• No se han encontrado resultados

Nuevas perspectivas en la educación de las personas sordas: El Bilingüismo

W. Stokoe, profesor de inglés y miembro del Linguistic Research Laboratory de Washington, publicaba, en 1960, Sign Language Structure: An outline of the visual

I.2.2. Nuevas perspectivas en la educación de las personas sordas: El Bilingüismo

3 4

As in item 714 above but from 1.5m to 3.0m. (5'-10').

Contractor's profit @ 10% on Rs. 39.50

Total

717-

Sinker per day 2 no. Well sinker

Skilled labour per day 2 no.

Coolie per day 10 no. 100.00

T&P and load etc. L.S.

Contractor's profit @ 10% on Rs. 56.00

Total

718-

Sinker per day 3 no. Well sinker

Skilled labour per day 2 no.

Coolie per day 10 no. 100.00

T&P and load L.S.

Contractor's profit @ 10% on Rs. 71.00

Total

719-

Sinker per day 2 no. Well sinker

Mate with driver per day 1 no. 110.00

Skilled labour per day 4 no.

Driver per day 1 no. 400.00

T&P and load etc.

Contractor's profit @ 10% on Rs. 88.00

Total 719-(a)

(b)

Soft Clay 25% Hard clay 50% Kankar shingle 0.75

For the diametra (External) other than above the rates shall be calculated proportionatly to their areas.

For soils other than the average soil as indicated above an increase as given below shall be allowed according to the nature of the soil and work.

As in item 714 above but from 12m to 15m. (40'-50'). As in item 714 above but from 7m to 9m. (20'-30').

Sl. No. Item of Work Rate 1 2 5.00 725-

C.P. Teak Block 3"x3"x4.5" per cft. 3/128 cft.

Cement per 50 kg. bag 0.5 bag

Coarse sand per % cft. 0.03 cft.

Mason per day 1/25 no. 160.00

Beldar per day 1/25 no. 100.00

Contractor's profit @ 10% on Rs. 1.33

Total

726-

Cost of 12 cleats Teak wood blocks each 12 nos.

Teak plates 4"x4"x3/8" per cft. 1/20 cft.

Brass cleats per doz. 1 doz.

Iron screws 2.5" per doz. 1 doz.

Brass screws1" per doz. 2 doz.

Carpenter per day 0.50 no. 160.00

Cement mortar and fixing. Same as in item (725) 0.51x12

Contractor's profit @ 10% on Rs. 45.71

Total

727-

As in item 726

Deduct difference in cost of brass and iron cleats L.S.

Total

728-

Rate for cotton cord per kg. 1 kg.

Fixing charges L.S.

Contractor's profit @ 10% on Rs. 7.75

Total

729-

Details of 12 cleats. Teak wood 12x0.5"x3"x2"

per cft. 1/6 cft.

Brass hinges 2" per doz. 1 doz.

Carpenter per day 1/3 no. 160.00

Brass screws 1" per doz. 4 doz.

Contractor's profit @ 10% on Rs. 29.99

Total

730-

Cost of 6' pipe each 5 nos.

Add for M.S. clamps each 5 nos.

Cement mortar L.S.

Fitter per day 1/4 no. 110.00

CHAPTER - 19

Blocks of C.P. Teak 8cmx8cmx12cm (3"x3"x4.5

"

) supplied & fixed in wall with & including cement and approved coarse sand mortar in the proportion of 1.3 and including making a hole for the same.

Unit

3 4

Supply and fixing of 10cm(4") internal dia. A.C. down pipes complete with rose head., bends and gratings & includings supply of necessary M.S. clamps 2.5cmx3mm(1"x1/8") fixed to walls, with & including supply of 15cm. (6") long 6mm(1/4") dia, nails & including supply of all materials, labour and T&P etc. required for proper completion of the work and also inclucing repair of plaster, pointing etc. if damaged during fixing of pipes. Details of 30' length.

MISCELLANEOUS

Qnty

Supply of approved brass cleats for clerestory window cords including their fixing to Teak wood plates 10cmx10cmx1cm (4"x4"x3/8") over blocks of C.P. Teak 8cmx8cmx12cm (3"x3"x4.5") supplied and fixed in wall with & including cement & approved coarse sand mortar in proportion of 1:3 and screws etc. and including making a hole for the same.

As in item 726 but with approved oxidised iron cleats.

Supply of cotton cord for clerestory window including fixing in position.

Supply and fixing of C.P. Teak wood doors and windows cleat 10cmx7.5cmx5cm(4"x3"x2") with 5cm. (2") brass hignes including fixing & supply of screws bings & including supply of all materials, labour & T&P etc. required for proper completion of the work.

Mason per day 3/4 no. 160.00

Beldar per day 1 no. 100.00

Contractor's profit @ 10% on Rs. 83.37

Total

(b) Shoes, shoe each 1 no.

Holder label 1 no.

Contractor's profit @ 10% on Rs. 5.00

Total

(c) Head including rose each 1 no.

Carriage and fixing charges L.S. Contractor's profit @ 10% on Rs. 6.18

Total

(d) Bends, Construction of Bends each 1 no.

Carriage and fixing charges L.S. Contractor's profit @ 10% on Rs. 5.00 Grand total (a+b+c+d)

Total

731-

Teak wood 1x5/2x4/12x1/12 per cft. 0.07 cft.

Brass hole peg each 3 nos.

Brass screws 3/4" per doz. 6 nos.

Carpenter per day 1/12 no. 160.00

Beldar per day 1/12 no. 100.00

Teak wood block 3"23"24½

"

(two) per cft. 3/64 cft. Cement mortar and labour L.S.

Sundries L.S.

Contractor's profit @ 10% on Rs. 9.45

Total

732-

Details of cost per % cft.

Fire clay bricks per % 1300 no.

Fire clay mortar per cwt. 14 cwt.

Sundries L.S.

Mason per day 4 no. 160.00

Beldar per day 2 no. 100.00

Bhisti per day 1/4 no. 130.00

Sundries T&P etc. L.S.

Contractor's profit @ 10% on Rs.1352.31 Total 733- Styles 1x4x6⅔x1/4x1/8 = 0.83 Rails 1x4x5x1/4x1/8 = 0.63 Panels 3x3x2x1.5x5/96 = 1.41 Add wastage 10% on 2.87 = 0.29 Total = 3.16 3.16 cft. Carriage L.S.

Carpanter per day 3.50 no. 160.00

Beldar per day 1.50 no. 100.00

Providing & fixing at site 4cm. (1.5") C.P. Teak wood panelled partition complete with teak wood frames 10cmx8cm(4"x3") top botton and side vertical at 1.5m (5') apart including supply of all brass screws, cleats, bolts, etc. all materials, labour and T&P etc. required for proper completion of the work. Details of cost for partitions of panels 6'-8' high and 5" wide 6⅔x5=33.33 sft. materials. Supply and fixing of C.P. Teak wood per rack (8cmx8cmx2.5cm)(3"x3"x1") over blocks of C.P. Teak 8Cmx8cmx12cm(3"x3"x4.5") with three brass pegs of approved design supplied and fixed in wall with & including cement & approved coarse sand mortar in the proportion of 1:3 and screws etc. & including making a hole for the same.

Fire bricks laid in fire clay mortar including supply of fire bricks and fire clay, labour and T&P etc. required for proper completion of the work .

Mistri per day 1/8 no. 170.00

Carpanter per day 1.75 no. 160.00

Screws etc. L.S. Contractor's profit @ 10% on Rs.178.21 Total 2x15"4/12"x3/12" = 2.5 4x6⅔x4/12x3/12 = 2.2 Wastage 10% on 4.7 = 0.5

As per item no. 401 = 5.2 per cft. 5.2 cft. Add cost of bolts etc. L.S.

Total

734-

Details of cost for 12'x7' = 84 sft. Deodar wood 3x12x1/6x1/24 = 0.25

4x6¾x1/24 = 0.19 Wastage 5% on 0.44 = 0.02

Total = 0.46 sft. 0.46 cft.

Carriage L.S.

Plain asbestos sheets 1/4" thick = 84sft.

Wastage 5% per sft. 88.2 cft.

Carriage L.S.

Carpanter per day 1.33 no. 160.00

Mason per day 1 no. 160.00

Beldar per day 1.50 no. 100.00

Sundries screws L.S.

Contractor's profit @ 10% on Rs. 111.44

Total

As per item no. 404 per cft. 5.2 cft.

Add cost of bolts etc. L.S.

Total

735- As in item 734 above but with masonite board partition as above

Add extra cost of masonite board including contractor's prolit @ 10%

Total

Teak wood frames 4"x3" take a length of 15" (As per item of straight works in wood work).

Providing & fixing plain asbestos sheets partition with 5cmx1cm )2"x3/8") deodar or Shisham wood beading including erection & fixing complete with deodar or shisham frames 10cmx8cm(4"x3") top bottoms and sides verticals at 1.5m(5') apart & including supply of all screws, bolts, nuts and cleats etc. all materials, labour and T&P etc. required for proper completion of work.

Sl. No. Item of Work Rate 1 2 5.00 751-

Beldar for cris cross lines and sweeping and

taking out kankar dug per day 2 nos. 100.00

Preparing earth & making medhi mazdoor per day 1 no. 100.00

Opening out stack & sooting into sizes beldar

per day 2 nos. 100.00

Mazdoor per day 2 nos. 100.00

Carriage of kankar & spreading on surface,

Mazdoor per day 4 nos. 100.00

Hand packing Beldar per day 6 nos. 100.00

Supply of water, Mazdoor per day 8 nos. 100.00

Consolidation Head Hammer man per day 1 nos. 105.00

Hammer man per day 11 nos. 105.00

Basi chot Beldar per day 2 nos. 100.00

Leak katai L.S. T&P and night light L.S.

Contractor's profit @ 10% on Rs. 120.25

Total

752-

Add for hire charges of roller per day 1 no.

Steam coal per day 1/4 nos.

Beldar per day 2 nos. 100.00

Contractor's profit @ 10% on Rs. 6.50 except on roller & coal

Total

753-

Beldar per day 0.50 nos. 100.00

Contractor's profit @ 10% on Rs. 1.62

Total

754-

Add difference in item 755/756

Total

755-

10% contractor's profit Beldar per day 3/4 nos. 100.00

Add for extra coat to be used L.S. Contractor's profit @ 10% on Rs. 2.94

Total

Extra for labour for providing building materials in excess including. As in item no. 752 above but 8cm. (3") thick coat of brick ballast. As in item 753

As in item 752 above but for 12cm. (4.5") thick stone ballast. As in item 752

As in item 752

Extra for labour for providing building materials.

Consolidation of kankar by hand rammers including opening out stacks, sorting kankar into three sizes repairing patch in existing road surface with kankar, picking up old surface, spreading kankar, making medhi to retain water and ramming and also including carriage of metal upto 30m (100'). Carriage of water 200m. (1 furlong) supply & maintenance of barrier, caution posts, light at night & including all T&P etc. required for proper completion of the work, kankar to be supplied to the contractor free at site.

Taking up a length of 220'x12'=2640sft. Kankar required 2640x3/8 = 990cft.

As in item 751 above but for consolidation by R/R including hire and fuel of the roller. As in item 751

CHAPTER - 20

Unit Qnty

3 4

Deduce for labour involved in consolidation (A)

As in item 752 above but for 12cm. (4.5") thick coat of brick ballast.

ROAD WORK

756-

For ctis cross lines, sweeping and taking out

kankar dug. Beldar per day 2 nos. 100.00

Preparing earth & making medhi mazdoor per day 1 no. 100.00

Opening out stack, carriage and spreading on

raod surface : Beldar per day 3 nos. 100.00

Hand packing Beldars per day 8 nos. 100.00

Supply of water, Mazdoor per day 6 nos. 100.00

Consolidation Roller charges per day 1 day

Coal per ton 1/6 ton

Beldar per day 2 nos. 100.00

Binding Beldar per day 2 nos. 100.00

Leak katai L.S.

T&P night lanterns L.S.

Contractor's profit @ 10% except on coal and roller i.e. on Rs. 77.25

Total

757-

Beldar per day 3/4 no. 100.00

Contractor's profit @ 10% on Rs. 2.68

Total

758-

Royalty to villagers

Indication (digging) per day 1/8 no.

Beldar per day 4 nos. 100.00

Coolie per day 3 nos. 100.00

For hundred cft. Kankar 110 cft. of kankar as the quary will have to be dug.

Total

759-

Mason per day 3/4 no. 160.00

Coolie per day 3/4 no. 100.00

Sundries L.S.

Contractor's profit @ 10% on Rs. 6.50

Total

760-

Mate per day 1 no. 110.00

Beldar per day 9 nos. 100.00

Contractor's profit @ 10% on Rs. 32.75

Total

761-

Paint (Road marking paint) per litre 4.5 litre

Painter per day 5 no. 140.00

Beldar per day 5 no. 100.00

Sundries L.S.

Contractor's profit @ 10%

Total

As in item 752 above but for 6cm (2.3") to 8cm. (3") thick, stone ballast. Consider a length of 220 rft. Materials required = 220x12x0.3=660 cft.

Water allowance to be allowed on item no. 751 to 756 between 15 Nov. to 31 May.

Digging kankar including breaking, cleaning and royalty as well as the cost of boring to fined kankar strata excluding cartage and proper stacking.

Making mud tree guards 1 m (3'-4') internal diameter and 1m (3'-4') high above ground level.

Dag-belling 15cm. (6") deep in one line aligned, with flags and jhandies as directed by th Engineer-in-charge.

Painting white traffic lines 8cm. (3") wide in three coats with approved road marking paint (spirit base) as directed by the Engineer- on-charge, including all materials, labour and T&P etc. required for proper completion of the work. Take an area of 100 sft. lines.

762-

Bricks per %o 350 nos.

Rate of preparing subgrade and laying as per per day 5 no. Contractor's profit @ 10% on Rs. 19.25

Total

Bricks per %o 550 nos.

Rate of preparing subgrade and laying as per per day 5 no. Contractor's profit @ 10% on Rs.30.25

Total

763-

As item no. 762(b) above

Extra cost of labour and 10cft. Local sand, including Contractor's profit @ 10% ( Rs. 3.00+1.00+0.40)

Total

764-

Mate per day 1 no. 110.00

Diggers per day 10 no.

Dressers per day 2 no.

Coolie per day 12 no. 100.00

Baskets per no. 4 no.

String L.S.

Coal per ton 1/6 ton

Beldar per day 2 nos. 100.00

T&P L.S.

Contractor's profit @ 10% Rs. 78.25

Total

765-

Bricks per %o 8/5 no.

Mason per day 1 no. 160.00

Beldar per day 1 no. 100.00

Coolie per day 2 no. 100.00

Coolie per day 2 no. 100.00

T&P Baskets and other sundries L.S. Contractor's profit @ 10% Rs. 72.50

Total

766-

Screeing Coolie per day 1/5 no. 100.00

Coolie per day 1/5 no. 100.00

Stacking Beldar per day 1/2 no. 100.00

Sundries L.S.

Dressing, levelling, side berms, including filling.

Renewing patries 3metre (10') wide including dressing surface filling upto 8cm. (3") depth and making namunas at every 15cm. (50') apart on either side of the road true to patri template with side slopes 1:2 etc. for taking the earth to be so dug that they form a continuous side drain at road boundry. Take a length of 1 furlong.

Bricks edging on both sides of the road of first class bricks 8cm. (3") wide and 12cm. (4.5") deep laid with mud mortar including labour & supply of bricks finished to required template and in proper alignment and also including dressing & ramming the excavated earth as directed by the Engineer-in-charge. Take a stip of 0.5 furlong 2x330=660 rft.

Dressing and throwing surplus materials includings stacking of road materials.

Stacking of road metal to the required templete after screening at road side including dressing of side berms as required, where metal is to be stacked and including a lead upto 60 metres (200').

(b) As in item 762(a) but with bricks laid on edge.

Bricks on edge pavement on patries with bricks laid dry, joints filled with local sand including preparation of base to proper slope and its ramming, spreading a layer of 1cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour and T&P etc. required for proper completion of the work.

(a) Brick soling with straight overburnt bricks laid flat and dry including preparation of subgrade to prescribed cambre and including supply of bricks, filling joints with local earth spreading a blinding coat of 1cm. (3/8") depth of local earth of P.I. 5 to 7 or sand over the entire surface & including labour & T&P etc. required for proper completion of the work.

Contractor's profit @ 10% Rs. 2.82

Total

767-

Cleaning grit : Mazdoor per day 1 no. 100.00

Cleaning sub-grade : Mazdoor per day 10 no. 100.00

Coolie per day 8 no. 100.00

Tar heating & spreading on road: Hot Belder per day 7 no.

Grit spreading Beldar per day 5 no. 100.00

Diversion watering : Beldar per day 2 no. 100.00

Misce. : Mate per day 1 no. 110.00

Work agent per day 1/2 no.

Tar boiler man & Fireman per day 1 no.

Sundries L.S.

Total

768-

769-

(As per item no. 767).

Deduct labour for heating paint not required in this operation as in item 767

Extra labour required for operation L.S.

Total

770-

bitumen ½ furlong

Deduct less labour required for heating Tar-

beldar per day 4 no. 100.00

Total

771-

772-

Beldar per day 1 no. 100.00

Contractor's profit @ 10%

Total

773-

Stone ballast 1.5" gauge per cft. 119 cft.

Coarse sand per % cft. 60 cft.

Cement bag per 50 kg. bag 25 no.

Empty bag each 15 no.

Tar and other side forms etc. L.S.

Laying of C.C. and putting forma and temping

etc. Mistri per day 1/6 no. 170.00

Mason per day 2 no. 160.00

Mate per day 1 no. 110.00

Laying C.C. Road slab 10cm. (4") thick consisting of 1:2:4 cement, coarse sand & approved 4cm. (1.5") gauge stone ballast, over prepared sub grade after its rectifications & bringing it to proper camber & including supply of all meterials, labour and T&P etc. required for proper completion of work, finished to required templete as directed by Engineer-in-charge but excluding cost of metal required for rectification of the subgrade. Take a slab length of 33rft. & 4' in depth. qnty. of work involved 33x1.2x1/3=132 cft. As in item 767 above but cold cmulsion in 2nd coat painting with bitumen covering on furlong.

As in item 767 above but with tar in first coat painting with

As in item 767 but with Tar in 2nd coat or other subsequent coats of painting over previously painted surface. The above labour will make an output double the area i.e. the same labour can do the painting of one furlong. Hence rate for % sft. = 1.30 or Rs. 0.14 per sq.m.

Scrapping old painted surface including disposal of all scraped material to a distance of 30m. (100') as desired by Engineer-in- charge.

Bitumen painting (labour only) over W.B. surface (1st coat) excluding supply of paint & grit including maintenance of side parties and watering them during operation for proper completion of the work as directed by Engineer-in-charge and excluding roller charges and its fuel but including the wages of fire-man & tar-boiler man.

Take a strip of 0.5 furlong area 330x12=3960 sft.

As in item 767 above but subsequent coat or painting over previously painted surface. The above labour will make an output of double the area i.e. the same labour can do the painting of 1 furlong. Hence rate for % sft. 3 00/2 = Rs. 1.50 or Rs.0.16 per metre.

Beldar per day 12 no. 100.00

Coolie per day 2 no. 100.00

Sub grade rectification etc. Mason per day 1/2 no. 160.00

Beldar per day 1 no. 100.00

Coolie per day 1 no. 100.00

Curing : Mate per day 1 no. 110.00

Coolie per day 8 no. 100.00

Diversion : Beldar per day 1 no. 100.00

Chowkidar per day 2 no.

Misce.: Supervision W/Agent per day 1/3 no.

Driver C.C. Mixer etc. per day 1/6 no.

Cleaner per day 1/6 no.

Beldar per day 3 no. 100.00

Coolie per day 3 no. 100.00

Water Charges 1.5% on Rs. 656.16 Contractor's profit @ 10% on 147.00

Total

774-

As in item no. 773 including forms work Contractor's profit @ 10%

Total

775-

Rate for earth work per cft. 300 cft.

Add 50% for small work

Total

776-

Take a length of one furlong : Earth work to be done (average) say 380 cft.

Rate for earth work per cft. 380 cft.

Add 50% for small work

Total

777-

Add 25% for other cracks = 40 nos Total : 200

nos. say 200 joints would be attended to Mate per day 3/4 no. 110.00

Beldar per day 6 no. 100.00

Coolie per day 1 no. 100.00

Contractor's profit @ 10% Rs. 24.62

Total

778-

Mate per day 1/30 no. 110.00

Beldar per day 4/15 no. 100.00

Coolie per day 1/10 no. 100.00

Contractor's profit @ 10% Rs. 1.24

Total

Joint and other small cracks filling in C.C. miles after racking out the joints & removing the old Tar and other material with suitable materials as directed by Engineer-in-charge (Labour only) Total Joints at every 33' joints to be filled would be 5280/33 = 160 nos.

Consolidation of kankar in patch repair from 1st June to 14 Nov. by hand rammer including opening out stacks, picking out old surface upto 8cm (3") in a rectangular form, making 5cm. (2") wide drain around the patch upto depth of 12cm. (4.5") including carriage of kankar and water, but exclucding supply of kankar & including stacking the unserviceable materials & basi-chot next day & blinding the same as directed by the Engineer-in-charge. Take a patch of 5'x5' fresh metal to be used 5x5x1/4'=6.3 cft. As in item no 773 above but excluding supply of cement coarse sand & stone ballast (labour only)

Blinding of water bound stone or kankar lime with local earth by spreading evently to an average depth of 1.5 cm (9/16") & filling the intersticks of the road metal. The trenches to be so dug for taking the earth that they form continuous side drain at road boundary. Take a length of one furlong 1x660x12x1/24=330 Say 300cft.

Earth work in edging of the painted of C.C. miles in a width of 0.5m. (20") on either side according to patri template including dressing ramming etc. The trenches to be so dug for taking the earth that they form a continuous side drain at road boundary.

779-

As in item no. 778

Add for water allwoance as in item 757

Total

780-

Mate per day 1 no. 110.00

Beldar per day 4 no. 100.00

Coolie per day 4 no. 100.00

Total

781-

Labour for cleaning : Mazdoor per day 6 no. 100.00

Coolie per day 6 no. 100.00

Tack coat heating & spreading:Beldar per day 4 no. 100.00

Premixing, screening grit : Beldar per day 1 no. 100.00

Heating the tar & mixing grit : Beldar per day 5 no. 100.00

Coolie per day 3 no. 100.00

Spreading the premix & making into camber

Beldar per day 15 no. 100.00

Diversion & watering : Mazdoor per day 2 no. 100.00

Misc.: Mate per day 2 no. 110.00

W/Agent per day 1 no.

Tar, Bitumen and fireman per day 2 no. 105.00

Sundries cartage and other T&P etc.L.S.

Total

782-

Mate per day 1 1/4 litre 110.00

Beldar (Hot) per day 4 no. 100.00

Coolie per day 4 no. 100.00

Sundries L.S.

Total

783-

Labour for cleaning : Mazdoor per day 2 no. 100.00

Coolie per day 2 no. 100.00

Heating and spreading : Beldar per day 4 no. 100.00

Screening graded grit 1/4" : Beldar per day 1 no. 100.00

Spreading grit : Beldar per day 2 no. 100.00

Misc.: Mate per day 1 no. 110.00

Work Agent per day 1/4 no.

Tar, Boilerman and fireman per day 1 no.

Sundries cartage and other T&P etc.L.S.

Total

784-

As in item no 778 above but from 15 nov. to 31 may.

Hence consumption per mile per month = 270x12=22.50 cft. Say 25 cft.

Cleaning of existing painted surface & laying premix 2cm. (3/4") thick over a tack coat with graded approved grit & bitumen (Labour Only) including heating the paint to required temp. mixing either in mixer or in hand drum including cartage of material maintenance of side patries & watering them during operation for proper completion of work as directed by the Engineer-in-charge. Take a