• No se han encontrado resultados

Disposiciones clave 1. Definición de niño

In document PORTADA POR DEFINIR. Guía Normativa (página 117-120)

DERECHOS HUMANOS DE LAS NIÑAS, NIÑOS Y ADOLESCENTES I. INTRODUCCIÓN

F. Disposiciones clave 1. Definición de niño

fig. 3-20

chaser

fig. 3-21

always deck anchor with chain between flukes

fig. 3-22

quickly pass drum

fig. 3-23

triangular plates on drum

Stevpris deployment for MODUs

Introduction

Typical methods for deployment and retrieval of Stevpris anchors with an anchor handling vessel (AHV) are described, focusing on the use of chasers for handling the anchor (fig. 3-20). This is the most common practice on mobile drilling rigs (MODUs). Handling using permanent pendant lines is similar.

Deployment procedures for the Stevpris anchor will also be given for permanent moorings where chasers are normally not used.

Laying anchors

It is preferred, and by some operators required, to deck the anchor before run out to check the jewellery. Run the anchor line out the full distance with anchor on deck or on roller, with the chain between the flukes (fig. 3-21). Boat increases power until anchor line tension rises on rig winch tension meter. When rig gives order to lower the anchor, veer pendant till anchor arrives at roller. Allow the anchor some speed to negotiate the bump at the change-over from the deck on to the roller (fig. 3-22).

If anchor is kept on roller, keep triangular plates below the main shackle on the drum for stability of the anchor. Alternatively the chaser can be kept on deck/roller. In this situation the propeller thrust passes underneath the anchor and does not influence the fluke (fig. 3-23).

Stevpris installation

74

fig. 3-24

STOP!

fig. 3-25

fig. 3-26

wait for signal rig Reduce propulsion momentarily when anchor passes the propeller thrust,

keep chaser on anchor head for control of anchor orientation and lower anchor (fig. 3-24).

Once below the propeller wash zone, reactivate and maintain propeller thrust to well above 30 tons. Keep constant tension in order to ensure anchor does not fall through chaser, i.e. anchor remains in the chaser and orientation of the anchor is correct (fig. 3-25).

Note: In some circumstances AHVs prefer to run the anchor hanging from the pendant line below the propeller wash approximately 60 to 80 meter above the seabed. This method requires less power on the winch during the actual laying of the anchor. If this method is employed, make sure that at all times the anchor is correctly oriented in the chaser. Keep constant tension in the pendant line to prevent the anchor from falling through the chaser and possibly turn.

Stop lowering when anchor hangs 10 to 15 meter above the bottom and advise rig. Rig now instructs AHV to pay out until pendant line is 1.4 to 1.5 times the water depth in shallow water (100m) and 1.3 to 1.4 times in deep- er water. AHV increases power till tension is again seen to rise at the rig, i.e. the load in the line is larger than the chain-soil friction (fig. 3-26).

Rig commences to pull in slowly. AHV further increases power until tension rises further at rig winch. At this moment rig orders AHV to lay the anchor. AHV immediately stops the propulsion and is consequently pulled back- wards. AHV pays out pendant and maintains paying out pendant after anchor has landed on the bottom till a wire length of 1.5 to 2 times the water depth is out. Enough slack wire must be paid out not to disturb the anchor during buoying off or waiting. Stay above or behind the anchor.

Stevpris installation

75

fig. 3-30

patience in very soft soils !

fig. 3-27

rig hauls AHV slacks

fig. 3-28

do not pull after landing !

fig. 3-29

wrong ! keep cable under tension Rig continues heaving the cable to a sufficient load, equal to the total

chain/soil friction plus 50 t to embed the anchor fully and create confidence in good setting.

This also gives stability to the anchor when the AHV strips the chaser back or buoys off the pendant. Now the AHV can retrieve the chaser and return to the rig. If circumstances allow, the rig can tension up to the full preten- sion load directly (fig. 3-27).

No extra pull after landing!

It is customary with older anchors such as Danforth, Moorfast, etc. to give another pull once the anchor is on bottom. Do not do this with Stevpris anchors. Once the anchor hits bottom, AHV should not pull again. Pendant line must remain slack, otherwise anchor could land upside down!

(fig. 3-28). Suggestion: pre-load the anchors to the maximum required

pretension load as soon as the chaser is 100 meter or more ahead of the anchor, i.e. do not wait. If anchor has not been laid correctly, a rerun can be made immediately.

Retrieving anchors

The chaser should be brought to the anchor with a pendant of at least the length of 1.5 to 2 times the water depth, measured from the stern roller. Chaser should hang freely down from the anchor line till the bottom is reached, i.e. slack in the pendant line. A too short pendant and/or too little tension in the cable results in a situation as sketched (fig. 3-29).

While chasing, the rig should maintain tension of 60 to 70% of the pre-load tension. No tension in pendant to ensure smooth passing over the chain. When chaser is pulled into contact with anchor shank, increase thrust and keep thrust while heaving, especially in rough water (fig. 3-30).

Stevpris installation

76

In document PORTADA POR DEFINIR. Guía Normativa (página 117-120)