For the treatment of most bacteria the capital costs for three to four units capable of treating 1,000 m³ per hour are currently in the range of US $ 98,000 to US $ 130,400. In order to treat the more UV-resistant blue-green algae the cost could be tenfold. Power requirements are typically between 10 and 20 Wh m³, with a large plant in the former USSR reporting the treatment of 3,000 m³ per day of surface water at an average electrical consumption of 10-16 Wh m³ (Twort et al. 1985). Other than the input of electricity the ongoing costs would also include replacement of UV lamps every 4,000 hours and quartz sleeves at intervals of approximately two years. Costs for each of these items are approximately US $ 500. The application of UV radiation for the treatment of seawater has so far not been widespread. However, it could be an effective and environmentally acceptable ballast water treatment option once the larger organisms have been removed by mechanical processes (e. g. filtration). The technique is likely to be acceptable on health and safety grounds and is unlikely to have any adverse effects on pipework, pumps or coatings. There are no known toxic by-products, although it is has not been ruled out that the alteration of genetic material and the generation of new characteristics in lower organisms may occur as a result of non-lethal doses of UV (AQIS 1993). Since UV radiation catalyses the oxidation reactions with ozone or hydrogen peroxide, a combination of UV treatment with low concentrations of these biocides may also be worth exploring (Müller 1995, Müller & Reynolds 1995).
4.5 Chlorination
Costs for dosing with low concentrations of chlorine at 5 mg/1 have been quoted as approximately US $ 4:9 per 1,000 tonnes of water. Larger amounts of chlorine would be required for ballast water disinfection at the higher dosage rates and consequently costs will be in the order of 20 to 100 times higher for the same volume of water. Between 4 and 20 tonnes of chlorine would be required for the treatment of 40,000 tonnes of ballast water. In co- operation with a filtration method the chlorine requirement would be reduced to 200 kilograms for the same volume of water. At these lower application rates chlorine would be a relatively inexpensive option (Müller 1995, Müller & Reynolds 1995, Rabe & Katzenbach pers. comm.).
AQIS (1993) estimated the costs of a system that may be used to treat 4,000 m³/h with 2 mg/l chlorine on less than US $ 376;500.
The needed concentration of free chlorine was estimated as 500 ppm for 24 hours. Approximately 30 % of the initial free chlorine remains after 24 hours application. It was calculated that 2.4 t of 12.5 % NaHOCl per 50,000 t vessel would be needed per voyage. The costs involved were estimated as US $ 294,000 per treatment. It has to be taken into account that the effectiveness of chlorination is decreased in cases of high organic loads of the ballast water (Bolch & Hallegraeff 1994). Lower dosages (e.g. 50 ppm) could be acceptable if one is willing to tolerate a small fraction of residual cysts. In order to prevent environmentally un- sound ballast water discharges after chlorination treatment a neutralisation with an additional chemical (e.g. sodium metabisulphite) is necessary and brings additional costs (Rigby et al. 1993).
4.6 Metal ions
For the use of electrolytically generated copper and silver ions estimated space requirements for a system suitable for treating 20,000 tonnes of ballast water has been given as 3 x 2 x 2 m. An equally tentative capital cost estimate of $100,000 has also been provided. Running costs largely relate to electrical power consumption and periodic electrode replacement (Müller 1995, Müller & Reynolds 1995).
4.7 Ozonation
Ozone gas is highly toxic and has an odour detection threshold of about 0.01 ppm. A high level of safety measures and related costs, including monitoring of carbon scrubbed vented gas, therefore have to be adopted with its use. Capital costs of O3 generation units are high when compared to chlorine systems. Equipment for the generation of O3 to treat 4,000 m³ per hour is likely to cost in excess of US $ 2;9 million, whilst a chlorine dosing plant for the same treatment volume is less than US $ 376,500 (AQIS 1993). Operation and maintenance costs are very much higher than for chlorine (Reynolds et al. 1989). In addition to the associated high costs of this treatment it has been assumed that O3 may be a potentially corrosive agent in ballast systems (Flemming 1991, Carlton et al. 1993).
4.8 Hydrogen peroxide
A concentration of 5,000 ppm for 24 hours application is needed. It is estimated that 150 tonnes of 35 % hydrogen peroxide are needed to treat the ballast water of a 50,000 t vessel. The costs involved were summarised as $A 2 million per treatment. Not only the high costs involved make this option un-acceptable, but it was documented that during high organic load of the ballast water the effectiveness is decreasing (Bolch & Hallegraeff 1994).
In another example costs are calculated for a bulk carrier containing 50,000 tonnes of ballast water requiring 1,000 tonnes of hydrogen peroxide (as an industrial 50 % aqueous solution costing approx. US $ 2,940 per tonne) resulting in US $ 2;9 million per voyage. Lower concentrations may be acceptable for some cysts or for extended periods of time. But even concentrations of 50 ppm seem to be very expensive (US $ 14,700 for 50,000 tonnes of ballast water) (Rigby et al. 1993).
4.9 Salinity adjustment
To treat the ballast water with an adjustment of salinity enormous volumes of NaCL are needed. For a small vessel 210 tonnes. The treatment material is high corrosive (Bolch & Hallegraeff 1994) and may damage ballast tanks, holds or pipework. Additional costs result in delays during loading 210 tonnes bulk material and storage on board
4.10 Organic biocides
The costs involved concerning biocide treatment are known in two cases: the bacterial treatment on Norwegian oil drilling platforms and the treatment of the introduced Sea Lamprey in the Great Lakes.
4.10.1 Bacterial treatment
Treatment of the injection water of Norwegian drilling platforms in the North Sea started two decades ago. The price per treated tonne injection water was in the 1970s approximately US$ 0.12. The price was reduced to US$ 0.0184 per ton today. The sixfold price reduction was
possible by the use of alternative chemicals. Monitoring in addition had made a more optimal dosage possible (Jelmert pers. comm.).
4.10.2 Sea Lamprey
Introduced into the Great Lake system the sea lamprey has to be controlled each year by the application of chemicals to treat their larvae (Morse 1990). Costs involved in the chemical control and habitat modification summarised to more than US$ 100 million in 1993 (Leach 1995, Cangelosi pers. comm.).
4.11 Land-based facilities
The calculation of the costs was based on the need of 11,5 million m³ of ballast water that has to be treated per year. The equipment costs (including tanks, filtration units, UV-system, chemical application system, residual treatment and control) were estimated for a 52,000 m³ treatment plant to US $ 13;2 million up to US $ 27;9 million The operational costs per 1,000 m³ of ballast water were estimated as US $ 132 (including chemicals, electric power, maintenance, manpower, testing and residual disposal). Total costs were estimated as US $ 500 - 900 per 1,000 m³ of ballast water (AQIS 1993).
4.12 Shipboard treatment
The calculation of costs was based on the need of 0,5 million tonnes of ballast water that has to be treated per annum (in average one vessel per month).
4.12.1 Commercial vessels
The estimated capital costs to install e.g. a filtration unit (see below) for ballast water treatment are extremely high and therefore this method will probably not be established (AQIS 1993).
4.12.2 Treatment vessels
The costs involved for the floating treatment facilities were estimated as US $ 30;9 million based on a treatment capacity of 4,000 m³/h. This estimation includes purchase of the vessel (second hand), ship modifications and installation of (several) treatment units as well as additional pipework and power supply. Costs to operate the ship-based treatment were estimated as US $ 400 per 1,000 m³ and total costs summarise to US $ 790 per 1,000 m³ (AQIS 1993).
It has further been estimated that several land-based treatment plants (connected to the vessels by pipework or serviced by barges which collect the ballast water from the vessels discharging it later to the treatment plant on land) and treatment vessels were needed. The total costs to install treatment facilities (land-based and ship-based) in major Australian ports was estimated as US $ 470.4 million (AQIS 1993).
5 Ballast water regulations and associated guidelines in place and planned
Ballast water management and control regulations and associated implementation guidelines are being developed by IMO. IMO is concerned in regard to uni-lateral actions that have been developed or are considered by port states regarding the control of ballast water discharge in their ports or in areas under their jurisdiction. Currently there is no cost effective, technically sound, safe and environmentally safe treatment method for ballast water available. It should also be noted that the IMO voluntary international ballast water guidelines (resolution A.774 (18), since November 1997 replaced by resolution A.868 (20) have so far been applied in a relatively small number of countries only.5.1 Intergovernmental requirements to deal with ballast water and / or non-indigenous