• No se han encontrado resultados

Proceso de acondicionamiento de aire para el túnel de secado

Component Detail Include/

exclude

Justification Entities

Agents Quantity: depends on agent type

Include One per system or one per entity/resource

Other: bundling of methods

Include Visually grouping of methods represents (functionality of) agent Docks Quantity: model input Include Model input.

Attribute: (un)loading time

Include Model input. Determines (un)loading time of one pallet Attribute: station type Include Switches dock between loading

and unloading

Attribute: failure EXCLUDE Assumed that loading/unloading never fails or gives delays

Attribute: occupied Include Shows whether dock is scheduled for a job or is currently processing a job

Parking areas Quantity: 3 (AGV, A/D & ET).

Include Responses: A/D parking, Empty Trailer parking and AGV parking utilization

Quantity: depends on input

Include Model input. Number of parking slots per parking area

Tracks Quantity: determined by guide-path design

Include Represents guide-path design

Attribute: length Include Model input

Attribute: curve Include Connects horizontal tracks with vertical tracks

Attribute: direction Include Determines difference between unidirectional and bidirectional tracks

Attribute: capacity EXCLUDE The Conflict Manager should handle collisions/congestion Semi-trailers Quantity: model input Include Model input

Arrival pattern: real life arrivals

EXCLUDE Data not available. Instead include probability density function (e.g. Poisson) Departure pattern: real

life departures

EXCLUDE Data not available. Instead use check whether all cargo assigned to a departing transport has arrived, then depart.

Attribute: consolidation Include Determines how many cargo (e.g. pallets) a semi-trailer contains and where it should go within the cross-dock

Attribute: trailer ID Include Assigns unique ID to semi-trailer Attribute :type of

movement

Include Shows whether semi-trailer is arriving, departing or is moving empty

Attribute: arrival dock Include Shows which unloading dock is assigned to a semi-trailer (uniform distribution)

Attribute: departure dock

Include Shows which loading dock is assigned to a semi-trailer Attribute: Arrival

parking

Include Shows which parking slot is assigned to a semi-trailer when arriving

Attribute: ET parking Include Shows which parking slot is assigned to a semi-trailer at the Empty Trailer parking

Attribute: Departure parking

Include Shows which parking slot is assigned to a semi-trailer when departing

Attribute: routing Include Determines route semi-trailer should take based on parking locations and arrival/departure docks

Attribute: vehicle kinematics

EXCLUDE All semi-trailers are assumed to be the same

Cargo in semi- trailers

Quantity: model input Include Model input. Use a probability density function to determine number of cargo in each trailer and thereby the unloading time Attribute: unloading

dock

Include Shows where cargo is unloaded

Attribute loading dock Include Shows which cross-dock buffer the cargo should be unloaded to Attribute: arriving

trailer

Include Shows in which semi-trailer cargo has arrived

Attribute: departing trailer

Include Shows in which semi-trailer cargo has departed

Garage Quantity: 0 EXCLUDE Maintenance assumed to be handled during system down-time

Activities

Drop-off semi- trailer by Truck

Quantity: number of arriving transports

Include Experimental factor

Pick-up at Arrival/Departure Parking

Quantity: number of arriving transports

Include Experimental factor

Drop-off at Arrival/Departure Parking

Quantity: number of departing transports

Include Experimental factor

Rearward docking/parking

Cycle time: fixed Include Depends on rearward driving speed, model input.

Routing: end of cross- road

Include AGV or AGV+semi-trailer stops at end of the cross-road and then backs up.

Breakdown EXCLUDE Assumed that docking or parking semi-trailer never fails

Other: AGV load- specific

EXCLUDE No difference between rearward driving time whether AGV is loaded with semi-trailer or not Empty trailer

movements between cross- dock and Empty Trailer Parking

Quantity: 2 per trailer Include From cross-dock to ET when finished unloading and from ET to cross-dock when ready for departure

(De)coupling between AGV and semi-trailer

Cycle time: fixed Include Model input

Loading/unloading semi-trailer

Quantity: depends on cargo in semi-trailer

Include Key influence on throughput, experimental factor

AGV Charging Cycle time: variable Include Depends on model input (continuous charging, battery swaps or conventional charging) Breakdown EXCLUDE AGV charging never fails Set-up: depends on

model input

Include AGV charging is replaced with a set-up/changeover when battery swaps are used

Resources: charging facility

Include Located at AGV parking area.

Conflict/collision avoidance

Include Facilitates real-life representation of system

Pick-up semi- trailer by truck

Include Key influence on parking area utilization

Internal cross- dock operations

EXCLUDE Limited impact on throughput of AGVs, assumed to have no impact on (un)loading operations

Queues Cross-dock queues

Quantity: same as number of docks

Include Temporarily stores cargo

Capacity EXCLUDE Assumed to be infinite

Queue discipline EXCLUDE Does not affect loading/unloading times

Routing: cargo attribute dependent

Include Determines where cargo should be stores based on departure dock attribute of cargo.

Resources

Trucks Quantity: total of arriving and departing transports

Include Required for transporting semi- trailers

Where required: drop- off and pick-up semi- trailer at A/D parking

Include Required for positioning semi- trailer at terminal and to free up space at parking when departing transports arrives at A/D parking Shifts: 24 hours, 6

days a week

AGVs Quantity: variable Include Experimental factor. Where required: any

activity involving semi- trailer movement within system boundary

Include Key influence on semi-trailer throughput

Shifts: 24 hours, 6 days a week

Include Model input

AGV charging equipment

Quantity: same as number of AGVS

Include Experimental factor

Where required: any activity related to charging AGVs

Include Enables charging of AGVs

Other: charging type Include Experimental factor (continues charging, battery swaps or conventional charging) Personnel in

cross-dock

Quantity EXCLUDE Assumed to be always available

Handling equipment in cross-dock

Documento similar