• No se han encontrado resultados

CAPÍTULO II De la Hacienda Pública

TÍTULO DÉCIMO DEL MUNICIPIO LIBRE

AV-5762 CONSTRUCT APRON EXPANSION AND WIDEN TAXIWAY FROM 35 TO 60 FEET. LEE RALEIGH EXECUTIVE

SANFORD - LEE COUNTY AIRPORT (TTA)

INTERSTATE PROJECTS

I-5340 US 220 ALTERNATE TO RANDOLPH COUNTY

LINE. PAVEMENT REHABILITATION. 4.2 2000

NHPIM C 2000

MONTGOMERY I-73 / I-74 / US 220

I-5208 INTERSTATE MAINTENANCE

PRESERVATION FOR DIVISION 8. 1431

NHPIM C 159 C 159 C 159 C 159 C 159 C 159 C 159 C 159 C 159

MONTGOMERY RANDOLPH

I-73, I-74 AND I-85

I-5329 SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS. 1595 1595 UNDER CONSTRUCTION 50.0 MONTGOMERY RANDOLPH RICHMOND FUTURE I-73 / FUTURE I-74 RURAL PROJECTS

R-2107* NC 24/NC 27, EAST OF LITTLE RIVER TO US

220 IN BISCOE. WIDEN TO MULTI-LANES. 0.8 15993 15993 MONTGOMERY NC 24-27

A EAST OF LITTLE RIVER TO US 220A - COMPLETE B US 220A TO US 220 - UNDER CONSTRUCTION

R-2527* NC 73 TO THE TROY BYPASS. WIDEN TO A FOUR-LANE DIVIDED FACILITY.

47237 2574

PLANNING / DESIGN IN PROGRESS

9.1 T R 4100

T U 1150

T M 13

T C 13134 C 13133 C 13133

MONTGOMERY NC 24 / NC 27

R-0623* TROY BYPASS, SR 1138 (DAIRY ROAD) TO EAST OF LITTLE RIVER. FOUR LANES, PART ON NEW LOCATION.

56531 7431

RIGHT OF WAY IN PROGRESS

5.0 T C 16367 C 16367 C 16366

MONTGOMERY NC 24 / NC 27

R-2528* NC 24 / NC 27, US 220 TO THE CARTHAGE

BYPASS. WIDEN TO MULTI-LANES. 100800

UNFUNDED INTRASTATE PROJECT

19.6 T R 24900 T U 3900 T C 72000 MONTGOMERY MOORE NC 24 / NC 27

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE * INDICATES INTRASTATE PROJECT

RURAL PROJECTS

R-4444 FOREST HIGHWAY 49, UWHARRIE NATIONAL FOREST, PFH 49-1(3). REPLACE REEVES CREEK VENTED FORD AND PAVE NORTH END OF FH 49.

1000

CONSTRUCTION BY FEDERAL HIGHWAY ADMINISTRATION PROJECT COMPLETE FLPF R 100A

FLPF C 900A MONTGOMERY FH 49

A INSTALL CULVERT AT REEVES SPRING BRANCH AND RECONSTRUCT FDR 597 (BADIN LAKE ROAD). - COMPLETE

FEDERAL BRIDGE PROJECTS

B-5362 REPLACE BRIDGE NO. 53 OVER DROWNING

CREEK. 2080 100

PLANNING / DESIGN IN PROGRESS

STPON R 180

STPON C 1800

MONTGOMERY NC 73

B-4780 REPLACE BRIDGE NO. 22 OVER RICHLAND

CREEK. 810 285

RIGHT OF WAY IN PROGRESS

STPOF C 525

MONTGOMERY SR 1111 (LILLYS BRIDGE ROAD)

BICYCLE AND PEDESTRIAN PROJECTS

EB-5521 SR 1323 (OKEEWEMEE ROAD) TO BARNHILL

STREET IN TROY. CONSTRUCT SIDEWALKS. 745 120

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF TROY - IN PROGRESS

2.5 STPEB C 625 MONTGOMERY NC 134 (NORTH MAIN STREET) SR 1005 (SOUTH MAIN STREET)

CONGESTION MITIGATION PROJECTS

C-4936 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.

714 714

IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION CASWELL DAVIDSON FORSYTH GUILFORD MONTGOMERY RANDOLPH ROCKINGHAM VARIOUS

NCBOT AMENDED STIP - MAY 2015

DIVISION

8

LENGTH

COUNTY

LOCATION / DESCRIPTION

(THOU) (THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

FY 2014

FY 2016

NUMBER

UNFUNDED

PRIOR

YEARS

COST

TOTAL

PROJ

COST

FY 2013

FY 2012

FY 2015

FY 2017

FY 2018

FY 2019

FY 2020

FUTURE YEARS

5 YEAR WORK PROGRAM

DEVELOPMENTAL PROGRAM

ROUTE/CITY

RURAL PROJECTS

R-2529* CARTHAGE BYPASS TO NC 87. WIDEN TO

MULTI-LANES. 120700

UNFUNDED INTRASTATE PROJECT

21.2 T R 32900 T U 4900 T C 82900 HARNETT MOORE NC 24 / NC 27 R-2212* NC 24 / NC 27, CARTHAGE BYPASS, SR 1640 TO SR 1653. FOUR LANES ON NEW LOCATION.

41862 1077

UNFUNDED INTRASTATE PROJECT

4.3 T R 7000

T U 585

T C 33200

MOORE NC 24 / NC 27

R-2807 NC 211 TO PROPOSED NC 211 BYPASS OF WEST END. RELOCATE PORTION OF NC 73 TO ELIMINATE OFFSET INTERSECTIONS IN WEST END.

1780

FEASIBILITY STUDY COMPLETE - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY TO EXPEDITE DELIVERY OF NEW STI PROJECT.

0.5 STP R 380

STP C 1400

MOORE NC 73

R-5726 SR 1241 (HOLLY GROVE SCHOOL ROAD) TO NC 73 IN WEST END. WIDEN TO MULTILANES. 7.1

MOORE NC 211

R-2812 NC 211, NC 73 IN WEST END TO THE TRAFFIC CIRCLE IN PINEHURST. WIDEN TO MULTI-LANES. 46108 34821 UNDER CONSTRUCTION 7.2 STP C 11287 MOORE NC 211 URBAN PROJECTS

U-3324 US 1 (SANDHILLS BOULEVARD) AND SR 1309 (MORGANTON ROAD) IN SOUTHERN PINES. UPGRADE INTERCHANGE.

27363 27363

PROJECT COMPLETE

MOORE US 1

(SANDHILLS BOULEVARD)

U-5815 OLD US 1 TO SR 1112 (ROSELAND ROAD) IN ABERDEEN. ACCESS MANAGEMENT IMPROVEMENTS.

COORDINATE WITH U-5814 2.8

MOORE US 1

(SANDHILLS BOULEVARD)

U-5814 US 1 (SANDHILLS BOULEVARD) TO BRUCEWOOD ROAD IN ABERDEEN AND SOUTHERN PINES. ACCESS MANAGEMENT IMPROVEMENTS.

COORDINATE WITH U-5815 1.3

MOORE US 15 / US 501 / NC 211

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE * INDICATES INTRASTATE PROJECT

URBAN PROJECTS

U-5756 US 1 IN ABERDEEN TO SOUTH CITY LIMITS OF PINEHURST. WIDEN TO MULTILANES. 3.9

MOORE NC 5

FEDERAL BRIDGE PROJECTS

B-3680 REPLACE BRIDGE NO. 2 OVER CSX

RAILROAD. 10715 10715

UNDER CONSTRUCTION MOORE US 15 / US 501

B-5522 REPLACE BRIDGE NO. 90 OVER CABIN CREEK. 2945 STPOF R 270 STPOF C 2675 MOORE SR 1275 (PINE GROVE CHURCH ROAD)

B-5164 REPLACE BRIDGE NO. 178 OVER BUFFALO

CREEK. 1077 1077

UNDER CONSTRUCTION

MOORE SR 1484

(RITTER ROAD)

MUNICIPAL BRIDGE PROJECTS

B-5543 REPLACE BRIDGE 620087 OVER

THAGGARDS LAKE IN WHISPERING PINES. 809 165

RIGHT OF WAY PROGRESS BY VILLAGE OF WHISPERING PINES - MUNICIPAL BRIDGE

STPOF C 644

MOORE SOUTH

LAKESHORE DRIVE

INTERSTATE PROJECTS

I-5313 MONTGOMERY COUNTY LINE TO US 220

BUSINESS. PAVEMENT REHABILITATION. 2556 281

PLANNING / DESIGN IN PROGRESS

8.1 NHPIM C 2275

RANDOLPH I-73 / I-74 / US 220

I-5314 DAVIDSON COUNTY LINE TO EAST OF SR 1009 (MAIN STREET). REPLACE FUNNEL DRAINS, CONSTRUCT EXPRESSWAY GUTTER, REPAIR / REPLACE GUARDRAIL, AND RESURFACE.

4816 4816

UNDER CONSTRUCTION 6.0

RANDOLPH I-85

I-4407 SOUTH OF NC 134-US 220 BUSINESS TO NORTH OF SR 1462 IN ASHEBORO. SAFETY IMPROVEMENTS TO BRING FACILITY TO INTERSTATE STANDARDS.

29726 29726 8.0

RANDOLPH US 220 FUTURE I-73/74

NCBOT AMENDED STIP - MAY 2015

DIVISION

8

LENGTH

COUNTY

LOCATION / DESCRIPTION

(THOU) (THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

FY 2014

FY 2016

NUMBER

UNFUNDED

PRIOR

YEARS

COST

TOTAL

PROJ

COST

FY 2013

FY 2012

FY 2015

FY 2017

FY 2018

FY 2019

FY 2020

FUTURE YEARS

5 YEAR WORK PROGRAM

DEVELOPMENTAL PROGRAM

ROUTE/CITY

RURAL PROJECTS

R-2220* EAST OF I-85 BUSINESS IN LEXINGTON TOUS 220 IN ASHEBORO. WIDEN TO FOUR LANES.

140362 12262

UNFUNDED INTRASTATE PROJECT

25.8 T R 17500 T U 4300 T C 22200B T C 36200C T C 40500D T C 7400E DAVIDSON RANDOLPH US 64

A US 64, I-85 BUSINESS IN LEXINGTON TO I-85 EAST OF LEXINGTON - COMPLETE B US 64, I-85 EAST OF LEXINGTON TO NC 109

C US 64, NC 109 TO SR 1409 (LAKE PARK ROAD) D US 64, SR 1409 (LAKE PARK ROAD) TO NC 49 E US 64 INTERCHANGE AT NC 49

R-2536 US 64, ASHEBORO SOUTHERN BYPASS, US 64 WEST TO US 64 EAST. FOUR-LANE FREEWAY ON NEW LOCATION WITH INTERCHANGES AT US 220, NC 49 AND ZOO ACCESS AT NC 159.

351490 8194

PLANNING / DESIGN IN PROGRESS

14.0 T R 60935

T U 3853

T M 508

T C 69500 C 69500 C 69500 C 69500

RANDOLPH US 64

R-2606 SOUTH OF SR 1920 (TUTTLE ROAD) TO US 220 NORTH OF ASHEBORO. FREEWAY ON NEW LOCATION.

207268 148468

SEGMENT B DESIGN-BUILD PROJECT; GARVEE BOND FUNDING $9.4 MILLION FOR RIGHT OF WAY; PAYBACK FY 2008 - FY 2019 AND GARVEE BOND FUNDING $80.0 MILLION FOR CONSTRUCTION; PAYBACK FY 2008 - FY 2019 11.5 NHP RG 1031B RG 1031B RG 1031 B RG 1031 B RG 1031 B RG 1031 B NHP CG 8769B CG 8769B CG 8769 B CG 8769 B CG 8769 B CG 8769 B RANDOLPH US 311 FUTURE I-74 CORRIDOR

A US 311 / FUTURE I-74, SOUTH OF SR 1920 (TUTTLE ROAD) TO NORTH OF SR 1929 (SPENCER ROAD) - COMPLETE B US 311 / FUTURE I-74, NORTH OF SR 1929 (SPENCER ROAD) TO US 220/FUTURE I-73 - COMPLETE

URBAN PROJECTS

U-5770 SR 1993 (SOUTH MAIN STREET) IN ARCHDALE. INTERCHANGE IMPROVEMENTS. RANDOLPH I-85

U-5813 ASHEBORO BYPASS TO NC 49 IN ASHEBORO. WIDEN TO MULTILANES AND RECONSTRUCT INTERCHANGE AT NC 49.

2.2 RANDOLPH US 64

A US 64 - ASHEBORO BYPASS TO NC 49 IN ASHEBORO. WIDEN FROM 2 LANE TO 4-LANE DIVIDED FACILITY B US 64 - NC 49 IN ASHEBORO. RECONSTRUCT INTERCHANGE - COORDINATE WITH B-5363

U-5758 INTERSECTION OF US 220 BUSINESS (FAYETTEVILLE STREET) AND PRESNELL STREET IN ASHEBORO. INTERSECTION IMPROVEMENTS.

RANDOLPH US 220 BUSINESS (FAYETTEVILLE STREET)

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE * INDICATES INTRASTATE PROJECT

URBAN PROJECTS

U-5743 DUBLIN ROAD TO US 64 / NC 49 (DIXIE DRIVE) IN ASHEBORO. WIDEN TO MULTILANES.

0.5 RANDOLPH NC 42

U-5305 SR 1144 (MACK ROAD) INTERSECTION AND APPROACHES IN ASHEBORO.

OPERATIONAL / GEOMETRIC IMPROVEMENTS AND ROADWAY RELOCATION / REALIGNMENT.

3115 815

RIGHT OF WAY IN PROGRESS

STP C 2300

RANDOLPH NC 49

SR 1144 (MACK ROAD)

U-5759 US 64 (DIXIE DRIVE) / ATLANTIC AVENUE IN ASHEBORO. INTERSECTION

IMPROVEMENTS. RANDOLPH NC 159 (ZOO

PARKWAY)

U-5308 SOUTH OF SR 3106 (KENNEDY ROAD) TO I-85 IN TRINITY. WIDEN TO MULTILANES WITH BICYCLE-PEDESTRIAN ACCOMMODATIONS.

19600

2.3 STP R 5700 R 5700

STP C 8200

RANDOLPH SR 1547

(FINCH FARM ROAD)

U-3400 SR 1567 (ROBBINS COUNTRY ROAD) TO US 311 (MAIN STREET) IN ARCHDALE. WIDEN TO MULTI-LANES. 22300 3.1 STP R 5050 R 5050 STP C 12200 GUILFORD RANDOLPH SR 1577 / SR 1004 (ARCHDALE ROAD)

U-5864 I-85 TO EDEN TERRACE IN . WIDEN TO

MULTILANES. 2.9

RANDOLPH SR 1595 (SURRETT DRIVE)

U-5711 WEST OF SYLVAN STREET TO US 220 BUSINESS IN ASHEBORO. WIDEN TO MULTILANES.

0.6 RANDOLPH SR 1712

(PINEVIEW STREET)

FEASIBILITY STUDIES

FS-1008A SR 1009 INTERCHANGE IN ARCHDALE. RECONSTRUCT EXISTING INTERCHANGE TO BETTER ACCOMMODATE TRAFFIC.

FEASIBILITY STUDY IN PROGRESS RANDOLPH I-85

FEDERAL BRIDGE PROJECTS

B-4608 REPLACE BRIDGE NO. 208 OVER FORK

CREEK. 1681 1681

RANDOLPH SR 1003 (ERECT ROAD)

NCBOT AMENDED STIP - MAY 2015

DIVISION

8

LENGTH

COUNTY

LOCATION / DESCRIPTION

(THOU) (THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

FY 2014

FY 2016

NUMBER

UNFUNDED

PRIOR

YEARS

COST

TOTAL

PROJ

COST

FY 2013

FY 2012

FY 2015

FY 2017

FY 2018

FY 2019

FY 2020

FUTURE YEARS

5 YEAR WORK PROGRAM

DEVELOPMENTAL PROGRAM

ROUTE/CITY

FEDERAL BRIDGE PROJECTS

B-4794 REPLACE BRIDGE NO. 18 OVER BETTIE

MCGEES CREEK. 1385 150

PLANNING / DESIGN IN PROGRESS

STPOF R 110

STPOF C 1125

RANDOLPH SR 1107 (LASSITER MILL ROAD)

B-4795 REPLACE BRIDGE NO. 25 OVER AN

UNNAMED CREEK. 1042 100

PLANNING / DESIGN IN PROGRESS

STPOF R 85

STPOF M 7

STPOF C 850

RANDOLPH SR 1112 (ABNER ROAD)

B-4796 REPLACE BRIDGE NO. 24 OVER AN

UNNAMED CREEK. 1328 1328

UNDER CONSTRUCTION RANDOLPH SR 1114

(PISGAH COVERED BRIDGE ROAD)

B-4609 REPLACE BRIDGE NO. 16 OVER TAYLOR CREEK. 1037 1037 PROJECT COMPLETE RANDOLPH SR 1163 (UNION CHURCH ROAD)

B-4799 REPLACE BRIDGE NO. 37 OVER JACKSON'S

CREEK. 1425 1425

PROJECT COMPLETE RANDOLPH SR 1311

(BESCHER CHAPEL ROAD)

B-4800 REPLACE BRIDGE NO. 43 OVER JACKSON

CREEK. 1980 STPOF R 180 STPOF C 1800 RANDOLPH SR 1312 (GALLIMORE DAIRY ROAD)

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE * INDICATES INTRASTATE PROJECT

FEDERAL BRIDGE PROJECTS

B-5128 REPLACE BRIDGE NO. 58 OVER AN UNNAMED TRIBUTARY OF THE LITTLE UWHARRIE RIVER.

733 258

RIGHT OF WAY IN PROGRESS

STPOF C 475

RANDOLPH SR 1404 (FULLER MILL ROAD)

B-5114 REPLACE BRIDGE NO. 136 OVER US 29 / US

70 / I-85 BUSINESS. 6824 1124

RIGHT OF WAY IN PROGRESS

NHPB C 5700

RANDOLPH SR 1619 (PROSPECT STREET)

B-5363 REPLACE BRIDGE NO. 171 OVER US 64 AND

NC 49 IN ASHEBORO. 3575 STPON R 325 STPON C 3250 RANDOLPH SR 1713 (ALBEMARLE ROAD)

B-4969 REPLACE BRIDGE NO. 154 OVER SANDY

CREEK BRANCH. 618 100

PLANNING / DESIGN IN PROGRESS

STPON R 18

STPON C 500

RANDOLPH SR 2440 (BROWER MEADOW ROAD)

B-5360 REPLACE BRIDGE NO. 374 OVER SANDY CREEK.

1868 100

PLANNING / DESIGN IN PROGRESS - LET WITH B-5546

STPOF R 68

STPOF C 1700

RANDOLPH SR 2481 (LOW BRIDGE ROAD)

B-5546 REPLACE BRIDGE NO. 307 OVER MOUNT

PLEASANT CREEK. 771 100

PLANNING / DESIGN IN PROGRESS - TO BE LET WITH B-5360.

STPOF R 21

STPOF C 650

RANDOLPH SR 2481 (LOW BRIDGE ROAD)

NCBOT AMENDED STIP - MAY 2015

DIVISION

8

LENGTH

COUNTY

LOCATION / DESCRIPTION

(THOU) (THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

FY 2014

FY 2016

NUMBER

UNFUNDED

PRIOR

YEARS

COST

TOTAL

PROJ

COST

FY 2013

FY 2012

FY 2015

FY 2017

FY 2018

FY 2019

FY 2020

FUTURE YEARS

5 YEAR WORK PROGRAM

DEVELOPMENTAL PROGRAM

ROUTE/CITY

BICYCLE AND PEDESTRIAN PROJECTS

EB-4711 NORTH CAROLINA ZOO BIKE TRAIL, EAST DIXIE DRIVE, US 64, AND NORTH CAROLINA ZOO.

SCHEDULED FOR FEASIBILITY STUDY RANDOLPH ASHEBORO

RURAL PROJECTS

R-2501* SOUTH CAROLINA STATE LINE TO SR 1001 (MARSTON ROAD). WIDEN TO MULTI-LANES WITH BYPASS OF ROCKINGHAM ON NEW LOCATION. (COORDINATE WITH PROJECT K- 3808). 298024 17033 IN PROGRESS 24.1 T M 9C T C 6200C C 6200 C C 6200 C T R 14280BC T U 3731BC T C 83600BC T R 13300BB T U 2523BB T R 4500A T C 25700A T U 908BA T R 5519BA T C 40500BA T C 67700BB T M 121 BC RICHMOND US 1

A US 1, SOUTH CAROLINA STATE LINE TO SR 1104 (OSBORNE ROAD) BA US 1, SR 1104 (OSBORNE ROAD) TO US 74 BYPASS

BB US 1, US 74 BYPASS TO US 74 BUSINESS

BC US 1, US 74 BUSINESS TO NORTH OF SR 1606 (FOX ROAD)

C US 1, NORTH OF SR 1606 (FOX ROAD) TO SOUTH OF SR 1001 (MARSTON ROAD) - RIGHT OF WAY IN PROGRESS

R-3421 ROCKINGHAM BYPASS. FOUR LANES DIVIDED ON NEW LOCATION.

237616 62058 10.5 NHP C 15425C C 15425 C C 15425 C NHP M 50 A NHP M 933 B NHP C 21834 A C 21833 A C 21833 A NHP C 20934 B C 20933 B C 20933 B RICHMOND US 220 BYPASS / I-73 / I-74

A US 220 BYPASS / I-73 / I-74 (ROCKINGHAM BYPASS), US 74 BYPASS WEST OF ROCKINGHAM AT SR 1109 (ZION CHURCH ROAD) INTERCHANGE TO SOUTH OF SR 1140 (OLD CHARLOT RIGHT OF WAY IN PROGRESS

B US 220 BYPASS / I-73 / I-74 (ROCKINGHAM BYPASS), SOUTH OF SR 1140 (OLD CHARLOTTE HIGHWAY) TO SOUTHWEST OF SR 1304 (HARRINGTON ROAD) - RIGHT OF WAY IN PROGR C US 220 BYPASS / I-73 / I-74 (ROCKINGHAM BYPASS), SOUTHWEST OF SR 1304 (HARRINGTON ROAD) TO US 220 BUSINESS/US 220 BYPASS INTERCHANGE SOUTH OF ELLERBE - UND

CONSTRUCTION

R-5305 REHABILITATE SILO ROAD AND RIVER

EXTENSION. 16 16

CONSTRUCTION BY US FISH AND WILDLIFE SERVICE - IN PROGRESS ANSON

RICHMOND

SILO ROAD

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE * INDICATES INTRASTATE PROJECT

URBAN PROJECTS

U-5797 FARRINGTON STREET TO EAST 22ND STREET. WIDEN TO MULTI-LANES.

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY. 1.3

RICHMOND SR 1997

(FAYETTEVILLE ROAD)

U-5706 SR 1903 (MILL ROAD) TO SR 1426 (ABERDEEN ROAD). CONSTRUCT TWO LANE FACILITY UTILIZING SECTIONS OF SR 1923 (BROAD STREET), SR 1641 (CLEMMER ROAD) AND SR 1645 (MT. OLIVE CHURCH ROAD), REMAINDER ON NEW LOCATION.

4.0 RICHMOND VARIOUS

AVIATION PROJECTS

AV-5761 CLEAR OBSTRUCTIONS IN RUNWAY 14 APPROACH.

RICHMOND RICHMOND COUNTY AIRPORT (RCZ)

AV-5763 EXTEND RUNWAY 14-32 TO 5500 FEET. RICHMOND

FEDERAL BRIDGE PROJECTS

B-4639 REPLACE BRIDGE NO. 17 OVER GUM

SWAMP IN LAURINBURG. 2837 2837

UNDER CONSTRUCTION SCOTLAND US 15 / US 401

B-4816 REPLACE BRIDGE NO. 65 OVER JUNIPER

CREEK. 2834 2834

UNDER CONSTRUCTION SCOTLAND US 15 / US 501

B-4817 REPLACE BRIDGE NO. 23 OVER GUM

SWAMP CREEK. 2271 2271

UNDER CONSTRUCTION SCOTLAND US 74

B-4273 REPLACE BRIDGE NO. 47 OVER LUMBER RIVER.

3415 3415

UNDER CONSTRUCTION SCOTLAND US 401

B-5551 REPLACE BRIDGE NO. 18 OVER LEITH'S

CREEK. 2552 2552

UNDER CONSTRUCTION 0.4

SCOTLAND US 501

B-5131 REPLACE BRIDGE NO. 63 OVER JOES

CREEK. 914 914

SCOTLAND SR 1128 (OLD STAGE ROAD)

NCBOT AMENDED STIP - MAY 2015

DIVISION

8

LENGTH

COUNTY

LOCATION / DESCRIPTION

(THOU) (THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

FY 2014

FY 2016

NUMBER

UNFUNDED

PRIOR

YEARS

COST

TOTAL

PROJ

COST

FY 2013

FY 2012

FY 2015

FY 2017

FY 2018

FY 2019

FY 2020

FUTURE YEARS

5 YEAR WORK PROGRAM

DEVELOPMENTAL PROGRAM

ROUTE/CITY