CONTRACT NO.

CHECK LIST FOR CONCRETING REF DRAWING NO ______________________

LOCATION BLOCK ___________ FLOOR _____ AREA_____

LAYOUT Alignment Level of base Dimensional Check Starters Location of cu-outs

Checked Checked (edges & diagonals) & services

STAGING/ Adequacy & rigidity of

SCAFFOLDING Props, stays,bracings, Conformity

to scheme drawings

FORMWORK Qty of forms and support Vertical form surface in alignment & plumb

Even surface Gaps between

shuttering are Properly closed.

No space for sagging of

Props adequate Oil sprayed Form work

REINFORCEMENT Cutting & bending as per Bar bending schedule (schedules attached)

Adequate laps Welds

Chair/cover blocks Placed as per scheme

Binding wire not Fixtures, inserts Touching shuttering Conduits in position

Dowels & positioning Walkway for Provided as per drg. Labour provided

PRE-CONCRETING Concreting Approval of Mixer/vibrator Top level of Transporting & Arrangements Construction joint Condition & mixing Concerete marked Placeing

arrangement POST-CONCRETING Compaction Removal of laitance Post concreting Nos of cubes cast

Checked Level/dimensions.

DESHUTTERING Curing days--- Surface finish Concrete Test

& CLEARING Water/compound OK Results OK

W.O. Item UNIT QTY. SIGNATURE:

General Conditions of Contract - Section - 6 National Buildings Construction Corporation Limited

Page 121

Signature of Contractor NBCC

NAME OF PROJECT______________________________________

CONTRACTOR

CONTRACT NO.

CHECK LIST FOR MASONRY WORK REF DRAWING ________________________

LOCATIONBLOCK______FLOOR________AREA__________

LAYOUT Alignment & wall Brick on edge Thickness checked ` (top course)

SCAFFOLDING Adequacy of props, Rigidity of base Movement space Approach to

Stays, platform height

PRE-LAYING Working arrangements Bricks as per specification

Mortar grade & mix Bricks moistened & service provisions

checked

As specified

LAYING Joint thickness & course Joint alignment Vertical joints Ht. As specified Checked Properly mortar filled

from top Raking of joints Bearing plaster for

Done (if applicable) Concrete

CURING AND Proper curing of const. Scaffolding removed

CLEARING Joint. (if required)

W.O. Item UNIT QTY.

SIGNATURE:

Page 122

NAME OF PROJECT______________________________________

CONTRACTOR

CONTRACT NO.

CHECK LIST FOR PLASTERING WORK LOCATION BLOCK ____________________

FLOOR ____________AREA _________________________

SCAFFOLDING Platform Stability Movement space Approach to

Height

SERVICE All chasing work Fixing in position Patching All door/window frames Skirting to floors Complete Using clamps etc. Work complete Fixed in position marked

CLEARANCE FROM AE (E)

SURFACE Clearing & raking of Roughening Fixing metal/lathe Mortar level Surface moistened/

PREPARATION Surface Hacking done Chicken mesh Guides made Cement slurry

PLASTERING Mix & w/p compound Coating/thickness Groove at joints Corners & edges sharp & at right Angles lines & levels maintained

Surface leveled with Checked as per

specification

As specified Provided At straight edge

FINISHING Texture Curing Site cleared

Days---

W.O. Item UNIT QTY.

SIGNATURE:

General Conditions of Contract - Section - 6 National Buildings Construction Corporation Limited

Page 123

Signature of Contractor NBCC

NAME OF PROJECT______________________________________

CONTRACTOR

CONTRACT NO.

CHECK LIST FOR GLAZED TILE FLOORING LOCATION BLOCK ________________________ FLOOR____________AREA______________________

LAYOUT Service provisions Fixing pattern Level of base & dado Finish level Door & window

Sanitary, electrical Height market Guide frames in position

BASE Mix Thickness Watering / Evenness Verticality, corners

Layers Cement slurry At right angle

LAYING Moistening of tiles Plan position of Cut to size Chamfering of edges &

Raking/jointing Cut pieces at corner Smooth edge edge Matching

proper Cement slurry

adhesive

Level & plumb No hollow sound Checked On tapping FINISHING Grouting of joints Curing of joints

W.O. Item UNIT QTY.

SIGNATURE:

Page 124

NAME OF PROJECT______________________________________

CONTRACTOR

CONTRACT NO.

CHECK LIST FOR MOSAIC FLOORING LOCATION BLOCK ___________

FLOOR ___________AREA________________________

LAYOUT Sub base Provision of Panelling (max size) Level of

Prepared Services checked Separator strips Sub base checked

Slope

Provision checked

BASE LAYER Mix Water/cement Cement concrete Ramming/leveling

As specified Slurry applied Thickness checked Compaction done Evenness Joints treatment

Checked If any, provided

TOP Mix Proper leveling Trowelling finish Curing done

LAYER As specified Done Proper

FINISHING Grinding Final g grinding Repair applied at Polishing grinding stages

W.O. Item UNIT QTY.

SIGNATURE:

General Conditions of Contract - Section - 6 National Buildings Construction Corporation Limited

Page 125

Signature of Contractor NBCC

NAME OF PROJECT______________________________________

CONTRACTOR

CONTRACT NO.

CHECK LIST FOR GRIT WASH DRAWING NO.______________________ FLOOR NO._________________________

SCAFFOLDING Platform Stability Movement space Approach to hight

SERVICE PROVISIONS

All chasing work All door/windows frames Complete Fixed in position

SURFACE Roughening/hacking Fixing metal/lathe Mortar level Surface moistened/

PREPARATION Of surface done Chicken mesh Guides made Cement slurry

BASE PLASTER Mix & w/p compound Coating/thickness Corners & edges sharp & at right angles lines & levels maintained Checked against specs As specified

TOP LAYER Fixing of beading for grooves as per drawing

Lines and levels of grooves maintained

Mix as per specification

Washing of top layer Washing with Acid (light) Curing day Texture of final surface

W.O. Item UNIT QTY.

SIGNATURE:

Page 126

NAME OF PROJECT______________________________________