other roads with double lane links or bridges needing urgent replacement. These bridges then were not being fully utilized due to minimal volume of traffic while in three instances, single lane bridges were constructed in double lane road links.

Records also revealed that apparently, the general criteria to give priority to bridges lying along higher category roads in terms of functional classification and with higher traffic volume was not observed.

Construction of a number of double lane bridges under the President’s Bridge Program was prioritized in places with basically no road links or with mere single lane roads over other roads with double lane links or bridges needing urgent replacement.

Out of 176 double lane bridges inspected by the team, 82 or 47% were constructed in sites without road links appropriate to the size of the bridge constructed while only single lane bridges were constructed in three (3) sites with double lane road links. The two lane bridges constructed were then not being fully utilized due to minimal volume of traffic while vehicle movements in the three (3) double lane roads with single lane bridges were likewise affected. While one of the selection criteria under the program is availability of funds for the construction of road links within two years upon bridge construction, compliance with this criterion was apparently not also monitored.

The two lane roads with installed single lane bridges follow:

Reg.

Name of Bridge/Location

I Nagsanga Bridge,

Pasuquin, Ilocos Norte

Reg.

Name of Bridge/Location

Cangmano I Bridge, Catigbian, Bohol

(implemented by DILG) VII

Cangmano II Bridge, Catigbian, Bohol

(implemented by DILG)

On the other hand, the installed double lane bridges without fully developed road links follow:

Region/

Province

No. of double lane bridges

inspected

No. of bridges w/o fully developed

road links Observations/Remarks

Region I 23 17

La Union 8 5

Sudipen Bridge, Sudipen

The bridge remained linked to a 4 meter PCCP road. Cupang Bridge in Sto. Tomas is also still linked to a 4m PCCP road.

Palintucang Bridge, Bauang

The bridge remained linked to a 3 meter road.

Other bridges still linked to a single lane road are Carmay Bridge and Pideg Bridge.

Pangasinan 6 4

Agdao Bridge, San Carlos City

This was completed on March 20, 2004 but remained connected to a pathway measuring 2m and being used as human trail only.

San Antonio Bridge, Sto.Tomas

This was completed on September 7, 2004 but being used only as human trail especially on rainy days.

Region/

Province

No. of double lane bridges

inspected

No. of bridges w/o fully developed

road links Observations/Remarks

Other bridges in Pangasinan under similar condition:

1. Gueteb Bridge - 4 m rough road- 2nd approach 2. Baug Bridge - 3 m rough road

Ilocos Sur 2 1

Labut Bridge, Masingal

The bridge remained linked to about 3m rough road.

Ilocos Norte 7 7

San Roque Bridge, Sarrat Francisco Bridge, Dingras Cabuayaan Bridge, Burgos

The bridge was completed on July 18, 2005.

Inspection conducted two years later revealed that it remained linked to a 3m earth road.

The bridge remained linked to 4 meter rough/gravel road.

Other bridges under similar condition follow:

1. Banban 2. San Juan 3. Sto. Santiago 4. Santiago-Barcelona

Bridge was completed on February 25, 2005. More than 2 years after construction, only pathway is still linking the bridge approach of approximately 50 meters.

Region VII 24 16

Cebu 8 5

Punod Bridge- Pinamungaan

Bridge remained linked to a single lane asphalted road.

Cambinocot Bridge

The bridge remained connected to a single lane rough road.

Region/

Province

No. of double lane bridges

inspected

No. of bridges w/o fully developed

road links Observations/Remarks Zaragoza Bridge, Alonguisan

This double lane bridge remained linked to a single lane asphalted road.

Tampaan Bridge, Alonguisan

This bridge is still linked to a single lane road.

Also still connected to a single lane road is Tulay 2 Bridge.

Bohol 8 7

Hin Ilaud Cantaongon Bridge

These double lane bridges remained linked to about 2 meters width human trail/ pathway.

Other bridges remaining linked to a single lane roads follow:

1. Lapacan Norte 2. Singculan 3. M. Cabigahan 4. Bangi

5. Lunoy-Consuhay

Negros Or. 8 4

Cambajao Bridge

This double lane bridge remained linked to a single lane rough road on one end and a foot trail on the other end.

Tampojangin Bridge, Amlan,

A double lane bridge remained linked to a concrete road on one end and rough road leading to a coconut plantation on the other end.

Other bridges under similar condition are: Iniwasan and Bago Bridges.

.

Region/

Province

No. of double lane bridges

inspected

No. of bridges w/o fully developed

road links Observations/Remarks Region XI 129 51

Davao del Sur 84 41 Ticulon Bridge, Malita

Still connected to a 3m rough road.

Glamang Bridge, Magsaysay,

Has no road opening after the 2nd bridge approach.

Tinongtungan Bridge, Bansalan Ondol Quick Bridge, Magsaysay,

Still connected to a road link of about 3m rough road.

The following 37 bridges located in Davao del Sur are also under similar conditions:

Name of Bridge Roadlink 1. Kalimango-Bansalana 3 m rough road 2. Anonang-Bansalan 3 m rough road 3. Tubod-Dolo Bansalan 4 m rough road 4. Upper-Dolo Bansalan 4 m rough road 5. Sibayan Bansalan 3 m rough road 6. Libertad ,Bansalan 4 m rough road 7. Sto.Nino, Bansalan 4 m rough road 8. Mabuhay, Bansalan 4 m rough road 9. Marber, Bansalan 4 m rough road 10. Tongkaling Bansalan 3 m rough road 11. Kanapulo, Magsaysay 4 m rough road 12. Ruelo-Palaton, Magsaysay 4 m rough road 13. Danol Creek, Magsaysay 4.10 m rough road 14. Gesim Creek, Magsaysay 4 m rough road 15. RIBAC Creek I, Magsaysay 3 m rough road 16. Relatados Creek, Magsaysay 3 m rough road 17. Manual , Kiblawan 3 m rough road 18. Latian, Kisulan 3.5 m rough road 19. Balasiao-Sitio Alah, Kiblawan 4 m rough road 20. Maraga A 4 m rough road 21. San Jose-Curbade 4 m rough road 22. Rizal, Bansalan 3 m rough road 23. Lanuro, Hagonoy 4 m rough road 24. Teresa, Malalag 3 m rough road 25. Dalagbong, Malalag 4 m rough road 26. Poblacion 3 m gravel road 27. Ibo, Malalag 4 m gravel road 28. Talogoy 3.2 m gravel road

Region/

Province

No. of double lane bridges

inspected

No. of bridges w/o fully developed

road links Observations/Remarks 29. Poblacion-Babac 3 m gravel road 30. Kamandag, Malalag 4 m gravel road 31. Bolton, Matanao 4 m gravel road 32. Savory, Bangkal 3 m gravel road 33. Mal,Matanao 3 m gravel road 34. Mabo, Matanao 3 m gravel road 35. Riverside, Digos City 4 m gravel road 36. Napan, Digos City 4 m gravel road 37. Igpit II 4 m gravel road

Davao del Norte

9 -

Davao Oriental 7 2

Mahayag Bridge

Still connected to about 3m rough road link.

Tigbauan Bridge, Caraga, Davao Oriental is also still linked to a 3m rough road.

Davao City 14 -

Compostela

Valley 15 8

Calamocan Bridge, New Bataan

Still connected to a single lane rough road.

Mahayag Bridge, Mawab

Still linked to about 3m rough road.

Other bridges in Compostela Valley under similar condition follow:

Name of Bridge Road link 1. Camculangan Bridge 3 m rough road 2. Concepcion Bridge 4 m rough road 3. Banglasan 3 m rough road 4. Aurora Siocon Bridge 3 m gravel road 5. Banay-banay Bridge 3.3 m gravel road 6. Torillo Bridge 4 m gravel road

Total 176 82

While the needs of these areas for bridges could not be discounted, such could be addressed by constructing only single lane bridges which was noted also to be part of the project. The Tulay ng Pangulo sa Countrywide covered construction of 80 single lane bridges. It was even noted that the road links in areas with installed single lane bridges were better off than the road links in some areas with installed two lane bridges as depicted on these pictures:

Region Bridge Name/Location Remarks

I Pindangan Bridge, Sison, Pangasinan

Single lane bridge installed along 5 m width approach and 3 m width concrete road links.

Balayang Bridge, Alaminos Pangasinan

Single lane bridge with concrete road links.

Sobol Bridge, San Fabian, Pangasinan

Single lane bridge with concrete road links.

Baucanag Bridge, Sison, Pangasinan

Single lane bridge with concrete road links.

Region Bridge Name/Location Remarks San Tiburcio Bridge,

Salcedo, Ilocos Sur

Single lane bridge installed along 3m width graveled road.

Bubuos Bridge, Solsona, Ilocos Norte

Single lane bridge with concrete road link.

VII Caaking Bridge, Bilar, Bohol

Single lane bridge installed along 2.5 m width graveled road.

Balugo Bridge, Valencia, Negros Oriental

Single lane bridge with asphalt road link.

It was further noted that while construction of a number of bridges were prioritized in areas without apparent immediate need, inspection disclosed that a number of bridges along developed barangay roads need immediate replacement and/or conversion to permanent ones. The principle that bridges for replacement or for conversion to permanent ones are considered more urgent and shall be given higher priority over bridges for repair/rehabilitation or for construction was not also

observed. The needs to replace the following bridges along local roads were already apparent:

Name of Bridge/Location

Type of

Bridge Physical Condition/Remarks Region XI

Banag-banag Bridge, Montevista, Compostela Valley

Bailey

Rusty railings and deteriorated planks and running boards. This old bridge is located along barangay road.

Pilian Bridge, Tubotubo, Monkayo, Compostela Valley

Rusty/Corroded steel railings and deteriorated running boards and planks. The structure is buttressed underneath by equally depreciated materials and a detour road was already constructed beside the bridge. The bridge is located along local/ barangay road.

Pangi Bridge, Pangi, Maco, Compostela Valley

Bailey

Still being used but with improvised steel pipe railings; portions of wooden running boards, floorings/planks and transoms are rotten. The bridge is located along barangay road.

Malangog Bridge, Sta. Maria, Davao del Sur

Still being used by motorcycles but four-wheel vehicles often uses a detour road beside the bridge for safety reasons.

Steel panels and transoms are corroded. Wooden running boards are rotten. This bridge is located along barangay road.

Name of Bridge/Location

Type of

Bridge Physical Condition/Remarks Barangay Marahan

Davao City

A detour road beside the bridge was constructed for heavy vehicles. Steel panels are heavily corroded and portions of flooring and running boards are rotten. This bridge is along a barangay road.

Salaysay Bridge, Davao City

Steel panels corroded and not aligned anymore. Portions of wooden flooring are rotten. This bridge is along a barangay road.

Aguibawa Bridge II, Compostela, Compostela Valley

Bailey

An old bailey bridge on a provincial road.

Region VII Ninbuyan Bridge Bohol

This bridge along provincial road is with signage of load limit of 2T and no entry for heavy vehicles/equipment. Steel panel not aligned and corroded.

Buko-Buko Anay Bridge, Danao,

Bohol

Timber

Timber bridge along provincial road with deteriorated running boards and planks.

Name of Bridge/Location

Type of

Bridge Physical Condition/Remarks Agahay Brige, Maribojoc,

Bohol

Timber bridge along local road with dilapidated railings and deteriorated running boards and planks.

There were even bridges along national roads which need immediate attention as illustrated below:

Name of Bridge/Location

Type of

Bridge Physical Condition/Remarks Region VII

Caimbang Bridge, San Isidro, Bohol

The steel panels of this bailey bridge along national road are heavily corroded and portions of flooring and running boards are decayed/rotten.

Tangbo Bailey Br., Samboan, 4th ED, Cebu

One lane bailey bridge with steel railings and wooden boards and planks along the national road.

Binalayan Bridge, Samboan, 4th ED, Cebu

Bailey

A one lane bailey bridge along national road with rusty steel railings that show signs of sagging. Wooden planks and running boards are dilapidated.

Name of Bridge/Location

Type of

Bridge Physical Condition/Remarks Vito Bridge,

Balamban, Cebu

Bailey

This bailey bridge along national road is not used. Temporary detour road beside the bridge was constructed.

Region XI

Balagonan Bridge, Carmen, Tagum

Bailey, temporary

Bailey bridge along national road with steel railings that are corroded. Its wooden planks and running boards have deteriorated.

Odiongan Bridge, Cateel, Davao Oriental

Old bailey bridge that manifests advanced signs of deterioration: rusty steel railings and rotten running boards and planks. The bridge is located along national road.

Cagdinaw Bridge, Cateel, Davao Oriental

Bailey

Bailey bridge along national road with steel railings that are corroded. Its wooden planks and running boards have deteriorated.

Moreover, the team observed that the bridge priority ranking or scoring tabulated in the Inventory of Local Bridges prepared by DILG was not totally followed in the selection of bridges for implementation. Bridges with lower scores were given priority in the construction as illustrated in the following cases:

Name of Bridge/Location

San Jose Bridge, Sudipen, La Union Concrete 30.48 Implemented under Tulay ng Pangulo sa Barangay

Antipangol Bridge San Carlos City, Pang. None 30.48 Implemented under Tulay ng Pangulo sa Barangay; double lane bridge linked to one lane rough road.

Balucanag Bridge, Sison, Pangasinan concrete 21.34 8

Garcia Bridge, Batac Ilocos Norte 26 Nanca Bridge, Batac Ilocos Norte 25 Nagrebcan Bridge, Batac, Ilocos Norte 25

12

Cabittaogan Bridge, San Juan, Ilocos Sur 22 Panpinitpit Bridge, Sto. Domingo, Ilocos Sur

Bailey

28 14

Pagsanaan Norte Bridge,Magsingal IlocosSur Timber 48 Pagsanaan Bridge, Magsingal Ilocos Sur 20 Alinaay Bridge, Cabugao, Ilocos Sur 120 Sabangan Bridge, Sinait, Ilocos Sur 45

12

Aringay Bridge III, Aringay, La Union 30 14 Las-ud SGO Sur Bridge, Caba, La Union 40

Laquicia Bridge, Caba, La Union 20

San Cornelio Bridge, Caba, La Union 20 Dimmsu Bridge, Rosario, La Union 55

12

Quiray # 3 Bridge, Aguilar, Pangasinan 25 Quiray # 4 Bridge, Aguilar, Pangasinan 34 Masagnim Bridge, Aguilar, Pangasinan

Bailey

36 Guibang Bridge, Dagupan City Timber 22 Namkwang Bridge,,Urdaneta, Pangasinan 24

14

Asinan Pantal Bridge, Bugallon, Pangasinan 45 Polong San Francisco Bridge, Bugallon,Pang. 60 Bobonot Bridge, Dasol, Pangasinan 27 Dorongan Bridge, Lingayen, Pangasinan

Bailey

150

Namolan Bridge, Lingayen 120

Madriaga Bridge, Manaoag, Pangasinan 40 Casnicolasan Bridge, Rosales, Pangasinan 45 Taloy Bridge, San Fabian, Pangasinan 65 Maninding-Vent. Bridge, Sta. Barbara, Pang.

Timber

58.5 12

Not implemented

Region VII

Cabatang Bridge, Alicia, Bohol Bailey 21.3 Cambao/La Hacienda Bridge, Alicia, Bohol Concrete 27.4

Implemented under Countrywide Bridge Project.

Songculan Bridge, Daois, Bohol Timber 39.6 6

Implemented under TPB.

The team also noted that in a number of instances, the constructed bridges in Regions I, VII and XI were not included in the masterplan/inventory list of local bridges.

Since selection criteria were intended to identify priority bridges, non compliance with these criteria would result in selection of bridges with practically no urgent needs of construction/replacement.