• No se han encontrado resultados

Eventos CAMACOES

In document Memoria Anual CAMACOES 2019 (página 36-46)

1. Once the initial crush for room and linen closet set-up is over in the Laundry Department: test upholstery, curtain and drapery material in Laundry for possible shrinkage. Launder bed skirts and day spreads

2. Implement linen and uniform exchange procedures and follow-up

3. Establish normal day-to-day operation with front office. Issue housekeeper‟s reports, stating actual status of all rooms, including, ready for sale, occupied, out of order. Follow-up discrepancy report systematically

4. Establish night cleaning crew and start normal operations

5. Check general storeroom daily regarding housekeeping supplies. Requisitions obtain and distribute same according to normal InterContinental Hotels Group standards 6. Procure a presentation pillow which the General Manager will use to present the gold

plated scissors (or whatever) to the dignitary who will cut the ribbon on Opening Day. Coordinate specifications with Public Relations staff

7. Obtain information on activities for Opening Day, which are different for each hotel opening. Involve as many supervisors as possible in planning. Precise written instructions should be given to all concerned as for most, it is there first opening

a. Banquets

b. Decoration of Food & Beverage outlets c. Flower arrangements and distribution d. Ribbon cutting ceremony.

e. Expected VIP guests and suite requirements f. Special room arrangements

g. Local honorary guests and requirements (hospitality room) h. Special room for press and media people

i. Get information on format of Opening Day activities 8. Prepare and install Opening Ribbon for rehearsal purposes 9. Issue complete set of uniforms to all employees

__________________________________________________________________________________________________________ ____

March 2005 89

APPENDIX A

RECOMMENDED LOCAL PURCHASE SHOPPING LIST

Check the Furniture, Fixture & Equipment Purchase listing as revised by the General Manager and/or Director/EAM Rooms. Some of the below items were intended to be purchased locally and some items may only be required on a temporary basis and only if the main supplies have not yet arrived. Purchase quantities based on local judgement.

Ashtrays Paper tissues

Bottle openers Pocket lamp (flashlight)

Box files Plastic bottles

Bowl brushes Plastic buckets

Bowl cleaner Plastic bags for trash

Brooms with handle, various Paper clips

Clip boards Rulers and erasers

Copper and brass polish Rubber gloves

Corn brooms with handle-household type Safety pins

Carbon paper Straight pins

Candle holders with candle sticks Squeegee

Dusting polish Scratch pads

Dust brooms with floor cloth Scotch tape

Elastic banding Stapler – staples

Flower vases of different sizes Scouring powder

First aid kit Scrapers and sponges

Hand sewing needles Small brooms and dustpans

Hand soap Scissors

Kitchen towelling Steel wool

Lemon – linseed oil Toilet plunger

Liquid heavy duty cleanser Threads of different colours

Log books Thinner

Matches Turpentine

Mosquito spray Tape measure

Manila folders Thumbtacks

Magic marker Utility brushes with and without handles

Mops with handles Vinegar

Pens and pencils Washing powder/soap

Padlocks Wooden coat hangers for uniform room and staff

__________________________________________________________________________________________________________ ____

March 2005 90

APPENDIX B

SUGGESTED CHECKLIST OF PRINTED FORMS

Guestroom Forms Maintained and Resupplied by Housekeeping Breakfast doorknob menus (security policy?)

Decals for guestrooms Directory of services Fire exit plans

Guestroom stationary and postcards Guestroom envelopes

Guest questionnaires

In-house telephone directory Inspection checklist

Laundry – valet lists Mini bar checks Memo pads

Room service menu Rate sheets

Shoe shine cloth Stickers for rooms

Safe deposit box notification Housekeeping forms

Authorization for removal of property Check room tickets

Construction work authorization Departmental planning chart Employee cardex

Food & Beverage linen exchange Housekeeper‟s report

Lost and found record

Laundry doorknob key sign-out

Miscellaneous charges for Front Office cashier Maintenance orders

Personnel progress report Purchase requisitions

Room attendants‟ daily work distribution Room linen exchange

Request for medical treatment Room cardex

Request for overtime Storeroom requisitions Time sheets

Uniform schedule Payroll amendment Personnel requisition Petty cash form

__________________________________________________________________________________________________________ ____

March 2005 91

APPENDIX C

PRE-OPENING FILING SYSTEM FOR HOUSEKEEPERS OFFICE Annual Budget

a. Financial Statement b. Expense reports

c. Furniture, Fixture & Equipment d. Five-year plan Cleaning Supplies Forms Front Office a. Recaps b. Forecasts Goals Program Guest Questionnaires Guest Supplies Housekeepers report

Inventories of operating equipment Inspection reports

Job descriptions Key recapitulation Linen: rooms

Linen: Food & Beverage Lost and found records Memos reviewed Memos issued Miscellaneous Meeting minutes

a. Department heads meeting b. Executive committee c. House tours

d. Opening festivities committee e. Safety committee

f. Small savings committee Purchasing

a. Purveyors

b. Importation‟s c. Local market

d. Outstanding purchase requisitions Engineering

a. Punch list

b. Maintenance orders

c. Construction work authorizations Personnel

a. Time sheets b. Annual leave

c. Employee disciplinary warnings Policies and Procedures

Storerooms

a. Requisitions b. Inventories Uniforms

__________________________________________________________________________________________________________ ____

March 2005 92

Colour schemes for guestrooms Contract cleaning

__________________________________________________________________________________________________________ ____

March 2005 93

APPENIX D:

PUNCH LIST: GUESTROOMS

Attached is a punch list check off form to be used for each guestroom (see Chapter 13). The form is simply a guide, and can be changed to accommodate local conditions or personal preference as to format.

A word of caution is in order. It is extremely important to be highly organized during the entire punch-listing program. A number of serious demands will be made on the Executive Housekeeper‟s time. The more organized the housekeeping department, the smoother will be the pre-opening procedure.

The Chief Engineer should make up a set of floor plans for each guestroom floor, for the housekeeping department, and these plans should be covered in clear plastic laminate to permit writing. The Executive Housekeeper should have these plans mounted on display. The plans can be used to keep track of the items which remain unfinished in each guestroom on each guest floor. A responsible housekeeping supervisor should be assigned to transfer the items from the detailed checklists to the floor plans, using whatever method is most logical and understandable (colour-coded dots, circles with numbers, etc.). This system is valuable only if it is maintained absolutely current, in which case, it will prove helpful for organizing work brigades to zip through a floor.