After tongs are removed, assist in placing pipe spinner on upper drill collar connection.

Verify that pipe spinner control is in the back-out position and spin stand of drill collar out of connection in the rotary table.

Close pipe spinner jaws around upper drill collar connection.

When stand is completely spun out, release pipe spinner from stand of drill collars.

If required, assist in securing pipe spinner to A-leg or out of the way.

Short ropes can be used on handles.

Keep eye on Floor Hands to verify that no one is in harm's way.

SLOWLY operate control lever

until stand is rotating.

5

5

6

7

STAND CLEAR while Driller picks up on stand of drill

collars.

If applicable, operate air hoist using the "mule line" (operated off air hoist) to rack the stand of drill collars. If a mechanical assist ("Willy Winch") is used, rack the stand of drill collars with the assistance of the Floor Hands.

Operate air hoist while Floor Hands install lift sub into drill collar.

Avoid drilling fluids.

Keep feet clear of pin end of stand. Keep Drillers view unobstructed.

Watch Floor Hands signals for directions. BE AWARE of possible entanglement between air hoist line and other Top Drive lines. 8 1 1 2 3 4 5

Romfor International Ltd.

Motorman

STEP SUB

PROCEDURE

REMARKS

TOP DRIVE

DRILL COLLAR

T R I P OUT OF H O L E

3

STAND CLEAR while Driller latches elevators on lift sub.

Place rope on elevator latch handle (on first stand). Keep eye on traveling equipment while being lowered to latching position.

9

10 11

STAND CLEAR while tongs are placed on drill collar

and lift sub as Driller tightens connection.

LIFT SUB CONNECTION IS TIGHTENED

After the drill collar clamp is removed, assist in pulling slips using proper handles. Keep track of number of collars pulled through the rotary table.

For unlatching purposes of Derrickman.

Repeat Steps 2 through 13 for remaining drill collars.

END OF PROCEDURE

Minimum of two people to pull slips.

12

13

Romfor International Ltd.

TRIP OUT OF

HOLETRIP OUT OFHOLE

MotormanMotorman

PIPE SPINNER

DRILL PIPE

PIPE SPINNER

DRILL PIPE

PIPE SPINNER DRILL PIPE

Romfor International Ltd.

Motorman

STEP SUB

PROCEDURE

REMARKS

PIPE SPINNER

DRILL PIPE

T R I P OUT OF H O L E

1 0 1 1 2 2 3 4 5

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support. Review JSA on tripping out of the hole with drill pipe.

Discuss TOH procedures with Driller to include: - Prepares strapping tape if required.

- Verify motor and compound requirements.

- Cover all open holes prior to tripping (Mousehole, etc). - Verify required equipment is on the rig floor.

PREPARE FOR TRIP OUT OF HOLE

While Driller pulls Kelly out of hole wash down Kelly with the hose.

Upon the Driller's signal, assist in setting the slips. Set Slips, using proper lifting techniques.

Stand clear while tongs are being latched, connection is broken, and rotated out.

Lift subs, TIW valve, Cross-over subs, Inside BOP, drill collar clamps and wrench, paint stick, pipe jack. Proper wrench for valve.

Wrench should be designed to eliminate possibility of dropping it into hole.

6

3

STAND CLEAR while the Driller picks up on the Kelly.

SET BACK THE KELLY

Minimum of two people.

Hook up air hoist to Kelly pull-back line.

Engage the air hoist, pulling the Kelly back over the Kelly Shuck maintain the center position while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

Avoid drilling fluids.

Verify the pull-back line is properly secured to Kelly for pull-back.

Keep eye on floor hands to verify nobody is in harm's way.

STEP SUB

PROCEDURE

REMARKS

Motorman

PIPE SPINNER

DRILL PIPE

T R I P OUT OF H O L E

Romfor International Ltd.

2 After the Kelly is stabbed into the Kelly Shuck and

traveling equipment is stopped, slack-off on the air hoist allowing the pull-back cable to be untied from the Kelly.

Bring the Hoist chain down to the floor and tie out of the way of the traveling equipment.

After the pull back cable is tied to the elevators and the Back-up Hand unlatches the Hook from the swivel, slack-off the air hoist SLOWLY preventing the traveling equipment from swinging across the rig floor.

OR

When the elevators are in the proper position and stopped of any movement, slack-off the air hoist and tie out of the way of the traveling equipment.

If required, assist in preparing and dropping the survey equipment; assist Derrickman in the tie-off of swivel bail.

Keep eye on floor hands to verify nobody is in harm's way.

8

9

9

10

Assist in installing pipe wiper based on operat- ing procedures or hole conditions as directed

by the Driller.

READY FOR TRIP OUT OF HOLE

11

When the elevators are in the proper position, latch onto the tool joint in the rotary table.

Assist in turning the elevator to the proper trip out of the hole position.

Assist in pulling the slips using the proper handles.

On first stand, and upon Driller's signal, set Crown-O-Matic.

12

13

Keep eye on the traveling equipment as it is being lowered to the proper latching position.

Minimum of three people. Use proper lifting procedures. Keep track of the number of joints being pulled through the rotary table. As required, hose off mud from pipe.

14

1

Romfor International Ltd.

Motorman

STEP SUB

PROCEDURE

REMARKS

PIPE SPINNER

DRILL PIPE

T R I P OUT OF H O L E

3 Stand clear while tongs are being latched, connection

is broken.

With assistance place pipe spinner on stand for spin out using proper handles and close pipe spinner jaws. After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum two people to set slips.

15

16

17

Engage pipe spinner and rotate stand out.

After pipe stops rotating, disengage pipe spinner jaws and remove pipe spinner. Secure Pipe Spinners.

STAND CLEAR while the Driller picks up on the stand.

Short ropes can be used on handles.

Verify Floor Hands are in proper position before engaging pipe spinner.

Rack the stand into the proper position while assisted by the Floor Hand.

Write proper number on stand.

18

19

20

21

Avoid drilling fluids.

Make sure feet are clear of pin end of stand.

Repeat Steps 12 through 22 until reaching BHA. Upon reaching BHA, refer to TOH - DRILL COL- LARS WITH PIPE SPINNER.

END OF PROCEDURE

22

24 23

Romfor International Ltd.

TRIP OUT OF

HOLETRIP OUT OFHOLE

MotormanMotorman

PIPE SPINNER DRILL COLLAR

PIPE SPINNER

DRILL COLLAR

PIPE SPINNER

DRILL COLLAR

Romfor International Ltd.

Motorman

STEP SUB

PROCEDURE

REMARKS

PIPE SPINNER

DRILL COLLAR

T R I P OUT OF H O L E

1 0 1 1 2 2 3 4 5

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support. Review JSA on tripping out of the hole with drill collars.

Inspect Equipment:

Discuss TOH procedures with Driller to include:

- Prepares strapping tape if required. - Verify motor and compound requirements.

- Cover all open holes prior to tripping (Mousehole, etc). - Rope for unlatching elevators.

- Verify required equipment is on the rig floor. - Verify pipe spinners are in correct rotation and equipped with correct roller size.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED

WITH DRILL PIPE.

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

If necessary, assist installing drill collar clamp using proper handles.

STAND CLEAR while the Floor Hands place tongs on

drill collars and Driller breaks connection.

THE CONNECTION IS BROKEN

After tongs are removed, assist in placing pipe spinner on upper drill collar connection.

Lift subs, TIW valve, Cross-over subs, Inside BOP, paint stick, drill collar clamps and wrench. Proper wrench for valve.

TIW valve wrench should be designed to eliminate possibility of dropping it into hole.

Minimum of two people to set slips.

DO NOT use pipe wrench.

Make sure each clamp segment is aligned properly.

Close pipe spinner jaws around upper drill collar connection.

Verify that pipe spinner control is in the back-out position and spin stand of drill collars out of connection in the rotary table.

When stand is completely spun out, release pipe spinner from stand of drill collars.

Short ropes can be used on handles.

Keep eye on Floor Hands to verify that no one is in Harm's Way

SLOWLY operate control lever until stand is rotating.

6

7

STEP SUB

PROCEDURE

REMARKS

Motorman

PIPE SPINNER

DRILL COLLAR

T R I P OUT OF H O L E

Romfor International Ltd.

2 If required, assist in securing pipe spinner to A-leg or

out of the way.

STAND CLEAR while Driller picks up on stand of drill

collars.

If applicable, operate air hoist using the "mule line" (operated off air hoist) to rack the stand of drill collars. If a mechanical assist ("Willy Winch") is used, rack the stand of drill collars with the assistance of the Floor Hands.

Operate air hoist while Floor Hands install lift sub into drill collar.

When the elevators are stopped and in proper position, latch elevators around lift sub.

Keep eye on traveling equipment while being lowered to latching position.

Place rope on elevator latch handle (on first stand).

STAND CLEAR while tongs are placed on drill collar

and lift sub as Driller tightens connection.

Avoid drilling fluids.

Keep feet clear of pin end of stand. Keep Drillers view unobstructed.

Watch Floor Hands signals for directions.

9

10

11

12

LIFT SUB CONNECTION IS TIGHTENED

After the drill collar clamp is removed, assist in pulling slips using proper handles. Keep track of number of collars pulled through the rotary table.

Repeat Steps 2 through 17 for remaining drill collars.

For unlatching purposes of Derrickman.

Minimum of two people to pull slips. 13 END OF PROCEDURE 14 16 17 15 18

Romfor International Ltd.

TRIP OUT OF

HOLETRIP OUT OFHOLE

MotormanMotorman

SPINNING CHAIN DRILL PIPE

SPINNING CHAIN

DRILL PIPE

SPINNING CHAIN

DRILL PIPE

Romfor International Ltd.

Motorman

STEP SUB

PROCEDURE

REMARKS

SPINNING CHAIN

DRILL PIPE

T R I P OUT OF H O L E

0 1 1 2 2 3 4 5

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support Review JSA on tripping out of the hole drill pipe.

Discuss TOH procedures with Driller to include: - Prepares strapping tape if required.

- Verify motor and compound requirements.

- Cover all open holes prior to tripping (Mousehole, etc). - Verify required equipment is on the rig floor.

PREPARE FOR TRIP OUT OF HOLE

While Driller pulls Kelly out-of-hole, wash down Kelly with water hose.

Upon the Driller's signal, assist in setting the slips. Set Slips, using proper lifting techniques.

Stand clear while tongs are being latched, connection is broken, and rotated out.

Lift subs, TIW valve, Cross-over subs, Inside BOP, drill collar clamps and wrench, paint stick, pipe jack. Proper wrench for valve.

Wrench should be designed to eliminate possibility of dropping it into hole.

6

3

STAND CLEAR while the Driller picks up on the Kelly.

SET BACK THE KELLY

Minimum of two people.

Hook up air hoist to Kelly pull-back line.

Engage the air hoist, pulling the Kelly back over the Kelly Shuck maintain the center position while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

Avoid drilling fluids.

Verify the pull-back line is properly secured to Kelly for pull-back.

Keep eye on floor hands to verify nobody is in harm's way.

7

STEP SUB

PROCEDURE

REMARKS

Motorman

SPINNING CHAIN

DRILL PIPE

T R I P OUT OF H O L E

Romfor International Ltd.

2 After the Kelly is stabbed into the Kelly Shuck and

traveling equipment is stopped, slack-off on the air hoist allowing the pull-back cable to be un-tied from the Kelly.

Bring the Hoist chain down to the floor and tie out of the way of the traveling equipment.

After the pull back cable is tied to the elevators and the Back-up Hand unlatches the Hook from the swivel, slack-off the air hoist SLOWLY preventing the traveling equipment from swinging across the rig floor.

OR

When the elevators are in the proper position and stopped of any movement, slack-off the air hoist and tie out of the way of the traveling equipment.

If required, assist in preparing and dropping the survey equipment; assist Derrickman in the tie-off of swivel bail.

Keep eye on floor hands to verify nobody is in harm's way.

8

9

9

10

Assist in installing pipe wiper based on operat- ing procedures or hole conditions as directed

by the Driller.

READY FOR TRIP OUT OF HOLE

11

When the elevators are in the proper position, latch onto the tool joint in the rotary table.

Assist in turning the elevator to the proper trip out of the hole position.

Assist in pulling the slips using the proper handles.

On first stand, and upon Driller's signal, set Crown-O-Matic.

12

13

Keep eye on the traveling equipment as it is being lowered to the proper latching position.

Minimum of three people. Use proper lifting procedures. Keep track of the number of joints being pulled through the rotary table. As required, hose off mud from pipe.

14

1

Romfor International Ltd.

Motorman

STEP SUB

PROCEDURE

REMARKS

SPINNING CHAIN

DRILL PIPE

T R I P OUT OF H O L E

3

STAND CLEAR while tongs are being latched, connec-

tion is broken, and spun out with spinning chain.

STAND CLEAR while the Driller picks up on the stand.

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum two people to set slips.

15

16

17

Racking the stand into the proper position while assisted by the Floor Hand.

Write proper number on stand.

Repeat Steps 12 through 19 until reaching BHA.

Avoid drilling fluids.

Make sure feet are clear of pin end of stand.

Upon reaching BHA, refer to TOH - DRILL COL- LARS WITH SPINNING CHAIN.

END OF PROCEDURE

18

19 20 21

Romfor International Ltd.

TRIP OUT OF

HOLETRIP OUT OFHOLE

MotormanMotorman

SPINNING CHAIN DRILL COLLAR

SPINNING CHAIN

DRILL COLLAR

SPINNING CHAIN

DRILL COLLAR

Romfor International Ltd.

Motorman

STEP SUB

PROCEDURE

REMARKS

SPINNING CHAIN

DRILL COLLAR

T R I P OUT OF H O L E

1 0 1 1 2 2 3 4 5

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support. Review JSA on tripping out of the hole with drill collars.

Inspect Equipment:

Discuss TOH procedures with Driller to include:

- Prepares strapping tape if required. - Verify motor and compound requirements.

- Cover all open holes prior to tripping (Mousehole, etc). - Rope for unlatching elevators.

- Verify required equipment is on the rig floor.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED

WITH DRILL PIPE

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

If necessary, assist installing drill collar clamp using proper handles.

STAND CLEAR while the Floor Hands place tongs on

drill collars and Driller breaks connection.

THE CONNECTION IS BROKEN

STAND CLEAR while tongs are being latched,

connection is broken, and spun out with spinning chain.

Lift subs, TIW valve, Cross-over subs, Inside BOP, paint stick, drill collar clamps and wrench. Proper wrench for valve.

TIW valve wrench should be designed to eliminate possibility of dropping it into hole.

Minimum of two people to set slips.

DO NOT use pipe wrench.

Make sure each clamp segment is aligned properly.

STAND CLEAR while Driller picks up on stand of drill

collars.

If applicable, operate air hoist using the "mule line" (operated off air hoist) to rack the stand of drill collars. If a mechanical assist ("Willy Winch") is used, rack the stand of drill collars with the assistance of the Floor Hands.

Avoid drilling fluids.

Keep feet clear of pin end of stand. Keep Drillers view unobstructed.

6

STEP SUB

PROCEDURE

REMARKS

Motorman

SPINNING CHAIN

DRILL COLLAR

T R I P OUT OF H O L E

Romfor International Ltd.

2 Operate air hoist while Floor Hands install lift sub into

drill collar.

Keep eye on traveling equipment while being lowered to latching position.

When the elevators are stopped and in proper position, latch elevators around lift sub.

Place rope on elevator latch handle (on first stand), if required.

LIFT SUB CONNECTION IS TIGHTENED

STAND CLEAR while tongs are placed on drill collar

and lift-sub as Driller tightens connection.

Watch Floor Hands signals for directions.

For unlatching purposes of Derrickman.

Minimum of two people to pull slips. 8 9 10 11 12

13 After the drill collar clamp is removed, assist in pulling

slips using proper handles. Keep track of number of collars pulled through the rotary table.

Repeat Steps 2 through 13 for remaining drill collars.

END OF PROCEDURE

Romfor International Ltd.

TRIP OUT OF

HOLETRIP OUT OFHOLE

MotormanMotorman

R O T AR Y T ABLE DRILL PIPE

ROTARY TABLE

DRILL PIPE

ROTARY TABLE

DRILL PIPE

Romfor International Ltd.

Motorman

STEP SUB

PROCEDURE

REMARKS

ROTARY TABLE

DRILL PIPE

T R I P OUT OF H O L E

1 0 1 1 2 2 3 4 5

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support

Review JSA on tripping out of the hole with drill pipe. Discuss TOH procedures with Driller to include: - Prepares strapping tape if required.

- Verify motor and compound requirements.

- Cover all open holes prior to tripping (Mousehole, etc). - Verify required equipment is on the rig floor.

PREPARE FOR TRIP OUT OF HOLE

While Driller pulls Kelly out of hole wash down Kelly with the water hose.

Upon the Driller's signal, assist in setting the slips. Set Slips, using proper lifting techniques.

Stand clear while tongs are being latched, connection is broken, and rotated out.

Lift subs, TIW valve, Cross-over subs, Inside BOP, drill collar clamps and wrench, paint stick, pipe jack. Proper wrench for valve.

Wrench should be designed to eliminate possibility of dropping it into hole.

6

3

STAND CLEAR while the Driller picks up on the Kelly.

SET BACK THE KELLY

Minimum of two people.

Hook up air hoist to Kelly pull-back line.

Engage the air hoist, pulling the Kelly back over the Kelly Shuck maintain the center position while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

Avoid drilling fluids.

Verify the pull-back line is properly secured to Kelly for pull-back.

Keep eye on floor hands to verify nobody is in harm's way.

STEP SUB

PROCEDURE

REMARKS

Motorman

ROTARY TABLE

DRILL PIPE

T R I P OUT OF H O L E

Romfor International Ltd.

2 After the Kelly is stabbed into the Kelly Shuck and

traveling equipment is stopped, slack-off on the air hoist allowing the pull-back cable to be untied from the Kelly.

Bring the Hoist chain down to the floor and tie out of the way of the traveling equipment.

After the pull back cable is tied to the elevators and the Back-up Hand unlatches the Hook from the swivel, slack-off the air hoist SLOWLY preventing the traveling equipment from swinging across the rig floor.

OR

When the elevators are in the proper position and stopped of any movement, slack-off the air hoist and tie out of the way of the traveling equipment.

If required, assist in preparing and dropping the survey