Gurgaon. “Providing, stringing

out, jointing, cutting and testing of

DI pipes (K9) of 200mm to

1200mm i/d sizes, providing and

fixing of sluice valves, zero

velocity valve, scour valve, double

action air valve and construction

of sluice valve haudies and all

other works contingent thereto."

(including A/Mtc. defect liability

period for 3 years).

Rs.852.00Lacs / Rs.948.65Lacs

2649.00

CA.11807-10

Dt.11.03.2013

500.00

02.12.2013

1862.83

31.12.2015

Total scope of

work

D.I. Pipe =

20.54Km.

12.50 Km D.I. pipe laid at site and work

is in progress.

MS pipe of size 1200mm i/d = 1.06 Km

& 800mm i/d = 0.18 Km received at site.

(Work is in progress)

HUDA DIVISION No. V

11. Construction of Master Roads in

New Sector – 99 to 115, Gurgaon.

21255.00

CA.23387

Dt.09.06.2010

1000.00

8749.74

Total Road length against approved

estimate = 30.88Km.

a)

A/C Rs.82.70Crores,

Const. of 60Mtr. & 75 Mtr. Road

20.11.2011

Work

completed

(in clear area)

Work completed

b)

A/C Rs.856.30Lacs,

Const. of 60Mtr. Road recently

acquired road.

29.03.2013

Work

completed

Work completed

c)

A/C Rs.5.30Crores,

Const. of 2 Nos. bridges / culvert

16.04.2013

Work

completed

Work completed

d) A/C Rs.13.00Crores

Construction of Balance road

dividing Sector – 101/104

27.04.2015

26.01.2016

Earth work completed in 450Mtr. length

(one side).

e)

A/C Rs.2.30Crores

Const. of road work for part

connectivity in dividing Sector –

99/102, 102/102A, 102A/103 &

106/109 with NPR road.

27.04.2015

26.12.2015

Earth

work

completed

&

WMM

completed in 510Mtr. length.

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

12. Construction of Govt. College of

Commerce Balance Sector – 51,

Gurgaon.

Rs.2958.00Lacs / Rs.2723.00Lacs

4003.30

CA.24523-27

Dt.17.05.2013

Education

Deptt. =

3450.50Lacs

HUDA =

522.80Lacs

400.00

15.07.2013

2847.88

31.12.2015

Main building, Boy’s Hostel, Girl’s

Hostel have been completed upto

flooring & plastering. Painting &

sanitary work in progress.

The Auditorium & Staff quarters

completed upto plaster work &

flooring work in progress.

Over all 93% work completed. The

progress is affecting due to shortage

of funds.

13.

Master Sewer Leg No. V (58 to 76) Rs.3540.00Lacs

11650.00

CA.41727-31

Dt.16.12.2011

700.00

01.04.2012

2931.40

31.12.2015

(100%

Work

Completed

on

available

land on

31.03.2015)

Total length against allotted work

= 23.44Km.

Completed = 20.43Km.

Length of sewer laid by MCG on

Sohna road

=2.31 Km

Superintending Engineer,

HUDA Circle – I, Gurgaon.

(WHICH ARE LIKELY TO BE COMPLETED AFTER THE YEAR 2015-16)

HUDA CIRCLE-I, GURGAON

[10/2015]

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date of

completion

Action Plan

Remarks.

1

Const. of Railway portion of

ROB on Delhi – Reweri Railway

line.

6391.00

CA 13629

Dt.18.03.2013

3195.00

21.09.2015

3196.00

21.06.2016

--

a) Physical Status

7. Rs.31.96Crores i.e. 50% amount released & deposited to Railway Deptt. by the XEN-II vide his office memo No. 17757 dated 11.09.2013 for inviting tenders in C.E. of Railway, however Railway has demanded balance 50% amount in the meeting held on 29.07.2015

8. The work was allotted on 21.09.2015. The completion period is 9 months & work is in progress and therefore work likely to be completed upto 21.06.2016, if Railway adheres to its time schedule.

9. Deposit estimate of service crossing to be submitted by Railway Deptt.

Superintending Engineer,

HUDA Circle – I, Gurgaon.

PERFORMA P-47A

STATUS OF MAJOR DEVELOPMENT WORKS HAVING BUDGET PROVISION OF Rs.1.00 CRORE AND ABOVE

(WHICH ARE LIKELY TO BE COMPLETED DURING THE YEAR 2015-16)

HUDA CIRCLE-I, GURGAON

[10/2015]

Sr.

No.

Name of Work

Estimated

Cost /App.

No. & Dt.

(Rs. in Lacs)

Budget for

the year

2015 - 2016

(Rs. in Lacs)

Likely date/

date of start

Upto date

Expenditure

(10/2015)

(Rs. in Lacs)

Likely date

of

completion

Action Plan

Remarks.

1

2

3

4

6

5

7

8

9

HUDA DIVISION No. II

1.

Prov. Distribution mains for Recycle

water for Zone-I, II & III, U/E,

Gurgaon.

2465.00

CA 3786

Dt.30.01.2012

1300.00

a

Prov. stringing out, jointing, cutting

and testing of D.I. pipes of 200mm to

600mm i/d sizes for recycled water,

prov. and laying M.S. pipe of size

600mm through trenchless method

etc. and all other works contingent

thereto. A/c Rs.8.45Crores (Work

enhanced from Rs.8,08,59,757/- to

Rs.11.99Crores) (Original Time limit

12 Months from 07.01.2013 to

06.01.2014)

07.01.2013

948.64

31.12.2015

(For clear

area)

--

90% i.e. 19.50Km work completed in

clear available portion, however total

DNIT scope is 21.48Km

1.98Km is under various hindrances

(Court Stay 0.20Km, Permission from

NHAI / IOCL 0.13Km, Encroachment

1.65Km)

b

Prov. stringing out, jointing, cutting and testing of D.I. pipes of balance 100mm to 450mm i/d sizes for recycled water, prov. and laying M.S. pipe of size 300mm to 600mm i/d through trenchless method, prov. and fixing of sluice valves haudies and all other works contingent thereto. A/c Rs.13.00Crores / Rs.12.25Crores. (Original Time limit 12 Months from 12.09.2014 to 11.09.2015

)

12.09.2014

828.76

11.03.2016

--

70% i.e.28.50Km work completed

out of 41.78 Km, 12.97Km work is in

progress at site.

0.15Km work held up due to court

stay & 0.16Km due to IOCL approval

The progress got affected due to non

2.

Const. of Northern Peripheral

Road from Kherki Daula to

Dwarka, Gurgaon

13178.00

CA 20851

Dt.24.05.2010

1000.00

a)

Const. of road in 14 K.M length of

available land

A/c

Rs.57.00Crores

(Work

enhanced from Rs.44,08,14,640/-

to Rs.50,01,99,531/-)

01.04.2011

4934.37

30.06.2015

Completed

--

Physical Status

16.20Km completed Out of total length of

NPR 18.00Km, details as :-

14.33Km upto Bituminous concrete (B.C.),

1.20Km upto Granular Sub Base (GSB) in

ROB portion and 0.67Km earth)

0.33Km earth work is in progress under

sub work (b)

1.47Km work under allotment, as per sub

work (c)

Bottlenecks

Shifting of 220 / 66 K.V. Gantry poles by

HVPNL and funds of Rs.13.60Crores to be

transferred by DHBVN to HVPNL

Shifting of 220 K.V lines by Underground

cabling by BBMB Ballabgarh and deposit

estimate is yet to be submitted by BBMB

b)

Const. of Road (2 x 12.5m) of

Balance Portion & Cross Drainage

etc. (1.0Km Length)

Rs.980.00Lacs / Rs.783.90Lacs

01.03.2014

46.93

31.12.2015

--

0.67Km earth work completed and

remaining 0.33Km earth work in

progress.

The work delayed due to the agitation