Product Data: Within 45 calendar days after Contractor has received the City's "NOTICE TO PROCEED" or award of Contract submit the following:

Materials list of items proposed to be provided under this Section;

Manufacturer's specifications and other data needed to prove compliance with the specified requirements;

Manufacturer's recommended installation procedures which, when approved by the City Engineer or the Consultant, will become the basis for accepting or rejecting actual installation procedures used on the Work.

Applicator shall submit to the City Engineer or the Consultant a pre-warranty application form to verify amounts of materials to be used.

3.17.2 QUALITY ASSURANCE-

Contractor shall contact the manufacturer prior to bidding the work so as to become familiarized with current costs, application procedures and notification requirements. Use adequate numbers of skilled workers who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the Work of this Section.

Material and application shall comply with Rule 66, Los Angeles County Air Pollution Control District and Rule 1113 of the South Coast Air Quality Management District.

Applicator shall complete and file a "Job Report" with manufacturer certifying conformance of application procedures and quantities to the manufacturer's requirements.

Applicator Qualifications: Engage an applicator who is approved by the manufacturer and who employs only persons trained for the application of graffiti-resistant coatings. Mock-Ups 1: Prior to application to the building, apply graffiti resistant coating to 2 of the brick or concrete block mock-up to show effect on appearance. Do not apply graffiti resistant coating to the building until the mock-up is approved by the Consultant.

Mock-Ups 2: Prior to application to the building, apply graffiti resistant coating to a 16 sq. ft. Area of the building, as selected by the City Engineer or Consultant to show effect on appearance. Do not apply graffiti resistant coating to the remainder of the building until the mock-up is approved by the Consultant.

3.17.3 EXTRA STOCK (MAINTENANCE MATERIALS)-

Upon completion of anti-graffiti coating application at the job-site provide the City Engineer with 20 gallons of the anti-graffiti used on the project delivered in 1 gallon unopened and properly labeled containers for maintenance purposes.

3.17.4 PRODUCT HANDLING-

Deliver materials to the job-site in satisfactory sealed containers with labels intact with manufacturer's name, brand name, type of material and batch number.

Store materials in suitable location where directed by the City Engineer, in original unopened containers in compliance with manufacturer's printed instructions.

Inspected for approval before containers are opened and any condemned materials to be removed from the job-site.

Protect anti-graffiti coating materials from exposure to weather or damage caused by other construction operations.

3.17.5 GUARANTEE-

The Contractor shall furnish the City with a written guarantee, which guaranties that during a period of two (2) years from date of completion and acceptance of the work, the coating will not turn white, peel, chip or crack, and that the Contractor will without additional cost to the City, promptly make any repairs required as a result of ordinary wear and tear of the elements, and further guaranties that any defective material or work shall be properly repaired or replaced without additional cost to the City.

3.17.6 MAINTENANCE-

Extra Materials: Furnish the City with five, factory sealed 1 gal. containers of each of the following:

Graffiti removal material recommended by the manufacturer for the substrate and the graffiti protection system specified.

Restorer for the coating material specified, designed to restore graffiti resistance as required after five removals.

3.17.7 ACCEPTABLE MATERIALS-

Materials shall be the products of one manufacturer and be either the ones upon which the design is based on the products of the manufacturer approved in advance by the City Engineer or the Consultant.

Material shall be the appropriate type as recommended by the manufacturers (hereinafter named) or provide an equal product of another manufacturer approved in advance by the City Engineer or the Consultant.

Material must be approved for use in the City of Beverly Hills. 3.17.8 ACCEPTABLE PRODUCTS-

"Super-Kote A-G5" Sealer manufactured by Ven-Chem Company Inc. P.O. Box 3186, Santa Barbara, California, phone (805) 967-7600 or “Monochem Permashield” by Frazee Paint Co. Research Report No. 28080, phone (800) 826-9048.

The "Graffitirasor Systems" manufactured by Rainproof Systems, City of Commerce, CA 90022, Research Report No. 25035, phone (213) 887-8761.

“Vandal Guard” by Rainguard Products Co., 821 W. Hyde Park Blvd.; Inglewood, CA 90302, phone (310) 670-2953.

3.17.9 MATERIAL PERFORMANCE CRITERIA (AS APPLICABLE)-

Completed graffiti protection shall include the following performance criteria: Shall have a flat non-glossy appearance.

Shall be non-yellowing and contain no waxes, urethanes or other yellowing resins. Shall cause little or no change in the appearance of the treated surface.

Shall allow moisture vapor transmission. Can be cleaned a minimum of five times. Shall be renewable and repairable.

Be 98% effective in removing all graffiti on masonry surfaces. Dirt pickup shall not be increased by coating.

Manufacturer will warrant product performance. Product shall be VOC compliant.

Conform to all State and City waste disposal regulations including but not limited to those involving Proposition 65.

Product shall be capable by manufacturer's literature of withstanding 5 years exterior exposure without significant loss of protection, other than spot restoration of areas attacked by graffiti, cleaned, and recoated per written instructions of manufacturer.

Anti-graffiti treatment must be resistant to rain, weather, abrasion, peel, ultra-violet, and be clear and non-yellowing.

Anti-graffiti treatment should be able to withstand repeated removal of all types of paint and other graffiti materials with little or no defacement of or change to the original surface.

3.17.10 EQUIPMENT-

All clear materials shall be applied by airless spray equipment. Tip size .015-.021 3.17.11 SURFACE CONDITIONS-

Examine the areas and conditions on which materials of this Section will be applied. Correct conditions detrimental to timely and proper completion of the work. Do not proceed with contracted work of this section until such detrimental conditions are corrected at no added cost to the City.

.Do not proceed with application of anti-graffiti materials when the ambient temperature is less than 45 degrees F., when low temperature of 40 degrees F. or less is predicted within a period of 24 hours, or if rain is expected in the next 24 hours.

Do not apply materials in rainy conditions or within 5 days after surfaces have become wet from rainfall or other moisture.

3.17.13 INSPECTION-

Applicator shall notify manufacturer's representative a minimum of 72 hours prior to scheduled application for field inspection.

3.17.14 APPLICATION-

Preparation of Surface (As applicable):

Do not commence application until surface is structurally sound, clean, dry, and free from excess dust, loose paint, greasy stains and efflorescence.

Form oils should be completely removed.

All cracks, voids, beeholes or mortar shrinkage shall be properly repaired and primed if necessary to make the surface uniform.

Allow substrate to dry and age at least 3 weeks before applications of anti-graffiti coating.

Porous concrete block should be sealed with approved "Rainproof Acryseal WD" or Monochem Aquaseal HD a minimum of 48 hours before application of anti-graffiti coating material.

If using "Graffitibase" material over a previously paint coated surface apply a small amount in an inconspicuous place to check for lifting.

Remove existing graffiti with "WipeOut" graffiti remover or approval equal. "WipeOut" product of National Chemsearch, Irving Texas, phone (1-(800)-527-9921).

Applicator/Contractor to use the application tools and methods as recommended by the coating manufacturer and approved by the City Engineer or the Consultant.

Applicator/Contractor is responsible for daily application of a small test area on surface to be coated before starting daily general application to assure desired results, especially if there have been temperature changes during application.

Application of Anti-Graffiti Coating:

Coverage: Apply materials at rate per square foot recommended by the material manufacturer.

Application Sequence: Apply two coats of the material "Graffitibase" followed by one coat of "Graffiticatcher" in compliance with manufacturer's specifications and recommendations.

A minimum drying time of two hours should be allowed between the first and second coats of "Graffitibase".

A minimum drying time of 4 hours should be allowed between the "Graffitibase" and the "Graffiticatcher".

Anti-graffiti coating process should achieve a non-yellowing, durable, clear film completely protecting the substrate from penetration of paint, ink, crayons, dirt, air pollutants, grime and similar materials and help maintain and protect the original appearance of the surface.

"Graffitibase" material should be applied with a "crosshatch" method of several horizontal passes followed immediately by vertical passes to build up a heavy wet film to insure sufficient uniformity. This is considered one coat and the same method is repeated for the second coat to build a minimum dry film thickness of 3 mils. Spray large areas in sections so overlap occurs before previously coated areas have dried. Start application at top of wall and work down surface. Schedule work so that the stopping point each day falls at an opening, column or corner.

"Graffiticatcher" should be applied with a "crosshatch" method of several horizontal passes followed immediately by vertical passes to build up a film to insure sufficient uniformity. This is considered one coat.

Protection: Applicator shall be responsible for protection of this and all adjacent work from damage during application with dropcloths or other suitable materials.

3.17.15 CLEAN-UP AND REPAIRS-

Required Clean-Up:. Contractor shall carefully remove all protection materials from adjacent surfaces and any residue resulting from this operation. Completely remove overspray and spills as soon as possible before curing and excess materials from the job-site.

Repairs: Any soiling of the work of this section shall be repaired by the installer of the anti-graffiti material as approved by the City Engineer or the Consultant at no added cost to the City.

3-19 PAINTS AND COATINGS