EH&S inspections do not in any way:

 excuse management and supervisory staff from their duty to personally carry out inspections of areas and personnel within their responsibility;

 excuse the personnel from their duty to ensure that the work area and equipment are in such condition that work can be executed safely.

In addition to the daily EH&S checks, formal EH&S inspection tours shall be made by a number of qualified individuals. The client (replace with client name) can participate on these EH&S inspection tours as required. For an inspection checklist see ref. 16.9.

(Check ref. no.) Check which tours will be applicable for this specific job.

Remove and/or add tours

 Jointly Company’s Safety Engineer and subcontractor’s EH&S Representative shall weekly conduct an EH&S inspection tour. (Check frequency.)

 Subcontractor's site manager and subcontractor's EH&S Representative shall weekly conduct an EH&S inspection tour. (Check frequency.) A report of these inspections shall be sent to Company's Safety Engineer and any relevant party involved.

 Company's Project Construction Manager and Company's EH&S Engineer shall weekly conduct an EH&S inspection tour. (Check frequency.)

For participation of Company operations staff (Superintendents and Construction Specialists) and Subcontractors' Superintendents and Supervisors, see ref 16.3.

For management safety inspections see ref. 16.3.

At work places with activities involving a high safety risk (see paragraph 8.1) (check paragraph no.) inspection tours shall be held more frequently.

Check for possible reference to specific regulations by authorities etc. and refer to those regulations

Company's Safety Engineer shall include a summary of the inspections in his weekly report (check frequency) to the Project Construction Manager as to the main improper EH&S conditions or acts observed during the preceding week and the corrections made or recommended. As required the subjects in this weekly report will be discussed in the Weekly Progress Meetings (see paragraph 5.3.3). (Check paragraph no.)

An EH&S monthly report (check frequency) with EH&S statistics is to be submitted by the Safety Engineer to the Project Construction Manager immediately following the

established cut-off date and is to be included in the Construction Monthly Progress Report (see also paragraph 13.3). (Check paragraph no.)

Copies of these monthly EH&S reports are distributed to the Company supervisory personnel, the subcontractor’s Site Managers and EH&S Representatives and shall be discussed in the monthly EH&S meetings.

6.2 Construction EH&S Audits

The Project Construction Manager is responsible for organizing site internal EH&S audits.

Planning, reporting and follow-up shall take place as described in reference 16.10. For conducting these audits reference 16.11 may be used as a starting point. (Check ref.

no’s)

The construction phase of the project will furthermore be subject to one or more audit(s) including safety aspects by the Company home office. These will also be conducted based on the references mentioned in the previous paragraph.

In all cases the selected subcontractor(s) is/are required to cooperate with Company personnel conducting these audits.

The audits include, but will not be limited to:

 availability of Company Construction EH&S Plan;

 status/availability of subcontractor(s)’ EH&S Plan(s).

 emergency and evacuation procedures;

 environmental controls;

 temporary facilities;

 induction, training and promotion;

 reports and records;

 EH&S inspections;

 findings and corrective actions;

 safety instructions.

6.3 Inspection by Authorities

Inspections, in particular of fire fighting equipment, cranes and lifting equipment, explosive and radioactive storage, canteens and change rooms, etc. may be required and carried out by relevant authorities.

The Safety Engineer shall comply with all reasonable requests for assistance or for information made by the representatives of such authorities.

Client’s (replace with client name) EH&S representative/Safety Department (check and correct when necessary) shall be informed by the project Construction Manager about any inspection by the authorities. A copy of the report from each inspection by the authorities shall be submitted to clients’ EH&S representative/Safety Department.

(Check and correct when necessary.)

6.4 Construction Equipment Safety Inspections

Check if items have to be added/removed

Each major item of construction equipment is subject to inspection by Company upon entering the site. Subject inspection will be a visual one with verification of the required documentation. The Company inspection in no way relieves the subcontractor from his responsibilities to only use equipment meeting the minimum criteria for safe application.

For checklists see ref. 16.12 and 16.13. (Check ref. no’s.)

The inspection is performed to establish whether the equipment is in safe working conditions and equipped with the necessary safety accessories and devices. An up-to-date test certificate, if applicable, must be available.

Rules applicable to equipment deployment and traffic control will be issued by Company to suit the conditions of the particular site and location.

Weekly the subcontractors shall present to Company a list showing number and type of all construction equipment utilized on site. (Check whether this is applicable for specific project.)

Subcontractor shall maintain an inspection schedule and record for his construction equipment. Inspection records are also required for all electrical/air driven (hand) tools.

Any further required periodical inspections are the responsibility of the subcontractor.

Company may participate in such inspections or conduct their own.

All equipment or tools not suitable or unsafe for use shall be promptly removed and replaced.

Upon Company’s request equipment operators and drivers are obliged to show their permits and/or licenses required for operating such equipment. Passenger automotive vehicles include all automobiles, pickup trucks, vans, buses and the like. The required safety equipment or functions and the operational standards shall be in accordance with the legal requirements of the country of operation as well as any client requirements for operating such vehicles in a running plant.

6.5 EH&S Non-Conformances

In the event that subcontractor has not taken any or all necessary EH&S precautions and/or does not meet relevant requirements, the work shall be immediately stopped by the subcontractor EH&S Representative, Company or client staff. Work shall not be resumed until all requirements and precautions have been met.

If there is repetition of an unsafe condition by subcontractor or if a serious unsafe situation arises or if subcontractor repeatedly does not take all necessary precautions with respect to EH&S, the Company Safety Engineer will issue an "EH&S

Non-Conformance" (ref. 16.14) (check ref. no.) on the subcontractor. The Non-Conformance will state by when and by whom the non-conformance must be rectified. Appropriate disciplinary action will be taken against the subcontractor and/or subcontractor's personnel if the non-conformance has not been rectified in the time given.

Repeated violation of the site EH&S requirements by any personnel can lead to permanent removal of such personnel from the site.