• No se han encontrado resultados

Origen de los mecanismos de tolerancia al daño y resistencia a la

Capítulo I – Estomatópodo

I.II – Estomatópodo golpeador

I.II.III Origen de los mecanismos de tolerancia al daño y resistencia a la

Schedule showing approximate quantity to be brought by the Contractor for this work. Sr.

No.

Name of Material Approximate Quantity Remarks 1) Approximate quantity of Bitumen 60/70 grade = 42.328 M. T. 1) All materials to be procured by the contractor at his own risk and cost. 2) The grade of bitumen to be used for this work shall be as per specification.

3) The Physical properties shall be confirm with MORTH / IS & IRC specification.

4) Stipulated test shall be carried out.

5) Custody of material shall be sole.

2) Cement = NIL M. T.

3) Steel (HYSD/ TMT) = NIL

Note: - Bulk Asphalt 60/70 grade shall be procured only from reputed Govt. refinery.

Condition: - Condition for material brought by the contractor is attached separately.

Executive Engineer Public Works (West) Division, Aurangabad

ADDITIONAL CONDITIONS FOR MATERIALS (CEMENT, M.S. BARS, H.Y.S.D. BARS, ETC)

BROUGHT BY CONTRACTOR

1 All materials as cement, Mild Steel, HYSD Bars, Bulk Asphalt, etc.

required for execution of work shall be brought by Contractor at his own cost.

2 The contractor shall maintain the record of these materials (Cement,

Steel, Bulk Asphalt, etc.) in the prescribed proforma and registers, as directed by Engineer-in-charge. The sample of prescribed proforma is attached at the end (Page No. 184 to 188). These registers shall be signed by both contractor and representative of Engineer-in-charge. These registers shall be made available for inspection, verification for the department as and when required. These registers shall be in the custody of department and shall be maintained by the department.

3 The material required only for this work shall be kept in the godown at

site. No material shall be shifted outside the godown, except for the work for which this agreement is entered without prior approval of the Engineer in charge.

4 The materials i.e. cement, steel, bulk asphalt, etc. brought on the

work site shall be accompanied with the necessary Company / Manufacturing firm’s test certificates. In addition these materials shall be tested as per frequency prescribed by the Department and the cost of such testing shall be borne by the contractor. If the test results are satisfactory, then, and then only the material shall be allowed to, be used on the work. If the test results are not as per standards, these materials shall be immediately removed from the work site at contractor’s cost. In case of cement, if so requested by the contractor in writing, material will be allowed to be used before receipt of the test results but this will be entirely at the risk and cost of the contractor.

5 All these material i.e. cement, steel, bulk asphalt, etc. shall be

protected from any damages, rains, etc. by the contractor at his own cost.

6 The contractor will have to erect temporary shed of approved

specifications for storing of above materials at work site at contractor’s cost having double lock arrangement (by double lock it is meant that godown shall always be locked by two locks, one lock being owned and operated by contractor and other by Engineer-in-charge or his authorized representative and the door shall be open able after both locks are opened)

7 If required, the weighment of cement bags/steel, bulk Asphalt, etc. brought by the contractor shall be carried out by the contractor at his own cost.

8 The contractor shall not use cement and other material for the item to

be executed outside the scope of this contract except for such ancillary small item as are connected and absolutely necessary for execution of this work as may be decided by the Engineer-in-charge.

9 The Government shall not be responsible for the loss in cement and

steel etc. during transit to work site. The cement brought by the contractor at the work site store shall mean 50kg, equivalent to 0.03467 cubic meters per bag by weight. The rate quoted should correspond to this method o reckoning. In case of ordinary / controlled concrete, if cement is found short, the shortage / shortages will be made good by the contractor at his cost.

10 Indemnity:-

The condition regarding indemnity as defined on page 95 at Sr. No. 4 will apply mutates in case of material brought by contractor at the site of the execution of the work being executed under this contract.

11 In case the materials brought by the contractor become surplus owing

to the changes in the design of the work, the material should be taken back by the contractor at his own cost after prior permission of Engineer-in-charge.

12 All empty bags or empty asphalt drums shall be the property of

contractor and the same shall be removed immediately after completion of work.

13 Bulk asphalt 60/70 grade shall be procured from reputed Government

refinery.

14 RCC Hume pipes of ISI mark required for the construction of CD work

(whichever in this work) should be purchased by the contractor from MSSIDC only.

15 The asphalt 60/70 grade should be procured from reputed

Government refineries (main producers) only like BPCL, HPCL, IOC.

16 The contractor shall produce sufficient documentary evidence

alongwith bill i.e. bill for the purchase, Octroi receipt, gatepass, etc for the purchase of material brought on the work site at once, failing to which the Executive Engineer will not make payment to contractor.

17 `äöEäònùÉ®ú (contractor)=i{ÉÉnùEò b÷ÉÆ¤É®ú Ê®ú¡òɪÉxÉ®úÒiÉÚxÉ |ÉÉ{iÉ Eò®úhÉÉ®ú +ɽäþ (nÖùªªÉ¨É

=i{ÉÉnùEòÉ EòbÚ÷xÉ +lÉ´ÉÉ +xªÉ EÆòjÉÉ]õnùÉ®úÉÆEòbÚ÷xÉ b÷ÉÆ¤É®ú PÉähªÉÉSÉÒ {É®ú´ÉÉxÉMÉÒ xÉɽþÒ). +¶ÉÉ

b÷ÉÆ¤É®ú |ÉÉ{iÉÒSÉä ´Éä³ýÉ{ÉjÉEò (Schedule of arrival of bouzers) IÉäÊjɪÉ

+ÊvÉEòÉ−ªÉÉÆxÉÉ näùhÉä `äöEäònùÉ®úÉºÉ ¤ÉÆvÉxÉEòÉ®úEò ®úɽþÒ±É. b÷ÉÆ¤É®úÉSÉä |ÉÉ{ÉhÉ (procurement)

ºÉ®úEòÉ®úÒ iÉä±É EÆò{ÉxªÉÉÆSªÉÉ Ê®ú¡òɪÉxÉ®úÒ ¨ÉvÉÚxÉ Eò®úhªÉÉiÉ ªÉÉ´Éä. iɺÉäSÉ {±ÉÉÆ]õ´É®ú |ÉÉ{iÉ

ZÉɱÉ䱪ÉÉ b÷ÉÆ¤É®úÉSÉÒ |ÉiÉ (Grade) iÉ{ÉɺÉhªÉɺÉÉ`öÒ +ɴɶªÉEò ={ÉEò®úhÉä, ºÉÉʽþiªÉ,

<iªÉÉËnùxÉÒ ªÉÖCiÉ |ɪÉÉäMɶÉɳýÉ ={ɱɤvÉ Eò¯ûxÉ näùhÉä `äöEäònùÉ®úÉºÉ ¤ÉÆvÉxÉEòÉ®úEò ®úɽþÒ±É.

VÉÉä{ɪÉÇxiÉ EÆòjÉÉ]õnùÉ®ú ¨ÉÖ³ý MÉä]õ{ÉÉºÉ ={ɱɤvÉ Eò®úiÉ xÉɽþÒ iÉÉä{ɪÉÇxiÉ b÷ÉÆ¤É®úÒEò®úhÉÉSªÉÉ

¤ÉɤÉÒSÉÒ +nùɪÉMÉÒ Eò¯ûxɪÉä. ¨ÉÖ³ý MÉä]õ{Éɺɴɮú EòɪÉÇEòÉ®úÒ +Ê¦ÉªÉÆiÉÉ ªÉÉÆxÉÒ º´ÉÉIÉ®úÒ PÉä>ðxÉ

iÉä +ʦɱÉäJªÉÉiÉ VÉÉäb÷hÉä +ÊxÉ´ÉɪÉÇ ®úɽþÒ±É. iÉnÂùxÉÆiÉ®úSÉ b÷ÉÆ¤É®úÒEò®úhÉÉSªÉÉ ¤ÉɤÉÓSÉä näùªÉEò

+nùÉ Eò®úhªÉÉiÉ ªÉä<DZÉ.

{ÉÖÆVÉÒiÉ b÷ÉÆ¤É®úÉSÉÒ +É´ÉEò +ÉÊhÉ JÉ{É ªÉÉÆSÉÉ JÉ{É nùÉJÉÊ´ÉhÉÉ®úÒ xÉÉånù´É½þÒ Gò¨ÉÉÆEò 1