1.0 SCOPE OF WORK & GENERAL:

1.1 Item refers to supplying and fixing rolling shutters of size and type as specified in the description of item.

2.0 MATERIALS:

2.1 Rolling shutters complete with accessories shall be of approved quality and as specified. These shall be suitable for fixing in position as specified i.e. outside or inside; on or below lintel or between jambs of the opening. Rolling shutter shall be hand/gear operated as specified in the item of schedule of quantities. For hand operated shutters, it shall be push and pull type. For gear operated shutters, it shall be provided with reduction gear operated by mechanical device with chain, crank, shaft and handle. The shutter shall consist of 80 mm. wide m.s. laths 1.25 mm. thick or gauge as specified of best quality mild steel sheet machine rolled. Laths shall be inter locked together throughout their entire length and jointed together at the end with end locks. These shall be mounted on specially designed pipe shaft. The spring shall be of best quality and shall be manufactured from the tested tensile spring steel wire or strip of adequate strength to balance the shutter in all positions. The spring, pipe shaft etc. shall be supported on strong mild steel or malleable cast iron brackets. Both the side guides and bottom rails shall be joint less and of single piece of pressed steel of minimum 16 gauge thickness. The top cover of shaft, spring etc. shall be of the same materials as that of lath. No extra payment shall be made for the hood, brackets etc. to cover the shaft etc. The reduction gear arrangement operated by the mechanical device shall be of the best quality and shall be easy in operation.

3.0 FIXING:

3.1 Brackets shall be fixed on the lintel/beam or under the lintel/beam as specified in item with rawl plugs and screws, bolts, washers etc. The shaft along with the spring shall then be fixed on the brackets. The lath portion (shutters) shall be laid on ground and the side guide channels shall be bound with it. The shutter shall then be placed in position. The side guide channels shall be fixed to the wall through the plates welded to the guides. These plates and brackets shall be fixed by means of steel screws, bolts and rawl plugs drilled into the wall. The plates and screws, bolts shall be concealed in plaster to make their locations invisible. Fixing shall be done accurately in a workman like manner that the operation of the shutter is easy and smooth. All grout holes and damages on the wall while fixing of shutters shall be made good by the contractor at no extra cost to the Department. The contractor shall ensure smooth and easy working of shutters. All the members of the rolling shutter shall be thoroughly cleaned off dust, scales, rust etc. and shall be given approved priming coat of red oxide paint before fixing the shutter in position and then shall be painted with two coats of flat/synthetic enamel paint of approved quality and shade.

4.0 MODE OF MEASUREMENT:

4.1 The area of rolling shutters shall be measured in square metre correct up to two places of decimal. Width and height shall be taken for net opening correct to a centimeter.

5.0 RATE:

The rate shall include the cost of materials, labour involved in all the operations described above.

SPECIFICATIONS FOR

M. S. GRILLS/RAILINGS

1.0 GENERAL:

1.1 The contractor shall submit 6 copies of shop drawings covering all types of work under this specifications before manufacture. The drawing shall show all dimensions, details of construction, installation relating to the adjoining work.

2.0 MATERIALS:

2.1 All structural steel shall conform to I.S. 226 sections for grills and shall be free from loose mill scales, rusts, pittings or any other defects affecting its strength and durability.

3.0 FABRICATION:

3.1 The grill shall be fabricated to the design and pattern shown in the drawings. All joints shall be made in best workman like manner with slotting and welding as required to the specified size and shape. The edge of the M.S. flats shall be suitably mitred before welding to get the desired shape. The joints shall be filled to remove excess stay after welding. Screws, nuts, washers, bolts, rivets and any other miscellaneous fastenings, devices shall be of steel and shall be provided by the contractor.

3.2 Manufactured M.S. grills then be fixed in between the posts, balusters, M.S. frame work etc. to correct alingnment. Any undulations, bends etc.found shall be rectified by the contractor at his own cost. The complete assembly of grill/railing so fixed shall be firm and there shall not be any lateral movements.

4.0 SAMPLES:

4.1 Samples of grill and railings shall be submitted for approval of the Engineer-in-Charge and to be got approved before taking up for mass fabrication.

5.0 INSTALLATION:

The approved grills shall be fixed in position where specified and shown in drawings including in masonry walls, teakwood frames, hand railings etc. Any damages to walls, frames etc. caused during fixing the grills shall be made good by grouting with cement mortar/packing/repairing properly at the contractors cost.

6.0 PAINTING:

6.1 Painting shall be done as per the specifications specified under painting.

7.1 Actual area of m.s. grill manufactured and fixed in position shall only be measured in square metre for payment. All measurements shall be taken to two places of decimal of a metre and area shall be calculated to second place of decimals of a square metre.

7.2 The rate is to include the cost of all materials, labour, transporting, fabricating, installing, scaffolding if necessary, grouting etc. complete.

8.0 FINISHING/PAINTING/POLISHING FOR RAILING:

Teak wood hand rail shall be polished with wax polish/ french polish/solignum with two or more coats over one coat of wood primer or painted with two coats of synthetic enamel paint/flat oil paint of approved make and shade over one coat of approved primer. M.S. grills, balusters etc. also to be painted as per specifications specified under painting/polishing.

9.0 MODE OF MEASUREMENTS (HAND RAILS):

Hand railing shall be measured for payment in running metre. The length shall be measured along the top centre line of the hand rail and shall be measured between ends of balusters, newels, posts as the case may be up to two places of decimals of a metre. Rate shall include fabrication, leaving suitable pockets, grouting the same, providing and fixing suitable teak wood plugs, fixing, all labour, materials, transport, painting/polishing, finishing and scaffolding if necessary.