2. SITUACIÓN ACTUAL DE CADA UNO DE LOS SERVICIOS DEL
2.1. Mercadeo
CONTRACT NO.
CHECK LIST FOR CONCRETING REF DRAWING NO ______________________
LOCATION BLOCK ___________ FLOOR _____ AREA_____
LAYOUT Alignment Level of base Dimensional Check Starters Location of cu-outs
Checked Checked (edges & diagonals) & services
STAGING/ Adequacy & rigidity of
SCAFFOLDING Props, stays,bracings, Conformity
to scheme drawings
FORMWORK Qty of forms and support Vertical form surface in alignment & plumb
Even surface Gaps between
shuttering are Properly closed.
No space for sagging of
Props adequate Oil sprayed Form work
REINFORCEMENT Cutting & bending as per Bar bending schedule (schedules attached)
Adequate laps Welds
Chair/cover blocks Placed as per scheme
Binding wire not Fixtures, inserts Touching shuttering Conduits in position
Dowels & positioning Walkway for Provided as per drg. Labour provided
PRE-CONCRETING Concreting Approval of Mixer/vibrator Top level of Transporting & Arrangements Construction joint Condition & mixing Concerete marked Placeing
arrangement POST-CONCRETING Compaction Removal of laitance Post concreting Nos of cubes cast
Checked Level/dimensions.
DESHUTTERING Curing days--- Surface finish Concrete Test
& CLEARING Water/compound OK Results OK
W.O. Item UNIT QTY. SIGNATURE:
General Conditions of Contract - Section - 6 National Buildings Construction Corporation Limited
Page 121
Signature of Contractor NBCC
NAME OF PROJECT______________________________________
CONTRACTORCONTRACT NO.
CHECK LIST FOR MASONRY WORK REF DRAWING ________________________
LOCATIONBLOCK______FLOOR________AREA__________
LAYOUT Alignment & wall Brick on edge Thickness checked ` (top course)
SCAFFOLDING Adequacy of props, Rigidity of base Movement space Approach to
Stays, platform height
PRE-LAYING Working arrangements Bricks as per specification
Mortar grade & mix Bricks moistened & service provisions
checked
As specified
LAYING Joint thickness & course Joint alignment Vertical joints Ht. As specified Checked Properly mortar filled
from top Raking of joints Bearing plaster for
Done (if applicable) Concrete
CURING AND Proper curing of const. Scaffolding removed
CLEARING Joint. (if required)
W.O. Item UNIT QTY.
SIGNATURE:
Page 122
NAME OF PROJECT______________________________________
CONTRACTORCONTRACT NO.
CHECK LIST FOR PLASTERING WORK LOCATION BLOCK ____________________
FLOOR ____________AREA _________________________
SCAFFOLDING Platform Stability Movement space Approach to
Height
SERVICE All chasing work Fixing in position Patching All door/window frames Skirting to floors Complete Using clamps etc. Work complete Fixed in position marked
CLEARANCE FROM AE (E)
SURFACE Clearing & raking of Roughening Fixing metal/lathe Mortar level Surface moistened/
PREPARATION Surface Hacking done Chicken mesh Guides made Cement slurry
PLASTERING Mix & w/p compound Coating/thickness Groove at joints Corners & edges sharp & at right Angles lines & levels maintained
Surface leveled with Checked as per
specification
As specified Provided At straight edge
FINISHING Texture Curing Site cleared
Days---
W.O. Item UNIT QTY.
SIGNATURE:
General Conditions of Contract - Section - 6 National Buildings Construction Corporation Limited
Page 123
Signature of Contractor NBCC
NAME OF PROJECT______________________________________
CONTRACTORCONTRACT NO.
CHECK LIST FOR GLAZED TILE FLOORING LOCATION BLOCK ________________________ FLOOR____________AREA______________________
LAYOUT Service provisions Fixing pattern Level of base & dado Finish level Door & window
Sanitary, electrical Height market Guide frames in position
BASE Mix Thickness Watering / Evenness Verticality, corners
Layers Cement slurry At right angle
LAYING Moistening of tiles Plan position of Cut to size Chamfering of edges &
Raking/jointing Cut pieces at corner Smooth edge edge Matching
proper Cement slurry
adhesive
Level & plumb No hollow sound Checked On tapping FINISHING Grouting of joints Curing of joints
W.O. Item UNIT QTY.
SIGNATURE:
Page 124
NAME OF PROJECT______________________________________
CONTRACTORCONTRACT NO.
CHECK LIST FOR MOSAIC FLOORING LOCATION BLOCK ___________
FLOOR ___________AREA________________________
LAYOUT Sub base Provision of Panelling (max size) Level of
Prepared Services checked Separator strips Sub base checked
Slope
Provision checked
BASE LAYER Mix Water/cement Cement concrete Ramming/leveling
As specified Slurry applied Thickness checked Compaction done Evenness Joints treatment
Checked If any, provided
TOP Mix Proper leveling Trowelling finish Curing done
LAYER As specified Done Proper
FINISHING Grinding Final g grinding Repair applied at Polishing grinding stages
W.O. Item UNIT QTY.
SIGNATURE:
General Conditions of Contract - Section - 6 National Buildings Construction Corporation Limited
Page 125
Signature of Contractor NBCC
NAME OF PROJECT______________________________________
CONTRACTORCONTRACT NO.
CHECK LIST FOR GRIT WASH DRAWING NO.______________________ FLOOR NO._________________________
SCAFFOLDING Platform Stability Movement space Approach to hight
SERVICE PROVISIONS
All chasing work All door/windows frames Complete Fixed in position
SURFACE Roughening/hacking Fixing metal/lathe Mortar level Surface moistened/
PREPARATION Of surface done Chicken mesh Guides made Cement slurry
BASE PLASTER Mix & w/p compound Coating/thickness Corners & edges sharp & at right angles lines & levels maintained Checked against specs As specified
TOP LAYER Fixing of beading for grooves as per drawing
Lines and levels of grooves maintained
Mix as per specification
Washing of top layer Washing with Acid (light) Curing day Texture of final surface
W.O. Item UNIT QTY.
SIGNATURE:
Page 126