Graphic Design
The graphic, architectural, landscape, and
The graphic, architectural, landscape, and
industrial design elements of the plan will be
industrial design elements of the plan will be
dened by a palette of materials that shape the
dened by a palette of materials that shape the
Gateway’s idea of place and identity. Dened as
Gateway’s idea of place and identity. Dened as
“Sleek”, this design vocabulary
“Sleek”, this design vocabulary sets a frameworksets a framework
for making decisions
for making decisions regarding the form, color,regarding the form, color,
texture, image, typography, lighting and materials
texture, image, typography, lighting and materials
of the architectural, hardscape, landscape
of the architectural, hardscape, landscape
and other environmental graphic design (EGD)
and other environmental graphic design (EGD)
elements in
elements in the Gateway.the Gateway.
Sleek
Sleek
The purpose of Gateway’s design vocabulary
The purpose of Gateway’s design vocabulary
is to communicate that this is an urban space
is to communicate that this is an urban space
on different scales, that the City is a modern
on different scales, that the City is a modern
environment looking to the future, and to create
environment looking to the future, and to create
consistency
consistency. . “Sleek” is dened as urbane,“Sleek” is dened as urbane,
positive and inviting. The goal is to make the
positive and inviting. The goal is to make the
Gatewa
Gateway’s elements polished and urban y’s elements polished and urban inin
character. A good model to follow is
character. A good model to follow is the newthe new
signage for the North Riverfront Trail which
signage for the North Riverfront Trail which
presents a progressive, modern image of the City
presents a progressive, modern image of the City
through design, color and fonts.
through design, color and fonts.
Sleek Criteria
Sleek Criteria
In selecting all of the
In selecting all of the wayndiwaynding and streetng and street
infrastructure including lights, planters, tree
infrastructure including lights, planters, tree
grates, benches, etc. the following criteria should
grates, benches, etc. the following criteria should
be considered in order to maintain the
be considered in order to maintain the level of level of
consistency needed for the full length of
consistency needed for the full length of thethe
Gateway.
Gateway.
Form
Form
Contemporary shapes and relationships that
Contemporary shapes and relationships that avoidavoid
sharp intersections of line and plane.
sharp intersections of line and plane.
Color
Color
Light and bright, varied in
Light and bright, varied in intensity, analogous coolintensity, analogous cool
colors.
colors.
Texture
Texture
Smooth, polished and mirrored nishes, contrasted
Smooth, polished and mirrored nishes, contrasted
with smooth, matte, possibly sandblasted textures.
with smooth, matte, possibly sandblasted textures.
Image
Image
Positive, clean uplifting, even coolly whimsical in
Positive, clean uplifting, even coolly whimsical in
nature. Clear, simple, graphic and
nature. Clear, simple, graphic and lively.lively.
Typography
Typography
Classic, approachable, balanced, well placed and
Classic, approachable, balanced, well placed and
integrated into the design. Type to be read as image,
integrated into the design. Type to be read as image,
and image to be read as type.
and image to be read as type.
Materials Palette
Materials Palette
The materials palette solidi
The materials palette solidies the concept in es the concept in aa
tactile and realistic manner. The materials include
tactile and realistic manner. The materials include
but are not limited to the following: edge-light acrylic,
but are not limited to the following: edge-light acrylic,
mirrored acrylic, polished stainless steel, color
mirrored acrylic, polished stainless steel, color
saex glass, lathed
saex glass, lathed hardwarehardware, embossed , embossed aluminum,aluminum,
color anodized aluminum, wire screens, dichroic
color anodized aluminum, wire screens, dichroic
glass, photovoltaic panels, black honed marble and
glass, photovoltaic panels, black honed marble and
patterned frosted glass.
6 6 . . 0 0 D D e e t t a a i i l l D D e e s s i i g g n n E E l l e e m m e e n n t t s s Sleek materials Sleek materials
7.0 Implementation
7.0 Implementation
Funding and constructing the Master Plan recommendations – implementing the ideas – will be the true
Funding and constructing the Master Plan recommendations – implementing the ideas – will be the true
measure of this Plan’s succe
measure of this Plan’s success. ss. A delivery strategy is outlined hereA delivery strategy is outlined here: : specicallspecically, this section highliy, this section highlightsghts
options and recommendations for the
options and recommendations for the nancing, management, operations and programminancing, management, operations and programming strategies forng strategies for
implementing the Gateway Mall Master Plan.
7 7 . . 0 0 I I m m p p l l e e m m e e n n t t a a t t i i o o n n
7.0 Implementation
7.0 Implementation
The implementation of the Master Plan should be
The implementation of the Master Plan should be
guided by a set of principles:
guided by a set of principles:
• Increase the enjoyment of park visitors;
• Increase the enjoyment of park visitors;
• Initiate and sustain high
• Initiate and sustain high standards of standards of
maintenance;
maintenance;
• Ensure that the park is a
• Ensure that the park is a safe envirosafe environment for allnment for all
users; and
users; and
• Increase the range of
• Increase the range of visitors through publicity,visitors through publicity,
events, programs, and public involvement.
events, programs, and public involvement.
Implementation of Gateway Mall Master Plan
Implementation of Gateway Mall Master Plan
should proceed on multiple fronts to maximize
should proceed on multiple fronts to maximize
the potential for success. Relying solely on capital
the potential for success. Relying solely on capital
improvements to “x” the park and “get people
improvements to “x” the park and “get people
to use it” will not be enough. Programmatic and
to use it” will not be enough. Programmatic and
maintenance initiatives must be addressed as well,
maintenance initiatives must be addressed as well,
by developing new programs, managing existing
by developing new programs, managing existing
and new special events, increasing security, and
and new special events, increasing security, and
developing a constituency within the City of St.
developing a constituency within the City of St.
Louis for the long-term care and support
Louis for the long-term care and support of theof the
Mall.
Mall.
The GWMMC should form the Gateway Mall
The GWMMC should form the Gateway Mall
Advisory Board (GWMAB) to include leadership/
Advisory Board (GWMAB) to include leadership/
stakeholders from the public and private sectors.
stakeholders from the public and private sectors.
The GWMAB would meet regularly to monitor
The GWMAB would meet regularly to monitor
the implementation of the Master Pla
the implementation of the Master Plan, overseen, oversee
and review compliance with the Plan,
and review compliance with the Plan, review anyreview any
signicant modica
signicant modications to the tions to the Plan, and constitutePlan, and constitute
a public review process for major Mall projects.
a public review process for major Mall projects.
Funding and Building the
Funding and Building the GatewayGateway
Private monies, via philanthropic organizations, for
Private monies, via philanthropic organizations, for
capital improvements will be needed to construct
capital improvements will be needed to construct
the Mall.
the Mall. Additional funding sourceAdditional funding sources for capitals for capital
improvement and operating costs will be needed
improvement and operating costs will be needed
to meet
to meet the prothe projected jected expenses. expenses. Taxation Taxation optionsoptions
may be available.
may be available.
Tra
Transforming the Mall will nsforming the Mall will incur signicant costs,incur signicant costs,
and correctly phasing capital
and correctly phasing capital improvemeimprovements isnts is
vital to achieve the desired effect of the plan.
vital to achieve the desired effect of the plan.
Citygarden is being completed in 2009 with
Citygarden is being completed in 2009 with a $35a $35
million dollar investment.
million dollar investment.
Managing the Gateway
Managing the Gateway
The day-to-day delivery of services will ultimately
The day-to-day delivery of services will ultimately
determine how well or how poorly the project
determine how well or how poorly the project
fares.
fares. The GatewaThe Gateway Mall should be managed byy Mall should be managed by
a public/private partnership. Many public/private
a public/private partnership. Many public/private
partnerships now exist and have proven to be
partnerships now exist and have proven to be
invaluable in helping to improve, manage, maintain,
invaluable in helping to improve, manage, maintain,
and program public space, particularly public parks.
and program public space, particularly public parks.
They have been very successful in
They have been very successful in raising privateraising private
funds and resources for park
funds and resources for park capital improvementscapital improvements
and ongoing maintenance and operations.
and ongoing maintenance and operations.
A Gateway Mall Management Committee (GWMMC)
A Gateway Mall Management Committee (GWMMC)
should to coordinate design, construction and
should to coordinate design, construction and
management efforts for the Mall between the
management efforts for the Mall between the
various public and private entities inv
various public and private entities involved. olved. A newlyA newly
formed Gatewa
formed Gateway Mall Conservancy y Mall Conservancy (GWMC) should(GWMC) should
become the primary organization responsible for
become the primary organization responsible for
fundraising and specic management tasks in the
fundraising and specic management tasks in the
Mall. A written agreement between the City and the
Mall. A written agreement between the City and the
Conservancy should be developed that details those
Conservancy should be developed that details those
responsibilities.
7 7 . . 0 0 I I m m p p l l e e m m e e n n t t a a t t i i o o n n
The Master Plan proposes a number of kiosks and
The Master Plan proposes a number of kiosks and
concessions to serve park visitors. E
concessions to serve park visitors. Earned revenuearned revenue
from those concessions, though expected to be
from those concessions, though expected to be
limited in the short term, should be directed to a
limited in the short term, should be directed to a
special fund to be used to
special fund to be used to pay for improvpay for improvements,ements,
maintenance and operations within the Mall. The
maintenance and operations within the Mall. The
GWMC should focus on a balance
GWMC should focus on a balance of revenue-of revenue-
generating events/programs that might
generating events/programs that might generategenerate
annual income, with revenue-neutral events that
annual income, with revenue-neutral events that
extend the benets of the
extend the benets of the park to a broader grouppark to a broader group
of citizens. These could include annual plant and
of citizens. These could include annual plant and
product sales, holiday markets, concerts, and so
product sales, holiday markets, concerts, and so
forth.
forth.
Maintenance,Stafng,andSecurity
Maintenance,Stafng,andSecurity
The goal for the maintenance of Gateway Mall is
The goal for the maintenance of Gateway Mall is
to ensure that the Mall is clean, attractive and
to ensure that the Mall is clean, attractive and
usable for visitors. Management strategies must
usable for visitors. Management strategies must
recognize the need for constant, vigilant cleaning
recognize the need for constant, vigilant cleaning
and horticultural care to protect the Mall while
and horticultural care to protect the Mall while
encouraging people to enjoy the park to its
encouraging people to enjoy the park to its fullest.fullest.
A Park Ranger/Ambassador program can be
A Park Ranger/Ambassador program can be
particularly effective in:
particularly effective in:
• Providing a “public face” to park visitors;
• Providing a “public face” to park visitors;
• Functioning as park greeters and educators,
• Functioning as park greeters and educators,
in addition to being the park’s “eyes and ears”
in addition to being the park’s “eyes and ears”
along with the park maintenance staff;
along with the park maintenance staff;
• Primarily concerned with the quality of
• Primarily concerned with the quality of thethe
visitor’s experience;
visitor’s experience;
• Trained to be proactive rather than reactive with
• Trained to be proactive rather than reactive with
regards to park enforcement issues, intervene
regards to park enforcement issues, intervene
before there is a problem; and
before there is a problem; and
• Receive a short training program in conict
• Receive a short training program in conict
resolution.
resolution.
Ultimately, people actively using the Park are
Ultimately, people actively using the Park are thethe
best way to ensure that the park
best way to ensure that the park is safe.is safe.
Direct accountability and “ownership” are critical
Direct accountability and “ownership” are critical
elements for park staff in
elements for park staff in order to ensure theorder to ensure the
sense of commitment required to properly maintain
sense of commitment required to properly maintain
such a prominent urban space. Park
such a prominent urban space. Park maintenancemaintenance
should be led by a Park Manager and carried out by
should be led by a Park Manager and carried out by
dedicated, uniformed and multi-skilled park-based
dedicated, uniformed and multi-skilled park-based
staff whose responsibilities would include cleaning,
staff whose responsibilities would include cleaning,
horticultural work, park maintenance, and simple
horticultural work, park maintenance, and simple
repair tasks. In-house maintenance staff would be
repair tasks. In-house maintenance staff would be
supplemented with contracted services, such as
supplemented with contracted services, such as
fountain maintenance, Community
fountain maintenance, Community ImprovImprovementement
District crews and part-time seasonal staff.
District crews and part-time seasonal staff.
Park security will continue to primarily be the
Park security will continue to primarily be the
responsibility of the St. Louis Police Department.
responsibility of the St. Louis Police Department.
The Downtown Community Improvement District
The Downtown Community Improvement District
does have a supplemental hospitality/security c
does have a supplemental hospitality/security crewrew
and expanding them to include the Mall should be
and expanding them to include the Mall should be
investigated.
7 7 . . 0 0 I I m m p p l l e e m m e e n n t t a a t t i i o o n n
Managing, funding, building,
Managing, funding, building,
maintaining, staffing and programming
maintaining, staffing and programming
are key to the implementation
are key to the implementation
and success of the Gateway Mall
7 7 . . 0 0 I I m m p p l l e e m m e e n n t t a a t t i i o o n n
Park Rangers/Ambassadors act as eyes and ears
Park Rangers/Ambassadors act as eyes and ears
To ensure that these new landscape areas do not
To ensure that these new landscape areas do not
deteriorate because of overuse by special
deteriorate because of overuse by special events,events,
special event guidelines should be developed for
special event guidelines should be developed for
the Mall to protect its landscape
the Mall to protect its landscape areas. The Gatewayareas. The Gateway
Mall is already the venue for many large special
Mall is already the venue for many large special
events.
events.
A regular schedule of public
A regular schedule of public programs should beprograms should be
develope
developed, perhaps including a concert or d, perhaps including a concert or lm serieslm series
to attract a new constituency to the park and better
to attract a new constituency to the park and better
serve the city as a
serve the city as a whole. whole. These programs These programs wouldwould
be scheduled for weekdays and
be scheduled for weekdays and weekday evenings.weekday evenings.
A “jump start”
A “jump start” program could involve engaging program could involve engaging
adjacent businesses to sponsor programs during
adjacent businesses to sponsor programs during
lunch and before or after work, targeting employees
lunch and before or after work, targeting employees
who are present during weekdays and weekday
who are present during weekdays and weekday
evenings.
evenings.
ProgrammingActivitiesandEvents
ProgrammingActivitiesandEvents
The Master Plan provides for a range of spaces
The Master Plan provides for a range of spaces
offering informal and formal activities. This ensures
offering informal and formal activities. This ensures
a wider client base with activity spread throughout
a wider client base with activity spread throughout
a longer portion of
a longer portion of the day. Programmed activitiesthe day. Programmed activities
are important to the long-term success of the
are important to the long-term success of the
Gateway Mall. Trees, paths, lawns, and plantings
Gateway Mall. Trees, paths, lawns, and plantings
are the backbone of the park, but people are its
are the backbone of the park, but people are its
life-blood. The people who regularly visit the
life-blood. The people who regularly visit the parkpark
and enjoy its facilities
and enjoy its facilities come for many reasons.come for many reasons.
Their presence in itself is often an attraction for
Their presence in itself is often an attraction for
other people who might stay away if the park
other people who might stay away if the park
was perceived to be unused,
was perceived to be unused, and thereforeand therefore
unwelcoming; or too empty and
unwelcoming; or too empty and therefore, unsafe.therefore, unsafe.
The new plan identies areas for special events
The new plan identies areas for special events
while consolidating existing paved areas into the
while consolidating existing paved areas into the
new park design. New or redesigned special event
new park design. New or redesigned special event
areas include:
areas include:
• Kiener Plaza
• Kiener Plaza
• Civic Room’s exible lawn areas and adjacent
• Civic Room’s exible lawn areas and adjacent
streets
streets
• Milles Fountain and the