Gurgaon. “Providing, stringing
out, jointing, cutting and testing of
DI pipes (K9) of 200mm to
1200mm i/d sizes, providing and
fixing of sluice valves, zero
velocity valve, scour valve, double
action air valve and construction
of sluice valve haudies and all
other works contingent thereto."
(including A/Mtc. defect liability
period for 3 years).
Rs.852.00Lacs / Rs.948.65Lacs
2649.00
CA.11807-10
Dt.11.03.2013
500.00
02.12.2013
1862.83
31.12.2015
Total scope of
work
D.I. Pipe =
20.54Km.
12.50 Km D.I. pipe laid at site and work
is in progress.
MS pipe of size 1200mm i/d = 1.06 Km
& 800mm i/d = 0.18 Km received at site.
(Work is in progress)
HUDA DIVISION No. V
11. Construction of Master Roads in
New Sector – 99 to 115, Gurgaon.
21255.00
CA.23387
Dt.09.06.2010
1000.00
8749.74
Total Road length against approved
estimate = 30.88Km.
a)
A/C Rs.82.70Crores,
Const. of 60Mtr. & 75 Mtr. Road
20.11.2011
Work
completed
(in clear area)
Work completed
b)
A/C Rs.856.30Lacs,
Const. of 60Mtr. Road recently
acquired road.
29.03.2013
Work
completed
Work completed
c)
A/C Rs.5.30Crores,
Const. of 2 Nos. bridges / culvert
16.04.2013
Work
completed
Work completed
d) A/C Rs.13.00Crores
Construction of Balance road
dividing Sector – 101/104
27.04.2015
26.01.2016
Earth work completed in 450Mtr. length
(one side).
e)
A/C Rs.2.30Crores
Const. of road work for part
connectivity in dividing Sector –
99/102, 102/102A, 102A/103 &
106/109 with NPR road.
27.04.2015
26.12.2015
Earth
work
completed
&
WMM
completed in 510Mtr. length.
Sr.
No.
Name of Work
Estimated
Cost /App.
No. & Dt.
(Rs. in Lacs)
Budget for
the year
2015 - 2016
(Rs. in Lacs)
Likely date/
date of start
Upto date
Expenditure
(10/2015)
(Rs. in Lacs)
Likely date
of
completion
Action Plan
Remarks.
12. Construction of Govt. College of
Commerce Balance Sector – 51,
Gurgaon.
Rs.2958.00Lacs / Rs.2723.00Lacs
4003.30
CA.24523-27
Dt.17.05.2013
Education
Deptt. =
3450.50Lacs
HUDA =
522.80Lacs
400.00
15.07.2013
2847.88
31.12.2015
Main building, Boy’s Hostel, Girl’s
Hostel have been completed upto
flooring & plastering. Painting &
sanitary work in progress.
The Auditorium & Staff quarters
completed upto plaster work &
flooring work in progress.
Over all 93% work completed. The
progress is affecting due to shortage
of funds.
13.
Master Sewer Leg No. V (58 to 76) Rs.3540.00Lacs11650.00
CA.41727-31
Dt.16.12.2011
700.00
01.04.2012
2931.40
31.12.2015
(100%
Work
Completed
on
available
land on
31.03.2015)
Total length against allotted work
= 23.44Km.
Completed = 20.43Km.
Length of sewer laid by MCG on
Sohna road
=2.31 Km
Superintending Engineer,
HUDA Circle – I, Gurgaon.
(WHICH ARE LIKELY TO BE COMPLETED AFTER THE YEAR 2015-16)
HUDA CIRCLE-I, GURGAON
[10/2015]
Sr.
No.
Name of Work
Estimated
Cost /App.
No. & Dt.
(Rs. in Lacs)
Budget for
the year
2015 - 2016
(Rs. in Lacs)
Likely date/
date of start
Upto date
Expenditure
(10/2015)
(Rs. in Lacs)
Likely date of
completion
Action Plan
Remarks.
1
Const. of Railway portion of
ROB on Delhi – Reweri Railway
line.
6391.00
CA 13629
Dt.18.03.2013
3195.00
21.09.2015
3196.00
21.06.2016
--
a) Physical Status7. Rs.31.96Crores i.e. 50% amount released & deposited to Railway Deptt. by the XEN-II vide his office memo No. 17757 dated 11.09.2013 for inviting tenders in C.E. of Railway, however Railway has demanded balance 50% amount in the meeting held on 29.07.2015
8. The work was allotted on 21.09.2015. The completion period is 9 months & work is in progress and therefore work likely to be completed upto 21.06.2016, if Railway adheres to its time schedule.
9. Deposit estimate of service crossing to be submitted by Railway Deptt.
Superintending Engineer,
HUDA Circle – I, Gurgaon.
PERFORMA P-47A
STATUS OF MAJOR DEVELOPMENT WORKS HAVING BUDGET PROVISION OF Rs.1.00 CRORE AND ABOVE
(WHICH ARE LIKELY TO BE COMPLETED DURING THE YEAR 2015-16)
HUDA CIRCLE-I, GURGAON
[10/2015]
Sr.
No.
Name of Work
Estimated
Cost /App.
No. & Dt.
(Rs. in Lacs)
Budget for
the year
2015 - 2016
(Rs. in Lacs)
Likely date/
date of start
Upto date
Expenditure
(10/2015)
(Rs. in Lacs)
Likely date
of
completion
Action Plan
Remarks.
1
2
3
4
6
5
7
8
9
HUDA DIVISION No. II
1.
Prov. Distribution mains for Recycle
water for Zone-I, II & III, U/E,
Gurgaon.
2465.00
CA 3786
Dt.30.01.2012
1300.00
a
Prov. stringing out, jointing, cutting
and testing of D.I. pipes of 200mm to
600mm i/d sizes for recycled water,
prov. and laying M.S. pipe of size
600mm through trenchless method
etc. and all other works contingent
thereto. A/c Rs.8.45Crores (Work
enhanced from Rs.8,08,59,757/- to
Rs.11.99Crores) (Original Time limit
12 Months from 07.01.2013 to
06.01.2014)
07.01.2013
948.64
31.12.2015
(For clear
area)
--
90% i.e. 19.50Km work completed in
clear available portion, however total
DNIT scope is 21.48Km
1.98Km is under various hindrances
(Court Stay 0.20Km, Permission from
NHAI / IOCL 0.13Km, Encroachment
1.65Km)
b
Prov. stringing out, jointing, cutting and testing of D.I. pipes of balance 100mm to 450mm i/d sizes for recycled water, prov. and laying M.S. pipe of size 300mm to 600mm i/d through trenchless method, prov. and fixing of sluice valves haudies and all other works contingent thereto. A/c Rs.13.00Crores / Rs.12.25Crores. (Original Time limit 12 Months from 12.09.2014 to 11.09.2015)
12.09.2014
828.76
11.03.2016
--
70% i.e.28.50Km work completed
out of 41.78 Km, 12.97Km work is in
progress at site.
0.15Km work held up due to court
stay & 0.16Km due to IOCL approval
The progress got affected due to non
2.
Const. of Northern Peripheral
Road from Kherki Daula to
Dwarka, Gurgaon
13178.00
CA 20851
Dt.24.05.2010
1000.00
a)
Const. of road in 14 K.M length of
available land
A/c
Rs.57.00Crores
(Work
enhanced from Rs.44,08,14,640/-
to Rs.50,01,99,531/-)
01.04.2011
4934.37
30.06.2015
Completed
--
Physical Status
16.20Km completed Out of total length of
NPR 18.00Km, details as :-
14.33Km upto Bituminous concrete (B.C.),
1.20Km upto Granular Sub Base (GSB) in
ROB portion and 0.67Km earth)
0.33Km earth work is in progress under
sub work (b)
1.47Km work under allotment, as per sub
work (c)
Bottlenecks
Shifting of 220 / 66 K.V. Gantry poles by
HVPNL and funds of Rs.13.60Crores to be
transferred by DHBVN to HVPNL
Shifting of 220 K.V lines by Underground
cabling by BBMB Ballabgarh and deposit
estimate is yet to be submitted by BBMB
b)
Const. of Road (2 x 12.5m) of
Balance Portion & Cross Drainage
etc. (1.0Km Length)
Rs.980.00Lacs / Rs.783.90Lacs
01.03.2014
46.93
31.12.2015
--
0.67Km earth work completed and
remaining 0.33Km earth work in
progress.
The work delayed due to the agitation