• No se han encontrado resultados

Valores hematológicos normales en altura para hembra y macho

2. OBJETIVOS Y JUSTIFICACIÓN

4.1. DE LA DETERMINACIÓN DE LOS VALORES HEMATOLÓGICOS

4.3.1. Valores hematológicos normales en altura para hembra y macho

1. This machine has been through anti-rust treatment before sending out from the factory, and to lock up the X, Z axles and tail stock with fixed frame, when the machine is completing installation, please dismount the fixed frame, and then use a rag to dap a little oil to clean the anti-rust oil all over the machine.

Warning: Please do not the use air compressor to clean the machine because foreign objects such as dust and miscellaneous will bounce into the connection or the rift of other parts which will damage the surface.

2. When dismount knife rack and the water-proof tape of the chuck and the handling equipment.

3. After cleaning the machine, please add hydraulic oil lubricant and cutting liquid.

Warning: Before proceed with the cleaning at this chapter, please confirm the power switch lock up at ’’Off” position, anion the process do not discharge the electricity.

4. Please set the lubricant pump output amount at 12-minute interval for 5-second in feeding of oil (the amount has been set before ex-factory, please reconfirm), and use manual feeding oil for several times.

5.2. Horizontal adjustment

Horizontal adjustment is very important and may decide the precision of the machine.

The horizontal adjustment of the machine is very easy, but will affect the processing precision and the life of the machine. Therefore, please follow the following procedures to adjust the machine.

First, use the packing-up block to make a good base,(P.3-2-2) then adjust the bottom bed studs and fix. Next, put the level above the tailstock (please refer to P.5-2-2). Now, move tailstock to the total stroke.

(TNL-100 ALII/120 ALII/13 0 All 600 mm/23.6 inch).

(Do not interfere the chuck and tail stock). Adjust until the allowance is 0.04 mm/m (0.0005 inch/ft). Level precision is 0.02 mm/m (0.00025 inch/ft).

The surface for laying the level must be cleaned up. Please screw up the basic studs. In order to control the degree of horizontal, please do not use plastic mud to fix the machine.

If the working pieces are abnormal and uneven, please use a anchor shape stud to resist against and to fix the machine.

Check the horizontal level line of the machine consecutively, then once a month for 6 months, afterwards to check every 3 month.

OPERATION MANUAL

NCT Ipari Elektronikai Kft. 41/82 Date: 18.02.2014

1148 Budapest, Fogarasi út 7.

Tel.: 06 1 467 6300 www.nct.hu

OPERATION MANUAL

NCT Ipari Elektronikai Kft. 42/82 Date: 18.02.2014

1148 Budapest, Fogarasi út 7.

Tel.: 06 1 467 6300 www.nct.hu 5.3. Safety check

In order to ensure your safety and the normal operation of the machine, please proceed with safety check of the machine based on the following check and inspection table:

A. Check before delivery of electricity

1. Please make sure the power source is 3-phase, 60 Hz, 220 VAC.

2. Please make sure the power source wire diameter is 22 mm, and the phase is correct.

3. Please make sure the external protective conductor (grounding) has been installed.

4. Please make sure the power source supply side has equipped with a leaking breaker which meet the specification requirement, (sensitivity 50 A).

5. Please make sure the fixed rack has been dismounted.

6. Please make sure the chuck has been clipped tight, and there is no any loose and disposition material allowed.

7. Please insert the accessory plug in the chuck in the course of machining non-bar material, in order to prevent coolant and chips from getting backwards into the puller.

8. Please check weekly whether chips have been accumulated behind the cover of the coolant collector at the chuck puller; clean it if necessary. Lack of cleaning may result in damage of the puller.

9. Please make sure the basic screw has been screwed up.

10. Please make sure the cutting bucket plate work has been fixed and the position of the cutting is normal.

11. Please make sure the oil and water pipes did not loose and the cutting water level is normal.

12. Please make sure the face cover and safety gate are intact.

13. Please make sure the lubricant has filled up the pipe.

14. Please make sure the oil pressure sump has adequate oil pressure oil.

15. Please make sure there are no any loose items above the knife rack.

16. Please make sure the limit switch and dog have not moved.

17. Please make sure the driving belt of the drive axle has been installed and have not loosened.

18. Please make sure there is no foreign object surrounding the machine.

B. Check after delivery of electricity

Attention: before executing this operation, please read Chapter 6 carefully, so as to understand the button pressing function and the opening procedure of the machine.

1. Make sure the oil pressure oil pump and cutting water pump are turning the right direction, the pressure meter indicator is going up, otherwise it should be stop to do immediate inspection, if change of phase is necessary, please refer to P.47, section 4-3 to carry out.

2. Make sure the emergency stop button is functional.

OPERATION MANUAL

NCT Ipari Elektronikai Kft. 43/82 Date: 18.02.2014

1148 Budapest, Fogarasi út 7.

Tel.: 06 1 467 6300 www.nct.hu

3. Make sure the ON, OFF function of the NC power is functional.

4. Make sure each button’s function is normal.

5. To turn the sliding table with manual button, make sure the lubricant has been sent.

6. The restore action of the executing point, make sure it is under normal condition.

7. Turn the revolution speed adjusting button of the drive axle to the minimum position;

make sure the function of every button on the drive axle unit are normal.

8. To make sure the interlock device of the safety gate is functional and normal.

9. Make sure other buttons’ function is under normal condition.

10. Make sure there is no leaking oil or water happened.

11. Make sure computer program control function is normal.

OPERATION MANUAL

NCT Ipari Elektronikai Kft. 44/82 Date: 18.02.2014

1148 Budapest, Fogarasi út 7.

Tel.: 06 1 467 6300 www.nct.hu

6. SETTING AND ADJUSTING