5.1 Análisis Costo Beneficio

5.2.3 Indicadores de Crecimiento y de Oportunidad

started on 01/02/16

 TG & Condenser: Civil work commenced

on 18/06/15. Condenser erection started on

20/07/16 & TG erection started on

11/08/16.

BOPs

 Chimney: Awarded to LITL, Gurgaon.

Chimney raft casting commenced on

22/07/2015. Shell concreting work started

on 29/02/16, Shell casting completed in

3/2/16.

 CHP: Awarded to M/s. FL SMIDTH (P)

Ltd. Chennai on 23/04/15. 70:30

Imported:

Domestic Coal. The soil

investigation

work

commenced

on

01/08/2015.

NOC/ROW

(Statutory

clearance) approval has been obtained

from PWD for routing ECHS from North

Chennai to project site through Ennore

Creek. The CE / PWD recommended the

proposal for the waiver of track rent to

Government on 18/11/2015 and Go TN has

not considered the case. LITL remitted the

Lease rent & refundable caution deposit to

PWD on 26/11/15.

 CW System: Awarded to Kirloskar

Brothers Ltd and Sea water intake &

outfall system-off shore to M/s Coastal

Marine construction and Engineering Ltd,

Mumbai on 07/09/15. Intake pump house

earth excavation under progress. The earth

work excavation in cooling water intake

pump

house

was

commenced

on

07/09/2015 and in progress. LITL

committed to complete the permanent

marking along the route by 31/12/15.

Obtaining

approval

from

various

departments is a time consuming process

hence M/s LITL was requested to arrange

statutory

clearance

from

Railways,

Highways, Chennai Corporation, TNHB

etc., as early as possible.

 NDCT: Awarded to M/s Hamon Thermal

Europe S.A on 05/05/15. All the 768 piles

casting completed on 08/02/16. The earth

work excavation for pile cap commenced

on

15/10/2015

and

pile

chipping

commenced on 16/12/15. Basin piling

work under progress.

 Switchyard: Switchyard and related

electrical systems are yet to be awarded.

Original /Latest Cost

(03/2016)

:Rs 4956.00 / 5421.38 Crores

Expenditure during 2014-15 Expenditure during 2015-16 Expenditure during 2016-17 Expenditure during 2017-18 :Rs. 239.70 Crores :Rs. 2.8891 Crores :Rs. 86.5609 Crores : Rs.462.250 Crores

Total Expenditure (up to 12/2017) :Rs. 791.40 Crores Approval date:

Zero date: : 14/07/2014

Financial closure

Main Plant Order : 30/05/2014 (EPC) on M/s LANCO and lanco in turn awarded the BTG to Dong Fang electric corporation, China on 18/02/15. EPC cost Rs.3921.55crs. (revised)

BOP Package

Type of fuel : COAL (70:30 Imported: Domestic Coal)

PPA PPA does not arise as the entire power is to be utilized by TANGEDCO.

Power Evacuation system Regarding Power Evacuation system is under TANRANSCO scope.

 Letter of Acceptance for Main Plant Order (EPC) issued to M/s LANCO on 05/14

(27/02/14 asper lr dt 22/12/16). LANCO in turn placed order on Dong Fang Electric Corporation., China on 18/02/15.

 MO E&F Clearances obtained on 18/09/2014.  SPCB clearance obtained on 18/02/13.

 Civil Aviation: clearance obtained on 16/05/2008

 Water allocation: Sea water is available near the project. Cooling water consumption to be drawn from Sea is 1,33,896 m3/day.

Corporate Insolvency & Bankruptcy Process (CIRP) initiated against LITL(the EPC Contractor) by IDBI Bank from 07.08.2017 and interim resolution professional appointed on 10.08.2017 and hence the project has been stalled rom 07.08.2017. The CIRP process extended up to 04.05.2018.

C ritical issues Corporate Insolvency & Bankruptcy Process (CIRP) initiated against LITL(the EPC Contractor) by IDBI Bank from 07.08.2017 and interim resolution professional appointed on 10.08.2017 and hence the project has been stalled rom 07.08.2017.

Sl. No.

Proje ct De tails Unit No.

C apa- city (MW)

C ommissioning Sche dule

Broad Status O riginal Actual(A)/ As Expe cte d Syn. C omm C O D Syn. C omm Trial -run C O D Private Se ctor 5 TuticorinTPP S t-IV / (M/s S EPC Power Pvt. Ltd.) Distt. Thoothukudi, Tamil Nadu.

1 525 07/18

09/18 10/18 03/21 03/21  Boiler: Boiler civil work started on 15/12/15 & erection started on 15/12/16. Boiler Drum lifted

on 13.8.17. Boiler hydro Test (non drainable) completed on 12.03.2020. Boiler light up on 20.10.2020.

 TG: civil work started on 01/06/016. TG erection started on 8.9.17. TG Box up done on 05.01.2021.

BOPs:

 CHP, AHP, CT, Chimney, PT and DM Plant, CW system, Fuel oil system and all other systems related to power evacuation, switchyard including C&I, Fire protection system, air- conditioning & ventilation etc. are all awarded to M /s M EIL on 18/01/14.

 CHP: Civil foundation work is nearing completion. M echanical structural fabrication & erection under progress. M echanical work 99% has been Completed

 AHP: Civil foundation work is in progress. M echanical structural fabrication erection under progress.

 Cooling Tower: Erection works completed. Testing under progress.

 Chimney: M/s MEIL awarded the chimney works to M /s Paharpur. Foundation works completed. Shell concreting completed up to 275 m. Finishing work under progress.

 PT Plant: Civil works completed, Equipment erection and commissioning by M /s Tecton under progress. 97% work has been completed.  DM Plant: Civil works are nearing completion.

Equipements erection under progress.

 Fire Perotection System: Work under progress.  Fuel Oil System : Civil works underway.  CW System: 98% works has been completed.  Switchyard: Erection works completed.

Commissioning under progress.

 LT/HT S witch-gear : Erection & commissioning completed.

Original /Latest Cost : Rs. 3514.00 / Rs. 3514.00 Crores Expenditure up to 2015-16

Expenditure during 2016-17 Expenditure during 2017-18 Expenditure during 2018-19 Expenditure during 2019-20 & 20-21

:: Rs. 480.79 Crores : Rs. 248.70 Crores : Rs. 822.94 Crores : Rs. 508.91 Crores

: Rs. 1460.63Crores (upto 31.01.2021)

Total Expenditure (up to 01/2021) :Rs. 3521.97 Crores Ze ro date : 30/10/2015

Main Plant Order : Awarded on EPC basis to M/s MEGHA Engg. and Infrastructures Ltd. (“MEIL”) on 18/01/14. M/s MEIL in turn awarded the BT G package to M/s BHEL on 30/10/2015.

Type of fue l & FSA Imported Coal firmed up and agreement with the coal

supplier was approved by Hon’ble TNERC on 10.01.2020.

PPA :PPA signed with T ANGEDCO and approved by T NERC

Powe r Evacuation system  For power evacuation 2x400 KV line has been

approved by CEA and is to be implemented by T ANGEDCO/ T ANTRANSCO.

 MOE&F Clearance : Obtained. Extended up to 02.11.2020. Since all construction works (Civil & M echanical) are completed within the month of September 20, thereafter consent to operate (CTO) was obtained and therefore EC valid until 02.11.2020 is adequate & hence further extension not required.

 CPCB Clearance: Obtained and valid up to 02.11.2020.  Civil Aviation: Clearances obtained and valid up to 17.12.2021.

 Land Possession: Land Lease Agreement signed with VOC port Trust and 100% possession obtained.

Water Allocation: Sea Water Desalination Plant is envisaged for meeting water requirement of the Power Plant. Permission to draw Sea Water from Sheltered Basin has been obtained from Port.

Critical issues

1) Approval/NOC from Department of Forests, GoTN for pipeline and conveyor crossing.

2) Fixation of revised date of availability of start up Power and accordingly the SCOD at TNERC.

3) Approval of Coal Supply, Transport and Handling Agreements by TANGEDCO and TNERC.

Re asons for Delay

 Startup power received on 09.10.2020, SCOD to be achieved by SPEC with in six months there after.

RKM - 12.02.2021

90

Uncertain

Sl. No.

Proje ct De tails Unit No.

C apa- city (MW)

C ommissioning Sche dule

Broad Status O riginal Actual(A)/ As Expe cte d Syn. C omm C O D Syn. C omm Trial -run C O D Private Se ctor

6

Tuticorin TPP in Tamil Nadu

(Ind. Barath Power Limited)

1

660 03/12

05/12 05/12 Uncertain Uncertain

 Boiler: All civil work completed & Boiler erection started.

 ESP: All civil foundation work

completed. Erection started.

 TG: All civil foundation work

completed. Condenser & TG erection

works yet to start.

BOPs

 Chimney:

Awarded

tosimplex