The remedial actions are shown in Table 6.1, together with responsible parties and completion dates.

Table 6.1 : Remedial Action List

Rap No Description ALARP rating Status

1 Develop Performance Standards for all D-Island Safety Critical

Systems Do Ongoing – AKCO District

HSE

2 Develop competency framework for all safety critical tasks Do Ongoing – AKCO District HSE

3 Include safety critical tasks in job descriptions - consider use of Job

description "passports" Study Ongoing

4 Ensure AMOS system is fully functional prior to in reservoir drilling - maintenance management system (MMS) to be audited to ensure it is correctly populated. Safety Critical Equipment identified within the MMS

Do Complete

5 Ensure kick detection tools are fully functionality prior to in reservoir

drilling Do Complete

6 Develop contractor HSE management plan that includes asset

integrity, HSE and D-Island operational oversight provisions Do

7 Ensure there is a control panel for BOP in the Toolpusher's office Do Complete 8 Establish the ALARP demonstration for not installing burner booms

and/or provide appropriate means of safely disposing of gas produced during a kick

Do Complete

9 Ensure mud pumps are fully functional and debugged before

commencing in reservoir drilling Do Complete

10 Ensure D-Island seawater intakes are monitored and inspected

regularly Do Complete

11 Review and revise, as appropriate, procedures for managing

scaffolding at D-Island Do Complete

12 Ensure that as part of PTW process the contractor applying for a permit to work on scaffolding provides evidence that work crew have appropriate training

Do Complete

13 Identify D-Island locations that have high potential for slips and falls

and install antislip matting as appropriate Do Complete

14 Escape line training to be provided for personnel working on monkey

board Do Complete

15 Consider installing a movable barrier system to prevent personnel

falling to sea Pass N/A

16 Consider marking out exclusion zone Pass N/A

17 Confirm that routine man riding procedures includes the requirement for a risk assessment and specifies that only trained personnel are permitted to undertake man riding operations

Do Complete

18 Ensure training is in place for all personnel involved in man riding

operations and ensure that it includes the use of hand signals Do Complete 19 Review man riding winch's classification and operability issues (e.g.

spooling) with supplier and class society Do Complete

20 Confirm that cherry pickers meet Agip-KCO specification Do Complete

21 Identify which organisation is responsible for maintaining and certifying

personnel baskets Do Complete

22 Develop procedure for recovering personnel safely who have fallen in to the sea - identify equipment for recovering personnel from sea (FRC, Dacon scoop, Jason's cradles, etc) and identify training requirements for lifesaving equipment

Do Complete

23 Develop procedure for recovering personnel safely who have fallen to

the ice Do Complete

24 Identify equipment (e.g. tripods, pulleys, rescue ropes, karabiners, stretchers, etc), training & competency requirements, and procedure for high angle rescue

Do Ongoing – District HSE 25 Consider lessons learnt from A-Island 3.5 inch tubular incident (March

2006) - install protective cage near end stop on cat walk machine Do Complete

Rap No Description ALARP rating Status 26 Conduct review of D-Island materials handling storage and operational

arrangements for bulk materials and tubulars including the use of cranes, amend procedures as required - identify storage best practice, pedestrian routes, segregation of personnel from island traffic, etc.

Do Complete

27 Barrier off laydown machine during operations - review access

arrangement around laydown machine Do Complete

28 Review results of feasibility study for installation of pipe handling crane Study

29 Review physical controls on personnel access around V-door Do Complete

30 Install dedicated pipe storage area behind cement unit as planned Do Complete 31 Carry out best practice review tubular handling and storage of tubulars

on D-Island. Institute appropriate training programme Do Complete

32 Review control of lifting and rigging equipment Do Complete

33 Consider installing tubular handling clamps on fork lifts Do Complete

34 Review the controls of webbing slings - carry out inspections for

damage caused through contact with hydrocarbons Do Complete

35 Specify competency framework for medic for offshore emergency

response scenarios e.g. high angle rescue, recovery from sea, H2S Do Complete 36 Review controls on helicopter freight being sent from D-Island Do Complete 37 Review freight dispatch policy with a view to reducing the use of

helicopter transport i.e. can boats be used rather than helicopters for transportation of freight to island.

Do Complete

38 Confirm that IATA / ICAO training is provided for D-Island and airport

freight dispatcher Do Complete

39 Implement drugs and alcohol testing policy/procedure once review has

been completed Agip-KCO legal department Do Complete

40 Review medical treatment arrangements on IBSVs and ensure they

are adequate to support D-Island Emergency Response Plans Do Complete - plans assume no medical facilities on IBSVs 41 Ensure standby vessel conduct regular drills for helicopter ditching and

that drills include rehearsing the recovery of people Do Complete

42 Implement system that identifies personnel on helicopters with dispensations. For example, personnel to wear identification that they have not completed HUET training to enable appropriate allocation of seating position in helicopter

Do Complete

43 Issue passenger instructions (describing what clothes can be worn on

the helicopter) to all personnel Do Complete

44 During review of LQ Aramark contract ensure that changes do not impair provision of helideck operations support team and provision / competency of fire team/emergency response team

Do Complete

45 Confirm that fire fighting equipment can be used in ice conditions e.g.

confirm water intakes not impaired by ice Do Complete

46 Update neighbouring facilities HSE cases to reflect D-Island being

in-reservoir Do Complete – incorporated in

neighbouring facilities HSE plans

47 Complete development of Blowout Emergency Contingency Plan Do Complete

48 Complete development of D-Island ER plan for ice season in reservoir

drilling operations Do Complete

49 Completed development of IBEEV management document - IBEEV managed by contractor under company guidance / operating procedures

Do Complete

50 Consider obtaining dispensation for 300 people on D-Island with one IBEEV available during the short periods when second IBEEV is under going sea-ice trials

Do Complete

51 Identify whether partial evacuation is possible of D-Island as part of emergency response plan - part of Emergency Escape and Rescue study

Rap No Description ALARP rating Status 52 Update ice management forecasting procedure to consider interaction

between multiple facilities being in-reservoir simultaneously Do Complete 53 Develop reporting system to provide D-Island's Operations

Management with information on the current status and system performance of all of D-Islands Safety Critical Systems

Do Complete

54 Consider instituting Cabin Checker role to ensure that TR Doors are

closed Do Complete

55 Ensure that escape set performance specification is appropriate for D-Island's layout and TR/Muster arrangements - part of Emergency Escape and Rescue study

Do Complete

56 Carry out an Emergency Escape and Rescue study for D-Island in reservoir drilling operations to specify emergency system performance requirements; ensure recommendations are implemented

Do Complete

57 Arrange “lesson learnt” sessions with A-Island team, covering all

aspects of drilling and Island operations Do Complete

58 Escape sets to be carried by personnel working away from areas served by yellow locker with breathing cascade and SCBA sets - part of Emergency Escape and Rescue study

Do Complete

59 Review blowout toxic gas dispersion modelling in light of A-Island flare out Summer 2006 and assess impact on location of safe waypoint and ER planning

Do Complete

60 D-Island specific induction training for all personnel to be updated for

in reservoir operations Do Complete

61 Provide training for all personnel on IBEEV systems prior to

in-reservoir drilling Do Complete

62 Confirm requirement for using airlock on Shapagat during ER Do Complete

63 Review positioning of detectors on drilling rigs and ensure that

coverage provided meets design intent Do Complete

64 Ensure ER plan includes requirement for issue of Securitee message

on channel 16 - part of ER plan development Do Complete

65 Ensure District ER team notification of local port authorities of incidents

is included in ER Plan - part of ER plan development Do Complete

66 Complete Well Ignition plan and provide suitable means of igniting well Do Complete 67 Update operating instructions for marine vessels and incorporate into

Marine Manual Do Complete

68 Consider introducing mandatory use of HandSan or similar hand

sanitiser prior to entering canteen Pass N/A

69 Develop competency framework and training programme for food

hygiene inspectors (applicable to Agip-KCO and all contractors) Do Complete 70 Develop catering competence framework and ensure appropriate

training programme is instituted to meet Agip-KCO standards, ensure audit regime established for verification of effectiveness of training

Do Complete

71 Consider need for appointing an Environmental Health Officer Do Complete 72 Consider installing water quality testing facilities (hatch lab.) on

D-Island ( with the ability to measure bacteria, chlorine levels etc) to monitor potable water quality

Do Complete

73 Risk assess potable water supply system and standardise, as far as

practicable, water supply systems and procedures Do Complete

74 Water supplied to personnel around D-Island is by insecure "igloos", Identify means of preventing contamination of "igloo" water or identify alternative more secure water supply system e.g. bottled water

Do Ongoing, igloos are being removed and replaced with

new water supply systems 75 Confirm that potable water storage tanks on LQ barges are fully

enclosed Do Complete

76 Agip-KCO to determine hygiene standards and verification scheme to

be applied to catering contracts Do Complete

77 Ensure that Agip-KCO has operational oversight of catering contractors – As of August 2006 with Wagenborg and vessel management

Do Complete

Rap No Description ALARP rating Status

chain

79 Identify contractual responsibility for management of food containers Do Complete 80 Conduct health risk assessment of Legionella in LQs and institute

additional controls if required Do Complete

81 Place contract for the supply of pharmaceuticals and other medical

supplies to D-Island Do Complete

82 Update A-Island HSE case and ERP to incorporate impact of D-Island

incidents on A-Island Do Complete – HSE Case

updated, see also Action 46 83 Provide more information on loss pipe recovery systems and review Pass N/A

84 Review controls/procedures for vehicles on D-Island against Agip KCO

requirements Do Complete

85 Complete and implement actions from review of protection of

Monkeyboard man Do Complete

86 Investigate whether drawworks cooling system will be fully operational

during winter season Do Complete

87 Confirm whether CO2 fixed fire system in engine rooms Do Complete - no fixed CO2

system 88 Complete review of impact of exhaust fumes on wireline cabin -

currently under investigation Occupational Hygiene Do Complete

89 Complete and implement recommendations from trial on reduction of

Barite emissions Do Complete

90 Consider gravelling whole Island to reduce dust emissions Pass N/A

91 Complete noise survey being carried out and implement

recommendations Do Complete

92 Complete thermal comfort survey being carried out and implement

recommendations Do Complete

93 Complete lighting survey being carried out and implement

recommendations Do Complete

94 Carry out an ergonomic assessment of normally manned areas

including an assessment of the ability to rescue injured personnel Do Complete 95 Develop training plan and matrix for D-Island personnel to address the

training and competency requirements of the safety critical tasks Do Complete 96 Confirm that the delivery rate of cement and barite from bulk systems

to the mixing systems is high enough to cope with any emergency well control problems

Do Complete

97 Confirm arrangements for management of helidecks on the two TR/LQ

barges Do Complete

98 VTS system to be installed Do Ongoing

PART 7 – CONCLUSION & STATEMENT OF JUSTIFICATION FOR OPERATIONS

7 CONCLUSION & STATEMENT OF JUSTIFICATION FOR OPERATIONS