• No se han encontrado resultados

4. In case of emergency, does your facility own backup power onsite?

_x_ Yes __ No

a. If yes, how long can the backup generator (or other backup power source) operate without obtaining additional fuel?

b. Approximately what percentage of plant operation will be able to function during this time?

_100___ %

5. Has the facility suffered from any past flooding damage?

__ Yes _x_ No

a. If yes, please describe:

6. Does the facility currently have any protective or precautionary structures to minimize the impacts of flooding? (Examples include sea walls, dikes, bypass systems, etc.)

__ Yes _x_ No

a. If yes, please list what types of protective or precautionary structures below:

7. Any additional comments or information regarding flood vulnerability?

Norwell Water Department

Drinking Water Treatment Facility Flood Vulnerability Survey

Monday, September 17th, 2012

Instructions: Please fill out the following survey questions to the best of your ability and return via email

ASAP to Nicolas Dupuis ([email protected]) at Mass DEP. (Note that a representative of the project will be contacting your facility by phone by Wednesday, September 19th, 2012 to follow up.)

Respondent’s Name: _John R McInnis__________________________ Title: _Water Superintendent___________________________

1. What are your responsibilities at the facility?

Management of public water supply; both treatment and didrtibution.

2. Which of the following best describes your treatment processes?

__ Chemical addition only

__ Conventional filtration (includes conventional clarification/ sedimentation, up flow clarification, dissolved air floatation, or pulsator technology)

_x_ Direct filtration __ Membrane Filtration

3. What is the elevation of the bottom of your finished water storage tank(s)?

_200______ feet above Mean Sea Level (U.S. Geological Survey datum)

4. In case of emergency, does your facility own backup power onsite?

_x_ Yes __ No

a. If yes, how long can the backup generator (or other backup power source) operate without obtaining additional fuel?

b. Approximately what percentage of plant operation will be able to function during this time?

_100___ %

5. Has the facility suffered from any past flooding damage?

__ Yes _x_ No

a. If yes, please describe:

6. Does the facility currently have any protective or precautionary structures to minimize the impacts of flooding? (Examples include sea walls, dikes, bypass systems, etc.)

__ Yes _x_ No

a. If yes, please list what types of protective or precautionary structures below:

7. Any additional comments or information regarding flood vulnerability?

No flood protection is necessary as the lowest elevation of any system facility is 68 ft. ABS

Pleasant Water

Drinking Water Treatment Facility Flood Vulnerability Survey

Monday, September 17th, 2012

Instructions: Please fill out the following survey questions to the best of your ability and return via email

ASAP to Nicolas Dupuis ([email protected]) at Mass DEP. (Note that a representative of the project will be contacting your facility by phone by Wednesday, September 19th, 2012 to follow up.)

Respondent’s Name: ________Liz Sorrell___________________

Title: ________President of the Board of Directors for Pleasant Water, Inc.____________________

1. What are your responsibilities at the facility?

As president of the board, I convene the board to set rates and make policy decisions for the operation of Pleasant Water, Inc.

2. Which of the following best describes your treatment processes?

__ Chemical addition only

__x Conventional filtration (includes conventional clarification/ sedimentation, up flow clarification, dissolved air floatation, or pulsator technology)

__ Direct filtration __ Membrane Filtration

3. What is the elevation of the bottom of your finished water storage tank(s)?

_____12 feet__ feet above Mean Sea Level (U.S. Geological Survey datum)

4. In case of emergency, does your facility own backup power onsite?

x_ Yes __ No

a. If yes, how long can the backup generator (or other backup power source) operate without obtaining additional fuel?

b. Approximately what percentage of plant operation will be able to function during this time?

__100__ %

5. Has the facility suffered from any past flooding damage?

__ Yes _x_ No

a. If yes, please describe:

6. Does the facility currently have any protective or precautionary structures to minimize the impacts of flooding? (Examples include sea walls, dikes, bypass systems, etc.)

_x_ Yes __ No

a. If yes, please list what types of protective or precautionary structures below:

Loagy Bay is 100 feet from the pump house. There is a 12 ft sea wall there.

7. Any additional comments or information regarding flood vulnerability?

In thirty years, there has not been a breach of the sea wall.

Rockport Water Department

Drinking Water Treatment Facility Flood Vulnerability Survey

Monday, September 17th, 2012

Instructions: Please fill out the following survey questions to the best of your ability and return via email

ASAP to Nicolas Dupuis ([email protected]) at Mass DEP. (Note that a representative of the project will be contacting your facility by phone by Wednesday, September 19th, 2012 to follow up.)

Respondent’s Name: __Chris Martin_________________________ Title: __Water Plant supervisor__________________________

1. What are your responsibilities at the facility?

Oversee plant operations and maintenance

2. Which of the following best describes your treatment processes?

__ Chemical addition only

_X_ Conventional filtration (includes conventional clarification/ sedimentation, up flow clarification, dissolved air floatation, or pulsator technology)

__ Direct filtration __ Membrane Filtration

3. What is the elevation of the bottom of your finished water storage tank(s)?

___10____ feet above Mean Sea Level (U.S. Geological Survey datum)

4. In case of emergency, does your facility own backup power onsite?

_X_ Yes __ No

a. If yes, how long can the backup generator (or other backup power source) operate without obtaining additional fuel?

b. Approximately what percentage of plant operation will be able to function during this time?

__50__ % (one plant of the two)

5. Has the facility suffered from any past flooding damage?

__ Yes _X_ No

a. If yes, please describe:

6. Does the facility currently have any protective or precautionary structures to minimize the impacts of flooding? (Examples include sea walls, dikes, bypass systems, etc.)

__ Yes _X_ No

a. If yes, please list what types of protective or precautionary structures below:

7. Any additional comments or information regarding flood vulnerability?

Typically outages in the winter.

Westport Senior Village

Drinking Water Treatment Facility Flood Vulnerability Survey

Monday, September 17th, 2012

Instructions: Please fill out the following survey questions to the best of your ability and return via email

ASAP to Nicolas Dupuis ([email protected]) at Mass DEP. (Note that a representative of the project will be contacting your facility by phone by Wednesday, September 19th, 2012 to follow up.)

Respondent’s Name: ___Michael Bizsko________________________ Title: __VP__________________________

1. What are your responsibilities at the facility?

Administrative

2. Which of the following best describes your treatment processes?

__ Chemical addition only

__ Conventional filtration (includes conventional clarification/ sedimentation, up flow clarification, dissolved air floatation, or pulsator technology)

_X_ Direct filtration __ Membrane Filtration

3. What is the elevation of the bottom of your finished water storage tank(s)?

____94___ feet above Mean Sea Level (U.S. Geological Survey datum)

4. In case of emergency, does your facility own backup power onsite?

_X_ Yes __ No

a. If yes, how long can the backup generator (or other backup power source) operate without obtaining additional fuel?

______ days ______ hours continuous

b. Approximately what percentage of plant operation will be able to function during this time?

__100__ %

5. Has the facility suffered from any past flooding damage?

__ Yes _X_ No

a. If yes, please describe:

6. Does the facility currently have any protective or precautionary structures to minimize the impacts of flooding? (Examples include sea walls, dikes, bypass systems, etc.)

_X_ Yes __ No

a. If yes, please list what types of protective or precautionary structures below:

Pumps tied into floats, alarm, generator.

7. Any additional comments or information regarding flood vulnerability?

Pinewoods Camp, Inc.

Drinking Water Treatment Facility Flood Vulnerability Survey

Monday, September 17th, 2012

Instructions: Please fill out the following survey questions to the best of your ability and return via email

ASAP to Nicolas Dupuis ([email protected]) at Mass DEP. (Note that a representative of the project will be contacting your facility by phone by Wednesday, September 19th, 2012 to follow up.)

Respondent’s Name: Anthony Baker___________________________ Title: _operator___________________________

Documento similar