VIDRIOS, CRISTALES Y SIMILARES 0.00 0

In document VALORIZACION 09 (página 118-122)

VALORIZACION DE OBRA N° 05 MES DE JUNIO

02.08 VIDRIOS, CRISTALES Y SIMILARES 0.00 0

02.08.01 VIDRIOS SEMIDOBLES IMPORTADOS p2 187.16 3.99 746.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 187.16 746.77 100.00%

02.09 PINTURA

CONSORCIO PATROMAQ

VALORIZACION DE OBRA N° 05 - MES DE JUNIO 2013

OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 6/30/2013

MODALIDAD: CONTRATA REGION: JUNIN

EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO

RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON

SUPERVISOR ARQ. RAUL HINOSTROZA CANO

PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO

Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.

%

Metrado ValorizadoS/.

%

02.09.02 PINTURA EN MUROS EXTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 151.22 8.53 1,289.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 151.22 1289.91 100.00% 02.09.03 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2 98.80 7.61 751.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 98.80 751.87 100.00% 02.09.04 PINTURA LATEX LAVABLE DOS MANOS EN DERRAMES m 82.10 3.22 264.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 82.10 264.36 100.00% 02.09.05 PINTURA ESMALTE SINTETICO EN BRUÑAS m 194.82 3.23 629.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 194.82 629.27 100.00% 02.09.06 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 34.80 16.72 581.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 34.80 581.86 100.00% 02.09.07 PINTURA ESMALTE DOS MANOS EN ZOCALO DE CEMENTO m2 41.35 10.02 414.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 41.35 414.33 100.00% 02.09.08 PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS - PTA / VENT m2 100.33 9.46 949.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 100.33 949.12 100.00%

02.10 CUBIERTAS

02.10.01 COBERTURA CON TEJA ANDINA INDUSTRIAL m2 208.60 38.46 8,022.76 0.00 0.00 208.60 8022.76 208.60 8022.76 100.00% 0.00 0.00 0.00% 02.10.02 CUMBRERA DE TEJA ANDINA INDUSTRIAL m 20.38 47.21 962.14 0.00 0.00 20.38 962.14 20.38 962.14 100.00% 0.00 0.00 0.00%

02.11 VARIOS, LIMPIEZA Y JARDINERIA

02.11.01 JUNTA DE DILITACION RELLENO CON MORTERO ASFALTICO E= 1´ m 28.50 6.64 189.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 28.50 189.24 100.00%

02.11.02 LIMPIEZA FINAL DE OBRA m2 72.09 2.80 201.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 72.09 201.85 100.00%

03 INSTALACIONES ELÉCTRICAS

03.01 SALIDA DE ALUMBRADO

03.01.01 SALIDA DE TECHO ( CENTRO DE LUZ) pto 18.00 82.33 1,481.94 18.00 1,481.94 0.00 0.00 18.00 1481.94 100.00% 0.00 0.00 0.00%

03.02 SALIDA PARA TOMACORRIENTE

03.02.01 SALIDA PARA INTERRUPTOR SIMPLE pto 13.00 32.27 419.51 0.00 0.00 13.00 419.51 13.00 419.51 100.00% 0.00 0.00 0.00%

03.03 CAJAS DE PASO

03.03.01 CAJA DE PASE FºGº 4 X 4 X 2" und 4.00 25.72 102.88 0.00 0.00 4.00 102.88 4.00 102.88 100.00% 0.00 0.00 0.00%

03.04 SISTEMA DE PUESTA A TIERRA

03.04.01 POZO PUESTA A TIERRA (R < 15 Ohms) und 2.00 990.63 1,981.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 1981.26 100.00%

03.05 ELECTRODUCTOS

03.05.01 EXCAVACION DE ZANJAS PARA REDES EXT. SANIT. - ELECT. m3 1.23 19.55 24.05 1.23 24.05 0.00 0.00 1.23 24.05 100.00% 0.00 0.00 0.00% 03.05.02 TUBERIA PVC - P 20mm m 143.50 9.66 1,386.21 143.50 1,386.21 0.00 0.00 143.50 1386.21 100.00% 0.00 0.00 0.00%

03.06 ALIMENTADORES

03.06.01 CONDUCTOR TW 2.5mm2 m 287.00 8.28 2,376.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 287.00 2376.36 100.00%

03.06.02 CONDUCTOR TW 10.0mm2 m 34.00 12.54 426.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 34.00 426.36 100.00%

03.07 TABLEROS DE DISTRIBUCIÓN ELECTRICA

03.07.01 TABLEROS DE DISTRIBUCIÓN CAJA METÁLICA pza 2.00 381.32 762.64 0.00 0.00 2.00 762.64 2.00 762.64 100.00% 0.00 0.00 0.00% 03.07.02 INTERRUPTOR THERMOMAGNETICO 2x15 A pza 2.00 58.99 117.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 117.98 100.00% 03.07.03 INTERRUPTOR THERMOMAGNETICO 2x20 A pza 4.00 61.99 247.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 247.96 100.00%

03.08 ARTEFACTOS DE ILUMINACION

03.08.01 ARTEFACTO FLUORESCENTE CIRCULAR DE 32W und 18.00 67.45 1,214.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 18.00 1214.10 100.00% 04 INSTALACIONES SANITARIAS

04.01 APARATOS Y ACCESORIOS SANITARIOS

04.01.01 INODORO TQUE BAJO DE LOSA 1RA CALIDAD ADULTO (NAC. BLANCO pza 19.00 436.51 8,293.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 19.00 8293.69 100.00%

04.01.02 JABONERA LOSA BLANCA und 9.00 40.37 363.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 9.00 363.33 100.00%

04.01.03 TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA COLOR BLAN und 9.00 25.00 225.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 9.00 225.00 100.00% 04.01.04 PORTARROLLO DE PAPEL HIGIÉNICO DE LOSA und 19.00 25.00 475.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 19.00 475.00 100.00% 04.01.05 PAPELERA PLASTICO, TAPA CON VENTANA BATIBLE pza 19.00 50.00 950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 19.00 950.00 100.00% 04.01.06 LAVATORIO DE LOSA BLANCA DE 1RA 545x460mm pza 19.00 202.78 3,852.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 19.00 3852.82 100.00% 04.01.07 URINARIO CORRIDO SEGUN DISEÑO REV. C/ MAYOLICA 20x20 m 4.55 135.86 618.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.55 618.16 100.00%

04.02 DESAGÜE

04.02.01 SALIDA DE DESAGUE EN PVC 2" pto 35.00 62.18 2,176.30 35.00 2,176.30 0.00 0.00 35.00 2176.30 100.00% 0.00 0.00 0.00% 04.02.02 SALIDA DE DESAGUE EN PVC 4" pto 19.00 70.52 1,339.88 19.00 1,339.88 0.00 0.00 19.00 1339.88 100.00% 0.00 0.00 0.00% 04.02.03 SALIDA PARA VENTILACION DE 2" pto 19.00 65.47 1,243.93 19.00 1,243.93 0.00 0.00 19.00 1243.93 100.00% 0.00 0.00 0.00%

04.03 ADITAMENTOS VARIOS

04.03.01 SUMIDERO DE BRONCE 2" und 9.00 35.78 322.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 9.00 322.02 100.00% 04.03.02 REGISTRO DE BRONCE 4" und 13.00 35.49 461.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 13.00 461.37 100.00%

04.04 CAMARAS DE INSPECCION

04.04.01 EXCAVACION DE ZANJAS 0.50x0.80 m m3 3.40 19.55 66.47 3.40 66.47 0.00 0.00 3.40 66.47 100.00% 0.00 0.00 0.00% 04.04.02 TUBERIA PVC SAP DE 2" m 33.00 16.78 553.74 33.00 553.74 0.00 0.00 33.00 553.74 100.00% 0.00 0.00 0.00% 04.04.03 TUBERIA PVC SAP DE 4" m 26.00 25.35 659.10 26.00 659.10 0.00 0.00 26.00 659.10 100.00% 0.00 0.00 0.00%

VALORIZACION DE OBRA N° 05 - MES DE JUNIO 2013

OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 6/30/2013

MODALIDAD: CONTRATA REGION: JUNIN

EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO

RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON

SUPERVISOR ARQ. RAUL HINOSTROZA CANO

PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO

Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.

%

Metrado ValorizadoS/.

%

04.04.04 CANALETA DE FIERRO GALVANIZADO m 39.56 22.36 884.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 39.56 884.56 100.00% 04.04.05 TUBERIA DE BAJADA PVC SAL 3" P/ LLUVIAS m 56.00 23.54 1,318.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 56.00 1318.24 100.00%

04.05 SISTEMA DE AGUA FRIA

04.05.01 SALIDA DE AGUA FRIA - PVC DE 1/2" pto 46.00 64.58 2,970.68 46.00 2,970.68 0.00 0.00 46.00 2970.68 100.00% 0.00 0.00 0.00%

04.06 REDES DE DISTRIBUCION

04.06.01 TUBERIA PVC CLASE 10 - 1/2" ROSCADA m 76.00 8.80 668.80 0.00 0.00 76.00 668.80 76.00 668.80 100.00% 0.00 0.00 0.00%

04.07 LLAVES Y VALVULAS

04.07.01 VALVULA DE COMPUERTA DE BRONCE 1/2" und 12.00 75.44 905.28 0.00 0.00 12.00 905.28 12.00 905.28 100.00% 0.00 0.00 0.00% 04.07.02 SOMBRERO PARA VENTILACION EN PVC DE 2" und 14.00 1.90 26.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 14.00 26.60 100.00%

7.00

01 ESTRUCTURAS

01.01 TRABAJOS PRELIMINARES

01.01.01 TRAZO, NIVELES Y REPLANTEO m2 1,525.89 2.42 3,692.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1525.89 3692.65 100.00% 01.01.02 REPLANTEO DURANTE EL PROCESO m2 1,489.27 0.67 997.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1489.27 997.81 100.00% 01.01.03 LIMPIEZA MANUAL DE TERRENO m2 1,489.27 1.13 1,682.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1489.27 1682.88 100.00%

01.02 MOVIMIENTO DE TIERRAS

01.02.01 CORTE MASIVO DE TERRENO A MÁQUINA m3 297.85 7.31 2,177.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 297.85 2177.28 100.00% 01.02.02 EXCAVACIÓN C/ MÁQUINA EN T.N. HASTA H= -1.8 m3 21.74 12.68 275.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 21.74 275.66 100.00% 01.02.03 EXCAVACIÓN DE ZANJAS Y ZAPATA RT<2 kg/cm2 H=1.30 M m3 35.57 27.92 993.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 35.57 993.11 100.00% 01.02.04 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO CON EQUIPO m2 1,489.27 7.87 11,720.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1489.27 11720.55 100.00% 01.02.05 RELLENO COMPACTADO C/EQ. MAT./ PROPIO m3 745.87 19.91 14,850.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 745.87 14850.27 100.00% 01.02.06 RELLENO DE ZANJA P/ DRENAJE CON PIEDRA MEDIANA 4" m3 10.80 46.01 496.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.80 496.91 100.00% 01.02.07 RELLENO CON GRAVA COMPACTADA C/ 15 cm m3 8.40 62.22 522.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.40 522.65 100.00% 01.02.08 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES m3 426.60 16.28 6,945.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 426.60 6945.05 100.00% 01.02.09 ELIMINACIÓN MATERIAL EXCEDENTE ACARREADO m3 430.80 21.03 9,059.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 430.80 9059.72 100.00% 01.02.10 NIVELACIÓN INTERIOR Y APISONADO PARA F.PISO, PATIO Y VEREDAS m2 38.39 3.82 146.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 38.39 146.65 100.00% 01.02.11 AFIRMADO DE 4" PARA PISOS, PATIOS, VEREDAS COMPACTADO. m2 38.39 12.27 471.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 38.39 471.05 100.00%

01.03 OBRAS DE CONCRETO SIMPLE

01.03.01 BASES

01.03.01.01 SOLADO E=4" MEZCLA 1:10 C:H INC. CURADO m2 2.98 26.90 80.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.98 80.16 100.00% 01.03.01.02 SUBCIMIENTO, SUB ZAPATA MEZCLA 1:12 + 30 P.G m3 1.20 182.08 218.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.20 218.50 100.00% 01.03.01.03 CIMIENTOS CORRIDOS 1:10 + 30% P.G F´>=100 kg/cm2 m3 5.27 177.95 937.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.27 937.80 100.00% 01.03.01.04 CIMIENTOS ENCOFRADO Y DESENCOFRADO m2 10.76 33.07 355.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.76 355.83 100.00% 01.03.02 SOBRECIMIENTOS

01.03.02.01 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M F´c >= 100 kg/cm2 m3 1.03 237.78 244.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.03 244.91 100.00% 01.03.02.02 SOBRECIMEINTO, ENCOFRADO Y DESENCOFRADO m2 13.62 27.90 380.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 13.62 380.00 100.00% 01.03.02.03 FALSO PISO MEZCLA 1.8 E=4" m2 21.12 30.01 633.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 21.12 633.81 100.00%

01.04 OBRAS DE CONCRETO ARMADO

01.04.01 ZAPATAS CORRIDAS

01.04.01.01 CIMIENTOS REFORZADOS CONCRETO F´c= 210 kg/cm2 m3 1.89 283.02 534.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.89 534.91 100.00% 01.04.01.02 CIMIENTOS REFORZADOS, ACERO Fy= 4200 kg/cm2 kg 96.29 4.46 429.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 96.29 429.45 100.00% 01.04.02 ZAPATAS

01.04.02.01 ZAPATAS - CONCRETO 210 kg/cm2 m3 4.29 325.75 1,397.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.29 1397.47 100.00% 01.04.02.02 ZAPATAS, ENCOFRADO Y DESENCOFRADO m2 18.00 44.53 801.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 18.00 801.54 100.00% 01.04.02.03 ZAPATAS - ACERO Fy=4200 kg/cm2 kg 61.00 4.46 272.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 61.00 272.06 100.00% 01.04.03 VIGAS DE CONEXIÓN

01.04.03.01 VIGAS DE CONEXIÓN - CONCRETO 210 kg/cm2 m3 1.04 297.67 309.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.04 309.58 100.00% 01.04.03.02 VIGAS DE CONEXIÓN - ENCOFRADO Y DESENCOFRADO m2 8.32 41.28 343.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.32 343.45 100.00% 01.04.03.03 VIGAS DE CONEXIÓN - ACERO Fy=4200 kg/cm2 kg 86.46 4.46 385.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 86.46 385.61 100.00% 01.04.04 COLUMNAS

01.04.04.01 COLUMNAS - CONCRETO 210 kg/cm2 - 1 PISO m3 2.88 419.86 1,209.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.88 1209.20 100.00% 01.04.04.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO m2 48.08 47.49 2,283.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 48.08 2283.32 100.00% 01.04.04.03 COLUMNAS - ACERO Fy=4200 kg/cm2 kg 674.15 4.46 3,006.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 674.15 3006.71 100.00% 01.04.05 CISTERNA

OBRAS EXTERIORES: CASA DE FUERZA-COCINA, TANQ. ELEV. - CISTERNA, PATIO DE FORMACIÓN MULTIUSOS, LOSA DEPORTIVA Y RED EXTERNA DE INST. SANITARIAS Y ELÉCTRICAS

CONSORCIO PATROMAQ

VALORIZACION DE OBRA N° 05 - MES DE JUNIO 2013

OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 6/30/2013

MODALIDAD: CONTRATA REGION: JUNIN

EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO

RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON

SUPERVISOR ARQ. RAUL HINOSTROZA CANO

PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO

Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.

%

Metrado ValorizadoS/.

%

01.04.05.01 CISTERNA, CONCRETO F´c=210 kg/cm2 m3 7.05 390.42 2,752.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.05 2752.46 100.00% 01.04.05.02 CISTERNA, ENCOFRADO Y DESENCOFRADO m2 51.49 46.40 2,389.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 51.49 2389.14 100.00% 01.04.05.03 CISTERNA, ACERO Fy=4200 kg/cm2 kg 296.92 4.46 1,324.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 296.92 1324.26 100.00% 01.04.06 VIGAS

01.04.06.01 VIGAS - CONCRETO 210 kg/cm2 - 1 PISO m3 1.31 356.11 466.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.31 466.50 100.00% 01.04.06.02 VIGAS - ENCOFRADO Y DESENCOFRADO m2 15.78 51.08 806.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 15.78 806.04 100.00% 01.04.06.03 VIGAS - ACERO Fy=4200 kg/cm2 kg 146.14 4.46 651.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 146.14 651.78 100.00% 01.04.07 TANQUE ELEVADO

01.04.07.01 TANQUES ELEVADOS - CONCRETO 210 kg/cm2 m3 4.47 381.67 1,706.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.47 1706.06 100.00% 01.04.07.02 TANQUES ELEVADOS - ENCOFRADO Y DESENCOFRADO m2 43.16 57.76 2,492.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 43.16 2492.92 100.00% 01.04.07.03 TANQUES ELEVADOS - ACERO Fy=4200 kg/cm2 kg 300.54 4.46 1,340.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 300.54 1340.41 100.00%

01.05 MUROS Y TABIQUES DE ALBAÑILERIA

01.05.01 MUROS DE LADRILLO KK TIPO IV SOGA M: 1:1:4 E=1.5 CM m2 60.72 70.65 4,289.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 60.72 4289.87 100.00% 01.05.02 ALAMBRE #8 REFUERZO HORIZONTAL EN MUROS kg 10.29 4.76 48.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.29 48.98 100.00%

01.06 ESTRUCTURA DE MADERA

01.06.01 TIJERAL DE MADERA TORMILLO 4"X8"X8.00 M m 6.00 224.26 1,345.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 1345.56 100.00% 01.06.02 CORREAS DE MADERA TORNILLO m 7.50 11.36 85.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.50 85.20 100.00%

02 ARQUITECTURA

02.01 REVOQUES ENLUCIDOS Y MOLDURAS

02.01.01 TARRAJEO EN MURO: INTERIOR Y EXTERIOR m2 75.66 17.15 1,297.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 75.66 1297.57 100.00%

02.01.02 TARRAJEO DE COLUMNAS m2 48.08 26.89 1,292.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 48.08 1292.87 100.00%

02.01.03 TARRAJEO DE VIGAS m2 15.78 39.63 625.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 15.78 625.36 100.00%

02.01.04 VESTIDURA DE DERRAMES (1:5) m 31.50 11.08 349.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 31.50 349.02 100.00% 02.01.05 BRUÑAS SEGUN DETALLE (1 X 1 cm) m 87.46 4.35 380.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 87.46 380.45 100.00%

02.02 CIELORRASOS 0.00 0.00

02.02.01 FALSO CIELO RASO DESMONTABLE m2 48.86 96.41 4,710.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 48.86 4710.59 100.00%

02.03 PISOS Y PAVIMENTOS 0.00 0.00

02.03.01 CONTRAPISO DE 40 mm m2 25.47 21.55 548.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.47 548.88 100.00%

02.03.02 PISO CERAMICO DE 0.40X0.40 ANTIDESLIZANTE BEIGE CLARO m2 25.47 59.20 1,507.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.47 1507.82 100.00% 02.03.03 VEREDA DE CONCRETO 175 kg/cm2 E=4" m2 12.92 44.71 577.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.92 577.65 100.00% 02.03.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 4.35 103.16 448.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.35 448.75 100.00% 02.03.05 LOSAS MULTIUSO - CONCRETO 175 kg/cm2 m3 223.00 269.37 60,069.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 223.00 60069.51 100.00% 02.03.06 LOSAS MULTIUSO - ENCOFRADO Y DESENCOFRADO m2 178.00 35.73 6,359.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 178.00 6359.94 100.00%

02.04 ZOCALOS Y CONTRAZOCALOS 0.00 0.00

02.04.01 ZOCALO DE MAYOLICA BLANCA 30 X 30cm COLOR m2 19.68 59.69 1,174.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 19.68 1174.70 100.00% 02.04.02 CONTRAZOCALO S/ COLOREAR H=20cm MZ 1:2 E=1.5 cm m 33.10 8.71 288.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 33.10 288.30 100.00%

02.05 CARPINTERIA DE MADERA 0.00 0.00

02.05.01 PUERTA DE MADERA APANELADA SEGÚN DISEÑO, INCLUYE DE INSTA m2 3.46 153.85 532.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.46 532.32 100.00%

02.06 CARPINTERIA METALICA Y HERRERIA 0.00 0.00

02.06.01 ESCALERA GATO EMPOTRADA DE ALUMINIO P/CISTERNA und 2.00 164.92 329.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 329.84 100.00% 02.06.02 VENTANA METÁLICA SEG. DISEÑO INC. INSTALACIÓN m2 3.84 144.61 555.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.84 555.30 100.00%

02.07 CERRAJERIA 0.00 0.00

02.07.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA pza 9.00 6.31 56.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 9.00 56.79 100.00% 02.07.02 CERRADURA P/PUERTA PRINCIPAL DE SOBREPONER und 3.00 80.69 242.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 242.07 100.00%

02.08 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00

02.08.01 VIDRIOS SEMIDOBLES IMPORTADOS p2 41.28 3.99 164.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 41.28 164.71 100.00%

02.09 PINTURA 0.00 0.00

02.09.01 PINTURA EN MUROS INTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 33.88 8.53 289.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 33.88 289.00 100.00% 02.09.02 PINTURA EN MUROS EXTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 60.72 8.53 517.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 60.72 517.94 100.00% 02.09.03 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2 63.86 7.61 485.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 63.86 485.97 100.00% 02.09.04 PINTURA LATEX LAVABLE DOS MANOS EN DERRAMES m 31.50 3.22 101.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 31.50 101.43 100.00% 02.09.05 PINTURA ESMALTE SINTETICO EN BRUÑAS m 87.46 3.23 282.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 87.46 282.50 100.00% 02.09.06 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 6.92 16.72 115.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.92 115.70 100.00% 02.09.07 PINTURA ESMALTE DOS MANOS EN ZOCALO DE CEMENTO m2 10.95 10.02 109.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.95 109.72 100.00%

VALORIZACION DE OBRA N° 05 - MES DE JUNIO 2013

OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 6/30/2013

MODALIDAD: CONTRATA REGION: JUNIN

EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO

RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON

SUPERVISOR ARQ. RAUL HINOSTROZA CANO

PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO

Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.

%

Metrado ValorizadoS/.

%

02.09.08 PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS - PTA / VENT m2 7.98 9.46 75.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.98 75.49 100.00%

02.10 CUBIERTAS 0.00 0.00

02.10.01 COBERTURA CON TEJA ANDINA INDUSTRIAL m2 41.57 38.46 1,598.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 41.57 1598.78 100.00% 02.10.02 CUMBRERA DE TEJA ANDINA INDUSTRIAL m2 8.15 47.21 384.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.15 384.76 100.00%