• No se han encontrado resultados

CAPÍTULO I – FUNDAMENTOS TEÓRICOS – METODOLÓGICO PARA LA ORGANIZACIÓN Y

1.4. E LEMENTOS QUE FORMAN PARTE DE LA MEJORA DE PROCESO

1.4.4. La gestión de la mejora de procesos

Provide well of 1.2 m dia for a depth of 10.0 m and divert the rainwater from the terrace into the well through rainwater down take pipes. Divert the rain water falling around the open space surrounding the building to the frontage where in a gutter is provided for a depth of 1.0 M and a width of 0.6 M with perforated slabs. The rain water collected in the gutter in front of the entrance is discharged into another recharge well of 1.2 M dia with 10.0 m. deep provided hereby through necessary piping arrangements.

1Notification No.. F-23 (107)-95-XXXII, dt. 7-4-2000 Gazette of 28-4-2000.

Appendix – O (See rule 16-A)

Certificate of information by the builder regarding proposed Structural Design to the appropriate Department related to construction of Building

( To be submitted along with appropriate building structure proposal) From

(Name and Address of Builder)

………..

……….

To,

(Name and Address of the appropriate Department related to construction of Building).

Sub:- Description of Work and Address

………...……….

…………...……….

………...……….

Dear Sir,

This is to certify that the Architectural work related to proposed construction of the Building mentioned above and submitted for approval is entrusted by me/us to Name of Architect

And that the work of the structural Engineering consultancy services Design for the proposed Construction of building mentioned above and submitted for approval is entrusted by me / us to

Name of the Structural Engineer Address

Dated ……….

Signature of the Builder

Name

Address

Appendix – O-1 (See rule 16-A)

Certificate : The following certificate is to be submitted along with the drawing of Building while submitting the plans for obtaining permission for construction of Building-

1. Certified that the building plans submitted for approval regarding permission for construction of Building satisfy the safety requirements as stipulated under rule 84 of Madhya Pradesh Bhumi Vikas Rules,1984(

including Annexure ‘A’ as amended from time to time) and the information given therein is factually correct to the best of our knowledge and understanding.

2. It is also certified that the structural design including safety from natural hazards based on soil conditions has been duly incorporated in the design of the building and these provisions shall be adhered to during the construction.

Signature of owner Signature of Signature of Engineer/

With date Architect Structural Engineer

with With date date (As defined in NBC

Of India)

Name in Block Letters Name in Block Name in Block

Letters

Address letters Address Address

Appendix – P (See rule 16-A)

Certificate by the Structural Engineer

Regarding the structural design information to the appropriate Department related to construction of Building

( To be submitted along with proposal for construction of Building) From

(Name and Address of Builder)

……….

……….

To,

(Name and Address of the appropriate Department related to construction of Building).

Subject:- Description of work and Address ……….

……….

……….

Dear Sir,

This is to certify that the work of Structural Engineer consultancy Services, Design for the construction of Building mentioned above and submitted for approval is entrusted by me/us by ………...……...……….and satisfies the requirements of Madhya Pradesh Bhumi Vikas Rules, 1984.

Name of the Builder

Signature of Structural

Engineer

Address of the Builder. Date:

Appendix – P-1 (See rule 16-A)

Certificate by the Architect to the appropriate Department related to construction of Building

regarding the Architectural Drawings.

From

(Name and Address of Builder)

……….

……….

To,

(Name and Address of the appropriate Department related to construction of Building).

Subject:- Description of work and Address

……….

……….

……….

Dear Sir,

This is to certify that the Architectural work of the proposed construction of Building mentioned above and submitted for approval is entrusted by me/us by Name of the Builder/Owner

Address of the Builder/Owner

This is the further certify that Building drawings prepared by me/us satisfies the requirements of Madhya Pradesh Bhumi Vikas Rules, 1984. Special Construction Features on Configuration of IS-4326-1993.

Signature of Architect

Date:

Appendix – P- 2 (See rule 16-A)

Format of providing Structural Engineering Design date for Reinforced Concrete Structure for attaching to first set of Structural drawings for a project.

Name of the Structural Engineer Registration No.

Address

Job Description Job Location

Name of the Owner/Client Address

Architectural Reference Drawings:

The design parameters given in this format are followed by me/us in preparing structural design and drawings for the job mentioned above.

IS Codes of Practice-

1. IS 456-2000 Indian Standard for Plain and Reinforced Concrete.

2. IS 875- 1978 Design Loads ( Other than Earthquake).

3. IS 1893-1984 Indian Standard for Earthquake Resistant Design of Structure.

Signature of Structural Engineer.

Appendix –P-3 (See Rule 16-A)

On completion of a building and before occupation the architect and the Structural Engineer will jointly inspect the building and send a report of completion of the building to the sanctioning authority stating that the work is done as per approved plans and design.

Certificate: The following certificate is to be submitted at the time of obtaining Completion Certificate from the sanctioning authority by the builder/owner:-

1. Certified that the building(s) has been constructed according to the Sanctioned Plan and Structural design (one set of Structural drawings as executed is enclosed) which incorporates the provisions of structural safety as specified in relevant prevailing IS Codes/Standard/Guidelines.

2. It is also certified that the construction has been done under our supervision and guidelines and adheres to the drawings submitted and the records of supervision have been maintained by us.

3. Any subsequent change in the drawings will be responsibility of the owner(s).

Signature of owner Signature of Signature of Engineer/

With date Architect Structural Engineer with

With date date (As defined in NBC

Of India)

Name in Block Letters Name in Block Name in Block Letters

Address letters Address

Address

Appendix –P-4 (See rule 16-A) Completion Certificate

The work is supervised by me during construction and it is certified that the work is completed as per approved plans.

Signature of Architect(s).

Appendix – P-5 (See rule 16-A) Completion Certificate

I / We have completed the work as per plans approved by Sanctioning Authority and as per design finalised by the Architect and Structural Engineer.

(Note .- Use form for submitting completion certificate )

Signature of Builder(s)

Appendix – P-6 (see rule 16-A)

I / We have supervised the work during construction and certify that the same is done as per design prepared by me / us.

Signature of Structural Engineer(s)

List of Amendments in Madhya Pradesh Bhoomi Vikas Rules-1984

S..

No.

Notification No.

& Date

Rule Subject Remarks

(1) (2) (3) (4) (5) 1. Approved by

Notification No.

3073/ 32/ 1/87 Dt. 10-8-87

2 clause (5) Authority having Jurisdiction

Substituted

2 clause (8) Building activities Substituted 7 sub-rule (1) Appointment of Building

officer

Substituted

13 Board of Appeal Substituted

15 Development/ building

permit issued prior to these rules.

1 Floor Mill Maximum power 7.5 K.W.

Definition of High rise building.

17(6) clause (ii) Regarding high rise building

S..

No.

Notification No.

& Date

Rule Subject Remarks

32 Omitted

42 Additional provisions for buildings other than residential buildings

Substituted

42 A Additional provisions for high-rise buildings.

96 Plinth construction check survey

Inserted

97 Issue of service

certificate.

Inserted

98 Completion certificate Inserted

3. F-11(1)/93

Re-erection of portion of building damaged by

Height of building Substituted

Rule 2 Clause (19)

Covered Area Substituted

Rule 2 clause (27-A)

Forest House Inserted

Rule 2 clause (29)

Floor Area Ratio Substituted

Rule 2 clause (33)

Group Housing Substituted

S..

No.

Notification No.

& Date

Rule Subject Remarks

Rule 16 The words "if any" Omitted Clause (b)(i) of

sub-rule (ii) of rule 17

Attested copy of No.

Objection Certificate

For permission for High rise buildings plans for permission of buildings. plans for permission for Residential buildings on

Floor Area Ratio Added

Note No.2 Additional FAR for redevelopment of Jhuggi-Jhopadi

Added

Note No.3 FAR provision of two servants quarters

Added

S..

No.

Notification No.

& Date

Rule Subject Remarks

Note No.4 FAR provision for flatted development

Added

Note No..5 FAR for development of Areas in old part of city

Added

5. Gazette Dt. 28-4-2000

Rule 2 (19) Covered Area Substituted

Clause (28-A) High-rise building Substituted Clause (29) Floor Area Ratio Substituted Rule 14 sub-rule

(1) Third proviso

Site clearance

committee's clearance

Substituted

Rule 23 Duration of sanction Substituted Rule 24 Deviation during

construction

Rule 42-A Additional provisions for buildings above 12.5 M height

Substituted

Rule 53 sub-rule (1)

Note (2) Proviso

Plot size for High rise building

Multi level basement Inserted

Rule 78 sub-rule (3)

Rain/roof water harvesting

Inserted.

Rule 80 Provision of lifts Substituted

S..

No.

Notification No.

& Date

Rule Subject Remarks

Rule 81 Parking space Substituted Appendix L-(A) Parking space Inserted Appendix N-1 Rainwater harvesting

through percolation pits

Inserted

Appendix N-2 Rain water harvesting through pebble bed.

Inserted.

Appendix N-3 Rainwater harvesting through service

Building permission for development

Rule 82-A Facilities for Physically handicapped persons

Inserted

9. Gazette Dt.6-6-2003

Rule 26 (2) (5) Qualification of Town Planner

Rule 17 (5) h Rainwater harvesting method

Inserted

12. Gazette Dt.8-9-2006

Rule 78 Rainwater harvesting method

Rule 14 (1) A High Rise Building Substituted

S..

No.

Notification No.

& Date

Rule Subject Remarks

15. Gazette Dt.17-8-2007

Rule 16-A Permission in

Earthquake prone area.

Inserted.

Appendix O, O-1, P to P-6

Rule 84. Structural Design. Substituted.

16. Gazete Dt. 5-9-2008.

Rule 53 (3)(iii) Petrol filling Station Substituted