• No se han encontrado resultados

ESTUDIO 4

In document CONSUMO DE COCAÍNA (página 141-177)

PARTE II –ESTUDIOS EMPÍRICOS

CAPÍTULO 8: ESTUDIO 4

I-495N (I495) from MM 48.4 to MM 49 All lanes open Utility/Permit Work 05:00 AM - 05:00 AM

03/29/2021 - 03/29/2021 We need to overlash fiber/cable on existing

poles that run over the innerloop and outerloop of 495 at exit 49 at Idylwood Road.

We will need all lanes closed and any open HOV lanes closed.

I-495N (Capital Bw) from MM 57.7 to MM 42.3

I-495S (Capital Bw) from MM 42.3 to MM 57.7

Inspection Mobile, alternating lane

closures

Mobile, alternating lane closures

08:00 AM - 05:00 PM 03/01/2021 - 03/31/2021 Short duration/mobile daytime left/right

shoulder operation (per VWAPM TTC-3.1) on I-495 Express Lanes NB&SB and associated ramps from approximately Maryland State Line and Springfield Interchange.

I-495N (Capital Bw) from MM 57.7 to MM 42.3

I-495S (Capital Bw) from MM 42.3 to MM 57.7

Inspection Mobile, alternating lane

closures

Mobile, alternating lane closures

08:00 AM - 05:00 PM 04/01/2021 - 04/30/2021 Short duration/mobile daytime left/right

shoulder operation (per VWAPM TTC-3.1) on I-495 Express Lanes NB&SB, I-495 mainline and associated ramps from Maryland state line to Springfield Interchange.

I-495N (I495) from MM 48 to MM 51 Both shoulders closed Highway Lighting Repairs Mobile workzone

09:00 AM - 03:00 PM 03/22/2021 - 04/30/2021

I-495N from MM 44 to MM 53

I-495S from MM 53 to MM 44

Other Maintenance Mobile, alternating lane

closures

Mobile, alternating lane closures

09:00 AM - 03:00 PM 03/22/2021 - 04/02/2021 Shoulder/Lane Maintenance

I-495N (I495) at MM 51 Left shoulder closed Highway Lighting Repairs 09:00 AM - 03:00 PM 03/15/2021 - 04/30/2021

I-495N (I495) from MM 47 to MM 55

I-495S (I495) from MM 55 to MM 47

Highway Lighting Repairs Both shoulders closed

Mobile workzone

Both shoulders closed Mobile workzone

09:00 AM - 03:00 PM 03/22/2021 - 04/30/2021

I-495N from MM 55 to MM 44

I-495S from MM 44 to MM 55

Other Maintenance Mobile, alternating lane

closures

Mobile, alternating lane closures

09:00 PM - 05:00 AM 03/21/2021 - 04/02/2021 Express Lanes

I-495N (Capital Bw) from MM 57.7 to MM 42.3

I-495S (Capital Bw) from MM 42.3 to MM 57.7

Inspection Mobile, alternating lane

closures

Mobile, alternating lane closures

09:00 PM - 05:00 AM 04/01/2021 - 04/30/2021

I-495N (Capital Bw) from MM 57.7 to MM 42.3

I-495S (Capital Bw) from MM 42.3 to MM 57.7

Inspection Mobile, alternating lane

closures

Mobile, alternating lane closures

09:00 PM - 05:00 AM 03/14/2021 - 03/31/2021

I-495N from MM 44 to MM 53

I-495S from MM 53 to MM 44

Other Maintenance Mobile, alternating lane

closures

Mobile, alternating lane closures

09:00 PM - 05:00 AM 03/21/2021 - 04/02/2021 Shoulder/Lane Maintenance

I-495S (I495) from MM 48.4 to MM 49 All lanes open Utility/Permit Work 12:00 AM - 05:00 AM

03/29/2021 - 03/29/2021 We need to overlash fiber/cable on existing

poles that run over the innerloop and outerloop of 495 at exit 49 at Idylwood Road.

We will need all lanes closed and any open HOV lanes closed.

I-495S (I495) from MM 48 to MM 51 Both shoulders closed Highway Lighting Repairs Mobile workzone

09:00 AM - 03:00 PM 03/22/2021 - 04/30/2021

I-495S (I495) from MM 53 to MM 54 Both shoulders closed Highway Lighting Repairs 09:00 AM - 03:00 PM 03/22/2021 - 04/30/2021

I-495S Ramp 58C (Ramp) from 495 express ln ramp to 95 south express lane

Pothole Patching Operations All lanes closed

Mobile workzone

09:00 PM - 09:00 AM 02/08/2021 - 05/08/2021

I-66

I-66E (Custis Memorial Pw) from MM 65.2 to MM 65.5 All lanes open Utility/Permit Work 07:00 AM - 07:00 PM

11/24/2020 - 05/31/2022 Dominion Energy Idylwood to Tysons

Project. Drilling under I-66. No lane closures.

I-66E (Interstate 66) from MM 67.9 to MM 74.7

I-66W (Interstate 66) from MM 74.7 to MM 67.9

Other Maintenance Both shoulders closed

Mobile workzone

Both shoulders closed Mobile workzone

09:00 AM - 03:30 PM 03/01/2021 - 03/31/2021

I-66E from MM 49 to MM 67.8

I-66W from MM 67.8 to MM 49

Other Maintenance Both shoulders closed

Mobile workzone

Both shoulders closed Mobile workzone

09:00 AM - 03:30 PM 03/01/2021 - 03/31/2021

I-66E from MM 36.8 to MM 48.9

I-66W from MM 48.9 to MM 36.8

Other Maintenance Both shoulders closed

Mobile workzone

Both shoulders closed Mobile workzone

09:00 AM - 03:30 PM 03/01/2021 - 03/31/2021

I-66E from MM 62.4 to MM 62.6 Left lane and left Other Construction shoulder closed

11:00 AM - 03:30 PM 03/21/2021 - 04/03/2021 Will be deploying manlift to as-built elevation

of pier beam seats and measuring bearing pad thickness

I-66E (Interstate 66) from MM 69.8 to MM 70.6 Right lane and right ITS Equipment Repairs shoulder closed

Mobile workzone

09:00 PM - 05:00 AM 03/28/2021 - 04/02/2021

I-66E (Interstate 66) at MM 74.4 Right shoulder closed ITS Equipment Repairs Mobile workzone

09:00 PM - 05:00 AM 03/28/2021 - 04/02/2021

I-66E (Interstate 66) from MM 67.9 to MM 68.3 Left lane and left ITS Equipment Repairs shoulder closed

Mobile workzone

09:00 PM - 05:00 AM 03/28/2021 - 04/02/2021

I-66E (Interstate 66) from MM 71.9 to MM 72 Right shoulder closed Other Traffic Engineering 09:30 PM - 05:00 AM

03/29/2021 - 04/09/2021 Updating LOGOs Signs for IDSP program,

scope of work consists of replacing LOGO plates. Structure will not be altered.

I-66E from MM 62 to MM 62.4 Road Widening Project

Activities Right 2 lanes and right

shoulder closed

10:00 PM - 05:00 AM 03/08/2021 - 04/10/2021 Two right lanes will be affected. Also the Exit

62 to Nutley St ramp will be affected as we re-stripe the gore and add a new decel lane.

I-66E Ramp 55A (Ramp) at the ramp to Rt. 7100 South (Fairfax County Parkway)

Environmental Assessment

Both shoulders closed 06:00 AM - 07:00 PM

03/29/2021 - 04/01/2021

I-66E Ramp 55B (Ramp) at the ramp to Rt. 7100 North (Fairfax County Parkway)

Environmental Assessment

Both shoulders closed 06:00 AM - 07:00 PM

03/29/2021 - 04/01/2021

I-66E Ramp 72A (Ramp) from the ramp to Rt. 29N/S (Lee Highway) to the ramp from I-66E

Utility/Permit Work

Right shoulder closed 09:00 AM - 04:00 PM

03/15/2021 - 05/24/2021 We are going to be doing a WGL

maintenance test station repair on the shoulder of the 66 exit ramp

I-66E Ramp 72A (Ramp) from the ramp to Rt. 29N/S (Lee Highway) to the ramp from I-66E

Other Traffic Engineering

Right shoulder closed 09:30 PM - 05:00 AM

03/29/2021 - 04/09/2021 Updating LOGOs Signs for IDSP program,

scope of work consists of replacing LOGO plates. Structure will not be altered.

I-66W (Custis Memorial Pw) from MM 62.6 to MM 62.4 Left lane and left Other Construction shoulder closed

09:00 AM - 02:00 PM 03/21/2021 - 04/03/2021 Will be deploying manlift to as-built

elevations of beam sets and measure bearing pad thickness

I-66W (Interstate 66) from MM 68.3 to MM 67.3 Left shoulder closed Highway Lighting Repairs Mobile workzone

09:00 AM - 03:00 PM 03/19/2021 - 04/02/2021

I-66W from MM 66.7 to MM 64.9 All lanes closed Super Load

Mobile workzone

09:30 AM - 02:30 PM 12/11/2020 - 12/31/2022

I-66W (Interstate 66) from MM 74.7 to MM 70.3 Right lane and right ITS Equipment Repairs shoulder closed

09:00 PM - 05:00 AM 03/28/2021 - 04/02/2021

I-66W from MM 68.2 to MM 66.9 Mobile, alternating lane Inspection closures

09:00 PM - 05:00 AM 03/31/2021 - 04/01/2021

I-66W from MM 68.2 to MM 66.9 Mobile, alternating lane Inspection closures

09:00 PM - 05:00 AM 03/31/2021 - 04/01/2021

I-66W (Interstate 66) from Beginning of tunnel to end of tunnel

Other Maintenance

All lanes open 10:00 PM - 06:00 AM

03/22/2021 - 03/27/2021 VDOT Tunnel Maintenance/Rehab (Tile

Work on tunnel wall) Nightly left shoulder closures starting Monday night at 10:00pm ending at Tuesday Morning 6:00am, to be repeated from 3/22/2021 to 3/27/2021.

I-66W (I66) from MM 57.9 to MM 57.2

I-66E (I66) from MM 57.2 to MM 57.9

Utility/Permit Work All lanes and both

shoulders closed Mobile workzone All lanes and right shoulder closed Mobile workzone

11:00 PM - 04:00 AM 03/30/2021 - 03/31/2021 Rolling Stops

VA-267W (Dulles Access Rd) from Ramp to the ramp to I-495N (Capital Beltway)

Guardrail All lanes and left

shoulder closed

09:30 AM - 03:30 PM 03/30/2021 - 03/30/2021

I-66 ITB

I-66E (I66) from MM 67 to MM 71.2

I-66W (I66) from MM 71.2 to MM 67

Road Widening Project Activities

Alternating lane closures

Alternating lane closures

07:00 AM - 04:00 PM 09/16/2020 - 06/30/2021 EB 10AM - 4PM & WB 7AM - 2PM

I-66E (Custis Memorial Pw) from MM 65 to MM 67 Road Widening Project

Activities Alternating lane

closures

10:00 AM - 04:00 PM 11/16/2020 - 06/30/2021

I-66E (Custis Memorial Pw) from MM 66 to MM 67 Road Widening Project

Activities Alternating lane

closures

09:30 PM - 05:00 AM 09/16/2020 - 06/30/2021

I-66E (I66) from MM 67 to MM 71.2 Road Widening Project

Activities Mobile, alternating lane

closures

09:30 PM - 05:00 AM 02/25/2019 - 06/30/2021

Rt. 6749E (Arlington County) (Williamsburg Blvd) from N Yucatan St to N Westmoreland St; Rt. 6780N/S (Arlington County)

Rt. 6749W (Arlington County) (Williamsburg Blvd) from N Westmoreland St; Rt. 6780N/S (Arlington County) to N Yucatan St

Road Widening Project Activities

Alternating lane closures

Alternating lane closures

09:00 AM - 03:30 PM 09/17/2020 - 06/30/2021

Rt. 6774E (Arlington County) (Fairfax Dr) from Little Falls Rd;

Rt. 6797E/W (Arlington County) to Lee Hwy; US-29S, VA-237P; VA-237W, US-29S

Road Widening Project Activities

Alternating lane closures

09:30 AM - 03:00 PM 09/18/2020 - 06/30/2021

US-29N from N Westmoreland St; Rt. 6798N/S (Arlington County) to Washington Blvd; Rt. 19E/W (Arlington County);

VA-237P;US-29/LEE HWY/WASHINGTON BLVD US-29S from Washington Blvd; Rt. 19E/W (Arlington

County); VA-237P;US-29/LEE HWY/WASHINGTON BLVD to N Westmoreland St; Rt. 6798N/S (Arlington County)

Roadway Improvements Alternating lane

closures

Alternating lane closures

09:30 AM - 03:00 PM 12/15/2020 - 06/30/2021

VA-7E (Leesburg) from Idylwood Rd to Dale Dr; Rt. 1128N/S (Fairfax County)

VA-7W (Leesburg) from Dale Dr; Rt. 1128N/S (Fairfax County) to Idylwood Rd

Road Widening Project Activities

Alternating lane closures

Alternating lane closures

09:30 AM - 03:00 PM 09/17/2020 - 06/30/2021

VA-7E (Leesburg) from the ramp to I-66E/W to Dale Dr; Rt.

1128N/S (Fairfax County)

VA-7W (Leesburg) from Dale Dr; Rt. 1128N/S (Fairfax County) to the ramp to I-66E/W

Bridge Widening Alternating lane

closures

Alternating lane closures

09:30 PM - 05:00 AM 10/30/2020 - 06/30/2021

I-95

I-95N (I95) at MM 136 Both shoulders closed Environmental Assessment 06:00 AM - 07:00 PM

03/29/2021 - 04/01/2021 from VA 8900 Centerport Parkway North to I

95 South

I-95N at MM 151 Right shoulder closed Highway Lighting Repairs 09:00 AM - 03:00 PM

03/17/2021 - 03/31/2021

I-95N at MM 151.8 Right shoulder closed Highway Lighting Repairs 09:00 AM - 03:00 PM

03/26/2021 - 04/09/2021

I-95N from MM 151 to MM 153

I-95S from MM 153 to MM 151

Bridge Inspection Work Alternating lane

closures

Alternating lane closures

09:30 AM - 03:00 PM 04/01/2021 - 04/01/2021

I-95N from MM 151 to MM 161.2

I-95S from MM 161.2 to MM 151

Highway Lighting Repairs Mobile, alternating lane

closures

Mobile, alternating lane closures

08:00 PM - 05:00 AM 02/22/2021 - 03/31/2021

I-95N from MM 151 to MM 153

I-95S from MM 153 to MM 151

Bridge Inspection Work Alternating lane

closures

Alternating lane closures

09:00 PM - 05:00 AM 03/30/2021 - 03/31/2021

I-95N (Capital Bw) from MM 172 to MM 174.2 Mobile, alternating lane Inspection closures

09:00 PM - 05:00 AM 03/28/2021 - 03/29/2021

I-95N Ramp 158A (I95 N Ex158a Of) at the ramp to Rt. 3000 East

Environmental Assessment

Both shoulders closed 06:00 AM - 07:00 PM

03/29/2021 - 04/01/2021

I-95N Ramp 160B (Int95 N Off R) at the ramp to Route 123 North

Environmental Assessment

Both shoulders closed 06:00 AM - 07:00 PM

03/29/2021 - 04/01/2021

I-95N Ramp 166B at the ramp to Fairfax County Parkway North

Environmental Assessment

Both shoulders closed 06:00 AM - 07:00 PM

03/29/2021 - 04/01/2021

I-95S at MM 136 Both shoulders closed Environmental Assessment 06:00 AM - 07:00 PM

03/29/2021 - 04/01/2021 From 8900 Centerport Parkway to I-95 South

I-95S from MM 170 to MM 148

I-95N from MM 148 to MM 170

Other Maintenance Mobile, alternating lane

closures

Mobile, alternating lane closures

09:00 AM - 03:00 PM 03/22/2021 - 04/03/2021 Shoulder/Lane Routine Maintenance

I-95S at MM 152 Right shoulder closed Highway Lighting Repairs 09:00 AM - 03:00 PM 03/15/2021 - 04/30/2021

I-95S from MM 152 to MM 156

I-95N from MM 156 to MM 152

Highway Lighting Repairs Mobile, alternating lane

closures

Mobile, alternating lane closures

09:00 AM - 03:00 PM 03/15/2021 - 04/16/2021

I-95S (I95) from MM 120 to MM 118 Left lane and left Guardrail shoulder closed

09:00 AM - 04:30 PM 04/01/2021 - 04/01/2021 Left lane closure to repair guardrail

damages.

I-95S (I95 Hwy) from MM 153 to MM 155 Mobile, alternating lane Highway Lighting Repairs closures

10:30 AM - 03:00 PM 03/15/2021 - 03/31/2021

I-95S (I95/I495) from MD LINE ON 95 South to I-295 South All lanes closed Super Load Mobile workzone

08:30 PM - 06:00 AM 03/29/2021 - 03/30/2021

I-95S from MM 170 to MM 148

I-95N from MM 148 to MM 170

Other Maintenance Mobile, alternating lane

closures

Mobile, alternating lane closures

09:00 PM - 05:00 AM 03/21/2021 - 04/03/2021 Shoulder/Lane Routine Maintenance

I-95S Ramp 160A (Int95 S Off R) at the ramp to Rt. 123 North

Environmental Assessment

Both shoulders closed 06:00 PM - 07:00 PM

03/29/2021 - 04/01/2021

In document CONSUMO DE COCAÍNA (página 141-177)

Documento similar