13 Monitoreo y cuantificación de resultados
13.8 Monitoreo y revalidación del escenario de línea base
GOAL
Increase productivity and employment PROBLEM / ISSUES / CHALLENGES
An unemployment rate of 12.60%% as of 2010 based on DOLE-Camanava NCR.
Lack of continuous / sustained system of program to address labor demand and supply linkage and labor market information.
Existence of labor market demand-supply mismatches
Employment opportunities are scarce for those whose education / training does not match industry needs
Skills do not meet the available job requirements (educated unemployed)
Lack of formal industry education to support the identified priority sectors (garment, food, furniture, metal/ steel, etc.)
Set up and improve the necessary infrastructure and other training facilities in the city‟s training center Close monitoring of trainees and trainors
Proliferation of unscrupulous manpower agencies and contracting agencies Labor disputes in the workplace
OBJECTIVES / TARGET SETTINGS
Develop competitive manpower.
Intensify efforts in providing assistance to Out of school youth, women, and OFWs Improve employment levels and access to employment opportunities
To develop strong linkages between the government (local & national) with private sector and other Non-Government Organization (NGO) sectors
Addressing the job and skills mismatch
Support research and development efforts in enhancing competitiveness in various industries Upgrading the necessary infrastructure and support facilities such as:
a. Improvement of training rooms based on TESDA training regulations b. Water supply and proper connections
c. Well functioned drainage and regular cleaning of canals to prevent flooding
Enhancing harmonious relationship between trainees and trainers, supervisors and trainers.
Eradicate illegal recruitment in the city
Enhance the Alternative Dispute Resolution (ADR) mechanisms using conciliation – mediation of labor cases thus enduring tripartite council
Strengthen tripartism to promote industrial peace in the city POLICIES / STRATEGIES
It shall be the policy of the City Government to intensify employment generation, preservation, facilitation and enhancement
Intensify the utilization of Philjobnet system to cover not just job matching facility but to make it as the Labor Market portal of the City Government
CITY PLANNING AND DEVELOPMENT DEPARTMENT Page 41 POLICIES / STRATEGIES (cont‟.)
Implement training programs appropriate to the demand of particular manpower skills based on the TESD Plan
Strengthen linkages with the private sector to monitor labor demand
Minimize wastage in training resources and improve labor productivity through orchestration of activities with the job placement programs / projects of the Public Employment Service Office (PESO) and private enterprises
Focus on programs with high market absorption rate and training in various employment skills Enhance features of establishment accreditation and job vacancy management
Institutionalization of Skills Registry Mapping System
Enhance career advocacy, coaching, and counseling to improve the employability of graduates
Effective gathering of relevant and timely labor market information must be instituted to serve as a guide in formulating relevant plans and policies in resource allocation to ensure the scarce government resource for training are directed into priority areas.
Should offer additional courses in order to meet the demand of different industry and various employment skills. (Carpentry, High Speed, Small Engine Repair, Food Technology, etc.) Additional outreach trainers that can reach out and train in all participating areas / barangay.
Update the learning skills of trainers in their respective field by attending seminars / training / workshop.
In need of trainer who could strengthen / enhance the reading, writing and communication skills of trainees in order to improve their career professionalism.
. Upgrade/ acquire new training equipments needed in different courses offered.
Comfort rooms in the training center should have well functioned drainage and regular water supply Proper water connections to all soft trade courses room. (hairdressing, beauty care, food processing,
commercial cooking and massage therapy)
Renovate the training rooms by dividing into two (2), lecture room and laboratory room.
Training rooms should be adjacent to each other so that the supervisors can easily inspect / monitor their respective trainers and trainees.
Office of the school personnel should be in the training center, so they could attend and be aware of trainers‟ and trainees‟ needs and problems.
Available vehicle and gasoline allowance for outreach services.
. Consultative meeting with all registered contracting and manpower agencies in the area with the end in view of self regulation as illegal practices together with Stakeholders
To lobby with Sangguiniang Panglungsod for the issuance of an ordinance on Anti-Illegal Recruitment.
Establish industrial peace mechanism participated in by barangays, local government, private sector and the Dept. of Labor and Employment.
PROGRAMS / PROJECTS / ACTIVITIES
Proposed Project Regular employment project Job Fairs
Program for Out-of-School Youth Program for OFWs returnees
Special Program for Employment of Students (SPES)
Implementing Agency Labor & Industrial Relations Office-Public Employment Service Office Department of Labor & Employment
Private sector
CITY PLANNING AND DEVELOPMENT DEPARTMENT Page 42 PROGRAMS / PROJECTS / ACTIVITIES (cont‟.)
Proposed Project PHILJOBNET
Career Coaching Seminar
Labor Education for Graduating Students ( LEGS)
Implementing Agency DOLE-Camanava LIRO
Proposed Project Tulong Pang hanapbuhay sa Ating Disadvantage (TUPAD) (Emergency Employment)
Implementing Agency LIRO-PESO TESDA
Proposed Project Youth Profiling for Starring Careers (YP4SC), (VocTech)
Implementing Agency LIRO-PESO TESDA
Proposed Project Registration of TVET Programs
Implementing Agency LIRO-PESO TESDA
Proposed Project Computerization of Labor Demand and Supply Linkage and Labor Market Information
Implementing Agency LIRO-PESO DOLE
Business Sector
Non-Government Organizations Proposed Project Implementation of Skills Registry Mapping System (SRS) down to barangay
levels
Implementing Agency LIRO-PESO DOLE
TESDA
Proposed Project Career orientation seminar for 3rd year high school students Implementing Agency LIRO-PESO
DOLE
TESDA
Proposed Project Updated career pamphlets as in-demand occupation through DOLE Market Information on Job Placements thru:
PESO (Public Employment Service Office)
SPES )Special Program for the Employment of Students)
PRPAS
Job Contracting / Sub-Contracting
Job Fair Implementing Agency LIRO-PESO
DOLE
TESDA
Proposed Project Competency-Based Programs for Registered courses with WTR or NTR Implementing Agency LIRO
DOLE TESDA
Barangay NGOs
Proposed Project Upgrading / rehabilitation of training centers ( North and South Caloocan )
Implementing Agency LIRO-PESO Engineering Dept.
Proposed Project Acquisition of training equipments needed for different courses Implementing Agency LIRO
CITY PLANNING AND DEVELOPMENT DEPARTMENT Page 43 PROGRAMS / PROJECTS / ACTIVITIES (cont‟.)
Proposed Project Creation of Task Force on Anti-Illegal Recruitment Implementing Agency Office of the Mayor
Legal Dept BPO
DOLE Local PNP LIRO
Proposed Project Enactment of the City Ordinance on Anti-Illegal Recruitment Implementing Agency Office of the Mayor
Legal Dept BPO DOLE
Local PNP LIRO
Sangguniang Panglungsod
Proposed Project Seminar / workshop of Caloocan City Tripartite Industrial Peace Council (CCTIPC) members and offices, LRO staff and other stakeholders on conciliation
Mediation technique
Creation of City Industrial Relations Committee
Establishment of Labor and Employment Assistance Desk.
Implementing Agency LIRO DOLE
Barangays Business Sector
CITY PLANNING AND DEVELOPMENT DEPARTMENT Page 44