Solar 24.58 26.79 25.83 77.20

Non-Solar 344.15 375.03 361.64 1,080.82

Sub-Total 368.73 401.82 387.48 1,158.02

Total (A+B) 763.28 831.77 802.09 2,397.14

Captive Generation

Madhya Pradesh Electricity Regulatory Commission Page 50 2015-16. The Commission has admitted availability of 50 MU from Captive sources. Supply of power from captive power plants has been considered @ Rs. 2.45/ kWh for FY 2015-16. The rate provided in this order for purchase of power from captive power plants has been taken as per the last 12 months bills. The Commission directs Discoms that Purchase of power from captive power plants should be undertaken as per procedure prescribed in MPERC (Power purchase and other matters with respect to conventional fuel based Captive Power Plants) Regulations (revision – 1) 2009 dated 31st January, 2009.

Generating Station assigned to MPPMCL:

3.70The Commission has considered the rates from the relevant CERC, MPERC orders for new generating stations, wherever available. The Commission has considered the fixed charges and variable charges on case to case basis for the new generating stations where orders are not available.

3.71Following methodology has been adopted for considering the fixed and variable charges for the new stations which will become available to the state during FY 2015- 16 from the Central and State sector:

Table 37: Basis of Fixed and Variable charges for MPPMCL plants

Sr.

No. Generating Stations

Fixed Cost (Rs. Crore) Basis Energy Charges (Paisa/kWh) Basis 1 WR - SIPAT -I (3 Units) 298.25

CERC order dated: 22.08.2013, Petition No. 28/2011 from date of

COD to 31.03.2014 144

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

2

NTPC Korba – 7 87.21

CERC order dated: 9.04.2013, Petition No. 16/RP/2012 from date of

COD to 31.03.2014 102

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

3

Singaji Thermal Power

Stations Phase I -Unit-1 440.58

As per MPERC order dated 10.11.2014 in

Petition No. 05 of 2014 221

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

Singaji Thermal Power

Stations Phase I -Unit-2 420.80

As per MPERC order

dated 18.03.2015 221

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

4

Satpura Thermal Power

Stations Exten - Unit 10 256.15

MPERC order dated 8.10.2013 in Petition No.

11 of 2013 185

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

Satpura Thermal Power

Stations Exten - Unit 11 256.15

MPERC order dated 8.10.2013 in Petition No.

11 of 2013 186

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

5

NTPC Mauda TPS- Unit-1 99.85

CERC order dated: 02.07.2014 in Petition

Madhya Pradesh Electricity Regulatory Commission Page 51 Sr.

No. Generating Stations

Fixed Cost (Rs. Crore) Basis Energy Charges (Paisa/kWh) Basis NTPC Mauda TPS- Unit-2 83.75

CERC order dated: 02.07.2014 in Petition

No. 69/GT/2013 0 Being backed down

6

Vindhyachal Mega Project,

Stage 4-Unit-1 140.88

CERC order dated 23.06.2014 in Petition

No. 70/GT/2013 161

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

Vindhyachal Mega Project,

Stage 4-Unit-2 135.26

CERC order dated 23.06.2014 in Petition

No. 70/GT/2013 161

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

7

DVC Durgapur Steel TPS-

Unit-1 61.51

As per actual bills submitted by the petitioners from Oct.

2013 to Sept. 2014 236

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

DVC Durgapur Steel TPS-

Unit-2 61.51

As per actual bills submitted by the petitioners from Oct.

2013 to Sept. 2014 236

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

8

UMPP Sasan, Sidhi Unit-1 31.63 As per quoted Tariff 115 As per quoted Tariff

UMPP Sasan, Sidhi Unit-2 31.76 As per quoted Tariff 115 As per quoted Tariff

UMPP Sasan, Sidhi Unit

3& 4 63.40 As per quoted Tariff 115 As per quoted Tariff

UMPP Sasan, Sidhi Unit

5&6 63.40 As per quoted Tariff 115 As per quoted Tariff

9

Jaypee Bina Power, Sagar

Unit-1 246.61

MPERC order dated 26.11.2014 in Petition

No. 40 of 2012 265

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

Jaypee Bina Power, Sagar

Unit-2 246.61

MPERC order dated 26.11.2014 in Petition

No. 40 of 2012 265

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

10

Jaiprakash Power, Nigri-

Unit-1 313.17

MPERC order dated 26.09.2014 in Petition

No. 03 of 2014 160

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

Jaiprakash Power, Nigri-

Unit-2 313.17

MPERC order dated 26.09.2014 in Petition

No. 03 of 2014 160

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

11

WR-MB Power, Annupur,

Unit 1 188.44 As per Amarkantak Ext. 138 As per the per unit rate of Amarkantak Ext. WR-MB Power, Annupur,

Unit 2 50.63 As per Amarkantak Ext. 138 As per the per unit rate of Amarkantak Ext.

12 BLA Power, Narsinghpur-

Unit-1 19.16

Fixed cost-As MPERC

order dated 24 July, 2012 242

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

Madhya Pradesh Electricity Regulatory Commission Page 52 Sr.

No. Generating Stations

Fixed Cost (Rs. Crore) Basis Energy Charges (Paisa/kWh) Basis

BLA Power, Narsinghpur-

Unit-2 15.96

Fixed cost-As MPERC

order dated 24 July, 2012 242

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

13

M/s Jhabua Power, Seoni 102.38 As per Amarkantak Ext. 138

As per the per unit rate of Amarkantak Ext.

14

Lanco TPS, Amarkantak 323.14

As per actual Power Purchase bills from Oct.,

2013 to Sept., 2014 180

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

15

Torrent Power GPP 42.49

As per CERC tariff order

dated 29 May, 2013 662

As per actual bills submitted by the petitioners from Feb. 2014 to Jan. 2015

16 Renewable Energy Solar 413.30 As filed 0

17 Renewable Energy Non Solar 825.81 As filed 0

SUB TOTAL 5,632.97

3.72Fixed and Variable rates for some of the above mentioned generating stations are considered provisionally for billing purpose as the tariff orders for the Generating Station of the appropriate Regulatory Commissions are not yet available. After issuance of the relevant tariff order of the generating station by the appropriate Commission, the tariff admitted in that order will be considered applicable. Difference in the cost provisionally allowed in this order and actual cost will be considered in the true-up of FY 2015-16 or allowed to be recovered through the FCA in case of variable charges. 3.73The petitioners have filed separately a proposal of recovery of FCA with effect from

1.4.2015 on the basis of variation in the variable rates of thermal generating stations for the period from November, 2014 to January, 2015. While working out variable charges in this tariff order, the Commission has considered the variable rates based on information filed by the petitioners for the period February, 2014 to January, 2015. Therefore, the separately filed FCA for the period November, 2014 to January, 2015 has not been considered.