an existing school campus on a 129,106 square

foot (2.96 acre) lot located at 1051 North Miami Beach Boulevard; and

WHEREAS, the Planning and Zoning Board on March 14, 2011 recommended approval of the site plan and related variances, subject to the following conditions:

1. Plans submitted for building permit(s) shall substantially comply with those as currently submitted, including the following:

• Survey, Sheet SU-100, by J.H. Manucy, Inc., dated 10/1/1993, revised 8/26/2009; • Paving, Grading & Drainage Plan, Sheet C-100, by Zyscovich Architects, dated

11/18/2009, revised 12/12/2009;

• Planting Plan, Sheet L1.0, by Zyscovich Architects, dated 11/6/2009, revised 12/12/2009;

• Alternate Planting Plan Notes and Details, Sheet L1.1, by Zyscovich Architects, dated 11/6/2009, revised 12/12/2009;

• Tree Disposition Plan, Sheet TD-1.0, by Zyscovich Architects, dated 11/6/2009, revised 11/12/2009;

• Demolition Site Plan, Sheet D-100, by Zyscovich Architects, dated 2/18/2011; • Proposed Master Site Plan, Sheet MS-100, by Zyscovich Architects, dated

2/18/2011;

• Site Plan Phase, Sheet A-101, by Zyscovich Architects, dated 2/18/2011; • First Floor Site Plan, Sheet A-211, by Zyscovich Architects, dated 2/18/2011; • Second Floor Plan, Sheet A-221, by Zyscovich Architects, dated 2/18/2011; • Third Floor Plan, Sheet A-231, by Zyscovich Architects, dated 2/18/2011; • Elevations, Sheet A-501, by Zysocvich Archetects, dated 2/18/2011; • Elevations, Sheet A-502, by Zysocvich Architects, dated 2/18/2011; • Elevations, Sheet A-503, by Zysocvich Architects, dated 2/18/2011;

• Site Plan Photometric Electrical, Sheet E-101, by Zyscovich Architects, dated 2/18/2011.

2. All utilities, including but not limited to electrical, cable television and telephone must be located underground. The manner of locating these utilities, as well as the location of the transformer(s) must be submitted to and approved by the Community Development Director. Transformers and other above ground equipment must be screened with landscaping.

RESOLUTION R2011-19

3 3. Project must be in complete conformity with the Americans with Disabilities Act (ADA) in accordance with State and Federal laws.

4. Building materials and color samples must be submitted to, and approved by, the Public Services Director prior to the issuance of a building permit for this project.

5. A lighting plan for the entire property shall be submitted by a qualified lighting professional. Said plan shall include the entire property, and, if necessary, the adjacent swale areas, and shall include decorative facade lighting in addition to that provided for safety and security needs. All exterior lighting shall be white lighting only. Lighting shall be contained on- site only and, in particular, not bleed into adjacent residential properties.

6. A revised landscape and irrigation plan, signed and sealed by a Florida registered Landscape Architect, shall be submitted to, and approved by, the City Forester. The plan shall be approved prior to the issuance of a building permit, and the installed materials inspected and approved prior to the issuance of a Certificate of Occupancy. This plan shall include all adjacent swale areas.

7. The design, dimensions, materials, quantity and location of all outdoor accessory features, including but not limited to security bollards, trash cans, light poles and street furniture must be submitted to and approved by the Public Services Director.

8. Garbage dumpsters shall be constructed of CBS, with roll up over-head doors, be large enough to encompass recycling materials and be equipped with air conditioning, running water, hose hook-up and a floor drain.

9. All modular structures must be removed prior to the issuance of a certificate of occupancy for the proposed classrooms.

10. If the City elects to dispose of the City's property located adjacent to the southeast corner of the subject property, it must be done in a manner approved by the City Attorney.

11. A unity-of-title must be created joining all parcels of the subject property. Said unity-of- title must be reviewed and approved by the City Attorney prior to the issuance of building permit(s) for this project.

12. When plans are submitted for building permit, a cover sheet must be included incorporating the final Resolution approving this project, including all conditions related to said approval.

NOW, THEREFORE,

RESOLUTION R2011-19

4 Section 1. Site plan approval in order to construct a 19,680 square foot, two story classroom addition, to an existing school campus on a 129,106 square foot (2.96 acre) lot, on

property legally described as:

(LENGTHY LEGAL - SEE ATTACHED EXHIBIT "'A") A/K/A

1051 North Miami Beach Boulevard North Miami Beach, Florida (P&Z Item No. 10-482 of March 14, 2011)

is hereby granted subject to the following conditions:

1. Plans submitted for building permit(s) shall substantially comply with those as currently submitted, including the following:

• Survey, Sheet SU-100, by J.H. Manucy, Inc., dated 10/1/1993, revised 8/26/2009; • Paving, Grading & Drainage Plan, Sheet C-100, by Zyscovich Architects, dated

11/18/2009, revised 12/12/2009;

• Planting Plan, Sheet L1.0, by Zyscovich Architects, dated 11/6/2009, revised 12/12/2009;

• Alternate Planting Plan Notes and Details, Sheet L1.1, by Zyscovich Architects, dated 11/6/2009, revised 12/12/2009;

• Tree Disposition Plan, Sheet TD-1.0, by Zyscovich Architects, dated 11/6/2009, revised 11/12/2009;

• Demolition Site Plan, Sheet D-100, by Zyscovich Architects, dated 2/18/2011; • Proposed Master Site Plan, Sheet MS-100, by Zyscovich Architects, dated

2/18/2011;

• Site Plan Phase, Sheet A-101, by Zyscovich Architects, dated 2/18/2011; • First Floor Site Plan, Sheet A-211, by Zyscovich Architects, dated 2/18/2011; • Second Floor Plan, Sheet A-221, by Zyscovich Architects, dated 2/18/2011; • Third Floor Plan, Sheet A-231, by Zyscovich Architects, dated 2/18/2011; • Elevations, Sheet A-501, by Zysocvich Architects, dated 2/18/2011; • Elevations, Sheet A-502, by Zysocvich Architects, dated 2/18/2011; • Elevations, Sheet A-503, by Zysocvich Architects, dated 2/18/2011;

RESOLUTION R2011-19

5 • Site Plan Photometric Electrical, Sheet E-101, by Zyscovich Architects, dated

2/18/2011.

2. All utilities, including but not limited to electrical, cable television and telephone must be located underground. The manner of locating these utilities, as well as the location of the transformer(s) must be submitted to and approved by the Community Development Director. Transformers and other above ground equipment must be screened with landscaping.

4. Project must be in complete conformity with the Americans with Disabilities Act (ADA) in accordance with State and Federal laws.

4. Building materials and color samples must be submitted to, and approved by, the Public Services Director prior to the issuance of a building permit for this project.

5. A lighting plan for the entire property shall be submitted by a qualified lighting professional. Said plan shall include the entire property, and, if necessary, the adjacent swale areas, and shall include decorative facade lighting in addition to that provided for safety and security needs. All exterior lighting shall be white lighting only. Lighting shall be contained on- site only and, in particular, not bleed into adjacent residential properties.

6. A revised landscape and irrigation plan, signed and sealed by a Florida registered Landscape Architect, shall be submitted to, and approved by, the City Forester. The plan shall be approved prior to the issuance of a building permit, and the installed materials inspected and approved prior to the issuance of a Certificate of Occupancy. This plan shall include all adjacent swale areas.

7. The design, dimensions, materials, quantity and location of all outdoor accessory features, including but not limited to security bollards, trash cans, light poles and street furniture must be submitted to and approved by the Public Services Director.

8. Garbage dumpsters shall be constructed of CBS, with roll up over-head doors, be large enough to encompass recycling materials and be equipped with air conditioning, running water, hose hook-up and a floor drain.

9. All modular structures must be removed prior to the issuance of a certificate of occupancy for the proposed classrooms.

10. If the City elects to dispose of the City's property located adjacent to the southeast corner of the subject property, it must be done in a manner approved by the City Attorney.

11. A unity-of-title must be created joining all parcels of the subject property. Said unity-of- title must be reviewed and approved by the City Attorney prior to the issuance of building permit(s) for this project.

RESOLUTION R2011-19

6 12. When plans are submitted for building permit, a cover sheet must be included incorporating the final Resolution approving this project, including all conditions related to said approval.

Section 2. A variance from Section 24-55(D)(3) to waive seventeen feet and four inches (17'4") of the minimum required front yard setback of thirty feet (30'), where front yard

setback of twelve feet eight inches (12'8') is proposed, on property legally described as aforesaid, is

hereby granted subject to the aforementioned conditions.

Section 3. A variance from Section 24-55(D)(4) to exceed by four feet (4') the