• No se han encontrado resultados

A summary of the mitigation measures is presented in Tables 6.1. and 6.2. These measures are recommended to ameliorate all the significant impacts of existing facilities and significant associated and potential impacts for the proposed Project.

EIA REVALIDATION FOR FORCADOS-YOKRI INTEGRATED PROJECT (NAG WELLS)

Table 6.1: Mitigation Measures for Existing Impacts of the Project Project

Activity

Environmental

Aspects Description of Impacts

Rating before mitigation Mitigation measures

Rating after mitigation Operations

and Maintenance

Air quality Increase in SPM levels

Increase in Noise

levels M

SPDC shall:

use only pre-mobbed

regularly maintenance of vehicles, vessels, generators and other machines.

use of wet scrubbers for all emission sources Upgrade to high efficiency flare nozzle

L

Surface water Increase in pH, conductivity, TDS, major cations), BOD and COD Increase in Zn, Fe and Cu

Increase in THB, Total coliforms and decrease in dissolved oxygen, phosphate, chloride, sulphate

M

SPDC shall:

treat all effluents to regulatory limits before discharging into the environment.

dispose all waste in line with regulatory approval

activate existing oil spill contingency plans in the event of oil spill.

ensure that disposal of drilling wastes is in line with regulatory standards

activate existing oil spill contingency plans in the event of oil spill.

manage all radioactive wastes according to Nigerian Nuclear Regulatory Agency (NNRA) procedure. Bunkers shall be built where the waste shall be placed. These bunkers shall be inspected by NNRA.

control the rate of release of hydrotest water

L

EIA REVALIDATION FOR FORCADOS-YOKRI INTEGRATED PROJECT (NAG WELLS)

Project Activity

Environmental

Aspects Description of Impacts

Rating before mitigation Mitigation measures

Rating after mitigation ensure that inhibited hydrotest water is properly evacuated out

of site to the appropriate treatment plant Sediment Increase in O&G,

TPH

Increase in Cd, Zn, Cu, Fe, Cr Increase in exchangeable cation

M

SPDC shall:

treat all effluents to regulatory limits before discharging into the environment.

dispose all waste in line with regulatory approval

activate existing oil spill contingency plans in the event of oil spill.

ensure that disposal of drilling wastes is in line with regulatory standards

activate existing oil spill contingency plans in the event of oil spill.

manage all radioactive wastes according to Nigerian Nuclear Regulatory Agency (NNRA) procedure. Bunkers shall be built where the waste shall be placed. These bunkers shall be inspected by NNRA.

control the rate of release of hydrotest water

ensure that inhibited hydrotest water is properly evacuated out of site to the appropriate treatment plant

L

EIA REVALIDATION FOR FORCADOS-YOKRI INTEGRATED PROJECT (NAG WELLS)

Table 6.2: Mitigation Measures for Significant Associated and Potential Impacts of the Proposed Project Project Activity Description of Impact Rating before mitigation Mitigation measures

Rating after mitigation Mobilization Impairment of air

quality from emissions of air pollutants including greenhouse gases

H SPDC shall:

use only pre-mobbed

regularly maintenance of vehicles, vessels, generators and other machines.

use of wet scrubbers for all emission sources use of mufflers for vehicle exhaust.

Upgrade to high efficiency flare nozzle

L

Increase in incidence of STIs including HIV/AIDS

H SPDC shall ensure:

pre-employment and regular medical check-up for project work force

condoms are provided for workers access control into the camp is ensured Health awareness is conducted for workers on the mode of transmission of STIs (including HIV/AIDS)

L

Increase in noise and vibration/levels

H SPDC shall:

L

EIA REVALIDATION FOR FORCADOS-YOKRI INTEGRATED PROJECT (NAG WELLS)

Project Activity Description of Impact Rating before mitigation Mitigation measures

Rating after mitigation use only pre-mobbed and regularly maintained

equipment and vehicles Interference with water

transport

H SPDC shall:

ensure that the cluster is located outside the border of the navigation fairway in keeping with government regulations requiring the fairway to be kept free and open to water transport traffic

ensure that Vessel/boat operators observe recommended speed limits

ensure that only certified vessel/boat operators shall be employed.

L

Kidnappings H SPDC shall:

make adequate security arrangements throughout the activity

ensure that security orientation and awareness is conducted for workforce.

L

Influx of workers into the host Communities/

change in local population

H SPDC shall:

ensure that movement of unauthorized persons into camps is strictly restricted

L

EIA REVALIDATION FOR FORCADOS-YOKRI INTEGRATED PROJECT (NAG WELLS)

Project Activity Description of Impact Rating before mitigation Mitigation measures

Rating after mitigation provide basic recreational facilities for workers

within their camps Changes in culture,

lifestyle and habits

H SPDC shall:

carry out enlightenment campaigns to encourage positive influences on cultural values and healthy lifestyles (e.g. breast-feeding habits, alcohol and drug use, exercise, and high moral values with regard to sexuality etc.) and discourage adverse influences (e.g.

prostitution, drug abuse, alcoholism etc.)

L

Increase in social vices H SPDC shall ensure:

awareness campaign and health education is undertaken in the community

L

Increase in inflation level

H SPDC shall:

enhance the local communities by supporting entrepreneurial skill development through training and empowerment schemes.

L

Pressure on existing infrastructures and utilities

H SPDC shall:

make adequate accommodation arrangement prior to mobilization of workforce to reduce pressure on local housing.

L

Documento similar