TransGrid’s strategies, policies and procedures are based on the principles of risk management, and bush fire risk management forms an integral part of TransGrid’s overall asset management system. These systems have been developed over many years, and changes and improvements have been made taking into account system performance during bush fires.
These systems have proven effective in previous major bush fire events, such as those in 2001 – 2003. In the period since then, there have been no major bush fire events that have impacted on TransGrid’s transmission lines or infrastructure.
In the past five years, there have been two incidences of initiation of localised fires as a result of TransGrid lines. One incident was the result of externally caused damage to one line between Armidale and Coffs Harbour where the conductors were severed by a third party and fell to the ground, starting a minor fire where the conductors were in contact with the ground. The other incident was a small grass fire initiated by a fallen transmission line conductor due to failure of a line fitting on the Upper Tumut to Canberra transmission line. This fire self extinguished and was limited to the immediate area of the transmission line easement.
TransGrid reviews its processes and the performance of the network for bush fire emergencies. These reviews continue to find that the operating protocols are effective, the network performs very reliably, and communications protocols with emergency services organisations are effective.
The policies, procedures and work instructions required for the implementation of the Bush Fire Risk Management plan are distributed to relevant staff via TransGrid’s intranet.
2. Objectives
This Chapter is intended to demonstrate the responsible management of TransGrid’s network assets in relation to bush fire risk and meets the requirements of clause 12 (1) of the Electricity Supply (Safety and Network Management) Regulation 2008 – Objectives of a Bush Fire Risk Management Plan.
The objectives required by the Regulation [in italics below] have been expanded to better represent TransGrid’s existing asset management policies and standards:
a) To ensure public safety:
i. To proactively manage public, employee and contractor safety
ii. To protect the environment from harm
b) To establish standards that must be observed when electricity lines operate near vegetation:
i. To establish design and maintenance standards that ensure bush fires are not initiated due to the normal operation of transmission lines
c) To reduce interruptions to electricity supply that are related to vegetation:
i. Minimise the likelihood of interruption of the electricity supply due to faults on the network as a result of vegetation approaching too close to transmission lines ii. To minimise interruptions to electricity supply as a result
of bush fire initiated outages of the network
d) To minimise the possibility of fire ignition by electricity lines:
i. Minimise the likelihood that bush fires initiated by the operation, mal–operation or failure of transmission lines or electricity substation plant associated with transmission lines ii. To minimise the likelihood of fire ignition by electricity
lines under lightning induced fault conditions, or severe storm events
Chapter 4
3. Strategies for Bush Fire Risk Management
3.1 General
TransGrid’s transmission line assets traverse the State and are generally located in rural and semi–rural areas. All of these areas have periods of high fire danger during the year and many of the transmission line corridors in these areas have sections of dense vegetation at risk of bush fire. TransGrid’s risk approach to asset management assumes that every transmission line has the potential to be impacted by fire, or to initiate fire, including bush fire.
TransGrid is required to protect the environment by conducting its operations in compliance with the principles of ecologically sustainable development, and to operate efficient, safe and reliable facilities for the transmission of electricity. The asset management and operational strategies therefore encompass all these issues including bush fire risk management.
3.2 Specific Strategies
The following strategies are the elements of TransGrid’s asset management and operational strategies specific to bush fire risk management. These elements include policies, standards, processes and procedures that together meet the objectives of this plan that were outlined in section 2.
a) To identify:
>
>Bush fire prone areas within the TransGrid supply area
>
>Network assets capable of initiating bush fires
>
>A system to ensure that this information is kept up to date
Transmission Lines
TransGrid’s risk approach to asset management is to minimise the likelihood that an asset will initiate a fire, irrespective of the location of that asset. Each line’s maintenance frequencies are determined taking into account the following factors:
>
>Vegetation density and growth patterns and associated bush fire initiation risks.
>
>Condition of the line.
>
>Public safety and easement encroachment considerations.
>>Local environmental conditions e.g. high corrosion or high termite activity areas.
The allocated maintenance frequencies are reviewed annually.
The schedule of lines and their maintenance frequencies are listed in the Transmission Line Maintenance Policy.
Applicable Asset Management Standards:
>
>Transmission Line Maintenance Policy – GM AS L1 001
Protection Equipment
Protection equipment is provided to detect electrical faults on overhead lines and/or power system abnormalities so as to mitigate the undesirable effects of such faults or abnormalities by the timely and correct operation of these devices.
This equipment will operate to de–energise transmission lines when flame or dense smoke reaches the HV conductors and causes an electrical arc. It is essential that this equipment operates correctly to ensure minimal system disturbance and supply interruption.
Protection equipment forms a system made up of relays that detect the fault and circuit breakers that electrically isolate the fault by de–energising the line. The frequency of maintenance of protection equipment is governed by TransGrid’s Protection Maintenance Policy. This standard also specifies in service auto–reclose checks that verify the complete protection scheme including intertrips and the mechanical operation of the circuit breakers.
The frequency of maintenance of circuit breakers is governed by TransGrid’s Substation Maintenance Policy.
Applicable Asset Management Standards:
>
>Protection Maintenance Policy – GM AS P1 001
>
>Substation Maintenance Policy – GM AS S1 001 Substations
TransGrid’s approach to the management of its substation assets takes into consideration:
>>The risk that a fire may be initiated by an ignition source from within a substation.
>
>The risk to equipment that may be posed by a fire external to a substation.
The activities required to eliminate these risks are set out in the Substation Maintenance Policy and the Fire Protection Manual Operations and Maintenance and include:
>
>Routine inspection of fire fighting equipment
>
>Routine inspection of transformer fire protection systems
>>Routine inspection of control room fire protection systems
>
>Routine inspection of switchyards and inspection of oil containment systems
>
>Grass cutting and weed control on the substation site
>
>Routine inspection for any rubbish that may present a potential fire hazard, clean up and disposal of rubbish
>
>Routine inspection of perimeter firebreaks and rectification of any perimeter bush fire hazards
>
>Routine inspection of control room gutters and removal of any combustible material
>
>Control of vegetation and weeds within the switchyard
>
>Removal of grass and or weeds near cable entries Applicable Asset Management Standards:
>
>Substation Maintenance Policy – GM AS S1 001
>
>Fire Protection Manual Operations & Maintenance – GD HS G2 001
Chapter 4
Radio Repeater Sites
The Telecommunication Maintenance Policy covers property maintenance and includes all cleaning, mowing, clearing, internal or external building remediation work and general repairs to:
>
>Communication rooms
>
>Radio repeater buildings
>
This maintenance is performed to ensure Telecommunication Assets are adequately protected from deterioration, the effects of weather, vandalism or bush fire.
Applicable Asset Management Standards:
>
>Telecommunication Maintenance Policy – GM AS C1 001
b) To ensure that the identified network assets located in bush fire prone areas are inspected, tested and maintained in accordance with a suitable maintenance schedule.
The inspection and maintenance frequencies for all lines and protection equipment are established in accordance with the maintenance policies [(a) above] and are scheduled in TransGrid’s ERP system, Ellipse. Inspection and maintenance includes testing where required.
The maintenance achievement and any variances from targets are reviewed each month and corrective action initiated if required.
Technical Performance Assessments (TPAs) are carried out annually in each of TransGrid’s three geographically based maintenance regions to ensure that maintenance is being carried out in accordance with Asset Management Standards.
Applicable Asset Management Standards:
>
>Network Asset Management – GD AS G2 003
>
>Technical Performance Assessment Process – GM AS G2 005
TransGrid has established maintenance practices that ensure adequate conductor to vegetation clearances are maintained, to minimise the likelihood of bush fire initiation due to arcing.
These standards provide sufficient clearances to prevent flashover under all environmental conditions and under all line loadings.
TransGrid has commenced a strategy to transition towards a routine maintenance regime for its easements based upon a return frequency governed by known vegetation issues and growth patterns. Annual aerial inspections of all lines combined with routine ground inspections provide regular checks for any defect vegetation requiring action outside the routine maintenance program. The aim is to remove all tall growing species whose mature height is expected to impact on safe and reliable clearance to the high voltage conductors.
Applicable Asset Management Standards:
>
>Transmission Line Maintenance Policy – GM AS L1 001
>
>Easements and Access Track Maintenance Policy – GM AS L1 002
>
>Asset Management Strategy –Transmission Line Easements – GM AS L5 002