started on 01/02/16
TG & Condenser: Civil work commenced
on 18/06/15. Condenser erection started on
20/07/16 & TG erection started on
11/08/16.
BOPs
Chimney: Awarded to LITL, Gurgaon.
Chimney raft casting commenced on
22/07/2015. Shell concreting work started
on 29/02/16, Shell casting completed in
3/2/16.
CHP: Awarded to M/s. FL SMIDTH (P)
Ltd. Chennai on 23/04/15. 70:30
Imported:
Domestic Coal. The soil
investigation
work
commenced
on
01/08/2015.
NOC/ROW
(Statutory
clearance) approval has been obtained
from PWD for routing ECHS from North
Chennai to project site through Ennore
Creek. The CE / PWD recommended the
proposal for the waiver of track rent to
Government on 18/11/2015 and Go TN has
not considered the case. LITL remitted the
Lease rent & refundable caution deposit to
PWD on 26/11/15.
CW System: Awarded to Kirloskar
Brothers Ltd and Sea water intake &
outfall system-off shore to M/s Coastal
Marine construction and Engineering Ltd,
Mumbai on 07/09/15. Intake pump house
earth excavation under progress. The earth
work excavation in cooling water intake
pump
house
was
commenced
on
07/09/2015 and in progress. LITL
committed to complete the permanent
marking along the route by 31/12/15.
Obtaining
approval
from
various
departments is a time consuming process
hence M/s LITL was requested to arrange
statutory
clearance
from
Railways,
Highways, Chennai Corporation, TNHB
etc., as early as possible.
NDCT: Awarded to M/s Hamon Thermal
Europe S.A on 05/05/15. All the 768 piles
casting completed on 08/02/16. The earth
work excavation for pile cap commenced
on
15/10/2015
and
pile
chipping
commenced on 16/12/15. Basin piling
work under progress.
Switchyard: Switchyard and related
electrical systems are yet to be awarded.
Original /Latest Cost
(03/2016)
:Rs 4956.00 / 5421.38 Crores
Expenditure during 2014-15 Expenditure during 2015-16 Expenditure during 2016-17 Expenditure during 2017-18 :Rs. 239.70 Crores :Rs. 2.8891 Crores :Rs. 86.5609 Crores : Rs.462.250 CroresTotal Expenditure (up to 12/2017) :Rs. 791.40 Crores Approval date:
Zero date: : 14/07/2014
Financial closure
Main Plant Order : 30/05/2014 (EPC) on M/s LANCO and lanco in turn awarded the BTG to Dong Fang electric corporation, China on 18/02/15. EPC cost Rs.3921.55crs. (revised)
BOP Package
Type of fuel : COAL (70:30 Imported: Domestic Coal)
PPA PPA does not arise as the entire power is to be utilized by TANGEDCO.
Power Evacuation system Regarding Power Evacuation system is under TANRANSCO scope.
Letter of Acceptance for Main Plant Order (EPC) issued to M/s LANCO on 05/14
(27/02/14 asper lr dt 22/12/16). LANCO in turn placed order on Dong Fang Electric Corporation., China on 18/02/15.
MO E&F Clearances obtained on 18/09/2014. SPCB clearance obtained on 18/02/13.
Civil Aviation: clearance obtained on 16/05/2008
Water allocation: Sea water is available near the project. Cooling water consumption to be drawn from Sea is 1,33,896 m3/day.
Corporate Insolvency & Bankruptcy Process (CIRP) initiated against LITL(the EPC Contractor) by IDBI Bank from 07.08.2017 and interim resolution professional appointed on 10.08.2017 and hence the project has been stalled rom 07.08.2017. The CIRP process extended up to 04.05.2018.
C ritical issues Corporate Insolvency & Bankruptcy Process (CIRP) initiated against LITL(the EPC Contractor) by IDBI Bank from 07.08.2017 and interim resolution professional appointed on 10.08.2017 and hence the project has been stalled rom 07.08.2017.
Sl. No.
Proje ct De tails Unit No.
C apa- city (MW)
C ommissioning Sche dule
Broad Status O riginal Actual(A)/ As Expe cte d Syn. C omm C O D Syn. C omm Trial -run C O D Private Se ctor 5 TuticorinTPP S t-IV / (M/s S EPC Power Pvt. Ltd.) Distt. Thoothukudi, Tamil Nadu.
1 525 07/18
09/18 10/18 03/21 03/21 Boiler: Boiler civil work started on 15/12/15 & erection started on 15/12/16. Boiler Drum lifted
on 13.8.17. Boiler hydro Test (non drainable) completed on 12.03.2020. Boiler light up on 20.10.2020.
TG: civil work started on 01/06/016. TG erection started on 8.9.17. TG Box up done on 05.01.2021.
BOPs:
CHP, AHP, CT, Chimney, PT and DM Plant, CW system, Fuel oil system and all other systems related to power evacuation, switchyard including C&I, Fire protection system, air- conditioning & ventilation etc. are all awarded to M /s M EIL on 18/01/14.
CHP: Civil foundation work is nearing completion. M echanical structural fabrication & erection under progress. M echanical work 99% has been Completed
AHP: Civil foundation work is in progress. M echanical structural fabrication erection under progress.
Cooling Tower: Erection works completed. Testing under progress.
Chimney: M/s MEIL awarded the chimney works to M /s Paharpur. Foundation works completed. Shell concreting completed up to 275 m. Finishing work under progress.
PT Plant: Civil works completed, Equipment erection and commissioning by M /s Tecton under progress. 97% work has been completed. DM Plant: Civil works are nearing completion.
Equipements erection under progress.
Fire Perotection System: Work under progress. Fuel Oil System : Civil works underway. CW System: 98% works has been completed. Switchyard: Erection works completed.
Commissioning under progress.
LT/HT S witch-gear : Erection & commissioning completed.
Original /Latest Cost : Rs. 3514.00 / Rs. 3514.00 Crores Expenditure up to 2015-16
Expenditure during 2016-17 Expenditure during 2017-18 Expenditure during 2018-19 Expenditure during 2019-20 & 20-21
:: Rs. 480.79 Crores : Rs. 248.70 Crores : Rs. 822.94 Crores : Rs. 508.91 Crores
: Rs. 1460.63Crores (upto 31.01.2021)
Total Expenditure (up to 01/2021) :Rs. 3521.97 Crores Ze ro date : 30/10/2015
Main Plant Order : Awarded on EPC basis to M/s MEGHA Engg. and Infrastructures Ltd. (“MEIL”) on 18/01/14. M/s MEIL in turn awarded the BT G package to M/s BHEL on 30/10/2015.
Type of fue l & FSA Imported Coal firmed up and agreement with the coal
supplier was approved by Hon’ble TNERC on 10.01.2020.
PPA :PPA signed with T ANGEDCO and approved by T NERC
Powe r Evacuation system For power evacuation 2x400 KV line has been
approved by CEA and is to be implemented by T ANGEDCO/ T ANTRANSCO.
MOE&F Clearance : Obtained. Extended up to 02.11.2020. Since all construction works (Civil & M echanical) are completed within the month of September 20, thereafter consent to operate (CTO) was obtained and therefore EC valid until 02.11.2020 is adequate & hence further extension not required.
CPCB Clearance: Obtained and valid up to 02.11.2020. Civil Aviation: Clearances obtained and valid up to 17.12.2021.
Land Possession: Land Lease Agreement signed with VOC port Trust and 100% possession obtained.
Water Allocation: Sea Water Desalination Plant is envisaged for meeting water requirement of the Power Plant. Permission to draw Sea Water from Sheltered Basin has been obtained from Port.
Critical issues
1) Approval/NOC from Department of Forests, GoTN for pipeline and conveyor crossing.
2) Fixation of revised date of availability of start up Power and accordingly the SCOD at TNERC.
3) Approval of Coal Supply, Transport and Handling Agreements by TANGEDCO and TNERC.
Re asons for Delay
Startup power received on 09.10.2020, SCOD to be achieved by SPEC with in six months there after.
RKM - 12.02.202190
Uncertain
Sl. No.
Proje ct De tails Unit No.
C apa- city (MW)
C ommissioning Sche dule
Broad Status O riginal Actual(A)/ As Expe cte d Syn. C omm C O D Syn. C omm Trial -run C O D Private Se ctor
6
Tuticorin TPP in Tamil Nadu
(Ind. Barath Power Limited)
1
660 03/1205/12 05/12 Uncertain Uncertain